Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹19.7 L+₹51,353.81 (2.68%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹21.4 L+₹2.3 L (11.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹21.5 L+₹2.3 L (12.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹21.5 L+₹2.3 L (12.1%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
23 Sept 2026, 2:00 pmClosed
EE MDDA
MDDA OFFICE TRANSPORT NAGAR,DEHRADUN
Painting work at ISBT FLYOVER, Dehradun
2026_MDDA_100178_1
MDDA/CIVIL/1018/19/26-27
Open Tender
Civil Works
Percentage
60 days
Dehradun
Please refer Tender documents.
1 document required · 1 mandatory
₹2,360
secretary MDDA
₹75,000
25 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
23 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 7,960 | SQM | 21.31 | ₹1,69,627.6 |
| 1.02 | 6 mm plaster on cement concrete or reinforced cement concrete work with white cement based polymer modified self curing mortar of approved make as per the direction of Engineer-In-Charge | 240 | SQM | 228.09 | ₹54,741.6 |
| 1.03 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete | 7,960 | SQM | 132.25 | ₹10,52,710 |
| 1.04 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. | 7,988 | SQM | 199.28 | ₹15,91,848.64 |
stage.html
html • 0.05 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
BOQ_118118.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .