Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance 280 B NIZAMUDDINPURA POWER HOUSE ROAD MAU | MAU | MAU | UTTAR PRADESH | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 CrAdmitted-Finance | ₹3.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.9 CrAdmitted-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹3.9 Cr | L3 | Admitted-Finance |
| 4 | L4₹4.0 CrAdmitted-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹4.0 Cr | L4 | Admitted-Finance |
| 5 | L5₹4.0 CrAdmitted-Finance KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | ₹4.0 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Narayan Enterprises L5 | M/S CHAUDHARY ENTERPRISES L3 | Durga Engineers and Earth Movers L4 | M/S PRABHAT TRADERS L6 | M/S SATENDRA BAHADUR PAL L2 | M/s Yash Construction L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in Cutting including lift up to 1.5 mtr and lead up to 30mtr including cost of driver /assistant driver,POL,maintenance of machine ,contractor's profit ,taxes etc including levelling,dressing and compaction. | 3,75,159.64 | M3 | 82.5 ₹3,09,50,670.19 | 80 ₹3,00,12,771.09 | 81 ₹3,03,87,930.73 | 85 ₹3,18,88,569.28 | 77 ₹2,88,87,292.17 | 74 ₹2,77,61,813.26 Lowest |
| 1.02 | E/W for making daula including dreassing with manual compaction including cost of all material & labour T&P etc. As per direction of engineer in charge. | 2,00,758.6 | M3 | 15 ₹30,11,379 Lowest | 15 ₹30,11,379 Lowest | 16 ₹32,12,137.6 | 15 ₹30,11,379 Lowest | 17 ₹34,12,896.2 | 17 ₹34,12,896.2 |
| 1.03 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 40.2 | M3 | 560 ₹22,513.3 | 500 ₹20,101.16 Lowest | 500 ₹20,101.16 Lowest | 500 ₹20,101.16 Lowest | 570 ₹22,915.32 | 570 ₹22,915.32 |
| 1.04 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 1.5 | M3 | 740 ₹1,110.18 | 700 ₹1,050.17 Lowest | 700 ₹1,050.17 Lowest | 720 ₹1,080.17 | 750 ₹1,125.18 | 750 ₹1,125.18 |
| 1.05 | Dismantaling C.C. including base concreate and including stacking of dismentled material with in 60m distance. as directed by Engineer-in-Charge | 36.96 | M3 | 32 ₹1,182.85 Lowest | 35 ₹1,293.74 | 36 ₹1,330.71 | 35 ₹1,293.74 | 35 ₹1,293.74 | 35 ₹1,293.74 |
| 1.06 | Dismentalling & Removing Rcc hume pipe of 600 mm dia including cost of all material,labour , T&P etc. | 19 | Each | 220 ₹4,180 | 223 ₹4,237 | 200 ₹3,800 Lowest | 210 ₹3,990 | 223 ₹4,237 | 223 ₹4,237 |
| 1.07 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2 including all cost of labour and T&P complete. | 77.69 | M3 | 8,760 ₹6,80,582.45 Lowest | 9,214 ₹7,15,854.64 | 9,000 ₹6,99,228.54 | 9,205 ₹7,15,155.41 | 8,767.9 ₹6,81,196.21 | 9,214 ₹7,15,854.64 |
| 1.08 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge | 28.79 | M2 | 890 ₹25,623.1 | 900 ₹25,911 | 900 ₹25,911 | 750 ₹21,592.5 Lowest | 900 ₹25,911 | 900 ₹25,911 |
| 1.09 | Providing, laying & jointing, fixing R.C.C. NP3 hume pipe dia. 1200 mm as directed by Engineer-in-Charge as per drawing and I.D. specification. | 60 | RM | 6,510 ₹3,90,600 | 6,520 ₹3,91,200 | 6,520 ₹3,91,200 | 6,000 ₹3,60,000 Lowest | 6,520.4 ₹3,91,224 | 6,520 ₹3,91,200 |
| 1.10 | M 150 (1st class) brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 300.94 | M3 | 7,060 ₹21,24,638.93 Lowest | 7,070 ₹21,27,648.33 | 7,075 ₹21,29,153.03 | 7,070 ₹21,27,648.33 | 7,075.6 ₹21,29,333.6 | 7,075 ₹21,29,153.03 |
Tender Value
₹4.1 Cr
EMD Value
₹8.3 L
Closing Date
20 May 2026, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Canal Restoration Work
2026_UPIDC_1147928_9
04/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Azamgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,650
₹8.3 L
Yes
Azamgarh
9 Jul 2026
14 May 2026
20 May 2026
14 May 2026
20 May 2026
14 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in Cutting including lift up to 1.5 mtr and lead up to 30mtr including cost of driver /assistant driver,POL,maintenance of machine ,contractor's profit ,taxes etc including levelling,dressing and compaction. | 3,75,159.64 | M3 | - | - |
| 1.02 | E/W for making daula including dreassing with manual compaction including cost of all material & labour T&P etc. As per direction of engineer in charge. | 2,00,758.6 | M3 | - | - |
| 1.03 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 40.2 | M3 | - | - |
| 1.04 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 1.5 | M3 | - | - |
| 1.05 | Dismantaling C.C. including base concreate and including stacking of dismentled material with in 60m distance. as directed by Engineer-in-Charge | 36.96 | M3 | - | - |
| 1.06 | Dismentalling & Removing Rcc hume pipe of 600 mm dia including cost of all material,labour , T&P etc. | 19 | Each | - | - |
| 1.07 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2 including all cost of labour and T&P complete. | 77.69 | M3 | - | - |
| 1.08 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge | 28.79 | M2 | - | - |
| 1.09 | Providing, laying & jointing, fixing R.C.C. NP3 hume pipe dia. 1200 mm as directed by Engineer-in-Charge as per drawing and I.D. specification. | 60 | RM | - | - |
| 1.1 | M 150 (1st class) brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 300.94 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.63 MB
BOQ_2148432.xls
BOQ • 0.24 MB
Biddocument9.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].