Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
18 Jun 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manogna C L
POWERGRID, RHQ,Kavadiguda Main Road, Secunderabad
WC-4200-B-Making Temporary Bypass Arrangement for HT (33kV and 11kV) LT (415V) line crossings during stringing of 400KV Ananthapuram-Kurnool-3 D/c Line (TL-01-84.23KM)
SR1/T/W-TW/DOM/B00/25/06816
Open
Power/Energy Projects/Products
Turn-key
Andhra Pradesh
₹1.5 L
3 Jun 2025
3 Jun 2025
18 Jun 2025
3 Jun 2025
18 Jun 2025
3 Jun 2025
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM)
Specification No: SR-I/C&M/WC-4200(B)/2025/RFx-5002004473 (SR1/T/W-TW/DOM/B00/25/06816)
Enter the details of the bidder below:
Specify type of Bidder Sole Bidder
Name of the Bidder TRUE
Address of Registered Office TRUE
Mobile no. +91 TRUE
Printed Name TRUE
Designation TRUE
Place TRUE False
#REF! ATTACHMENT-10
Name : #REF! #REF!
Address : #REF! #REF!
Integrity Pact is annexed herewith this Volume.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Between 0 #REF!
Power Grid Corporation of India Limited 0 #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
0 #REF! having its Registered Office at ,
hereinafter referred to as
"The Bidder/Contractor"
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
(2) If Chairman and Managing Director obtains information on the conduct of any employee of POWERGRID which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, he will inform its Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to POWERGRID, or to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor will not commit any criminal offence under the relevant Anti-corruption Laws of India; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by POWERGRID as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a serious transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a serious transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures also exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The exclusion will be imposed for a minimum of 12 months and maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the exclusion prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID may forfeit the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III, POWERGRID may forfeit the Contract Performance Guarantee of this contract besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall declare in his Bid that no previous transgressions occurred in the last 3 years with any other Public Sector Undertaking or Government Department that could justify his exclusion from the tender process.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India, out of which one of the IEMs has been indicated in the NIT/IFB.
(2) The IEM is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. He has right of access to all project documentation. The IEM may examine any complaint received by him and submit a report to Chairman-cum-Managing Director, POWERGRID, at the earliest. He may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act. However, for ensuring the desired transparency and objectivity in dealing with the complaints arising out of any tendering process, the matter shall be referred to the full panel of IEMs, who would examine the records, conduct the investigations and submit report to Chairman-cum-Managing Director, POWERGRID, giving joint findings.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEM information as sought by him which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(6) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
85 Eighty Five 60 Sixty 52 Fifty Two 47 Forty Seven
8 Eight Hundred 9 Nine Hundred 3 Three Hundred 6 Six Hundred
55 Fifty Five Thousand 4 Four Thousand 10 Ten Thousand 91 Ninety One Thousand 0 0 0 0 0 plus
1 One Lac 0 0 6 Six Lac 0 0 0 0 1
1 One 1 One 1 One 1 One 0 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 0 1 1 1
4 Four 4 Four 4 Four 4 Four 0 1 0 0 0
5 Five 5 Five 5 Five 5 Five 0 1 0 0 1
6 Six 6 Six 6 Six 6 Six 0 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 0 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 0 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 0 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 0 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 0 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 0 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 0 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 0 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 0 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 0 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 0 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM)
Schedule-I : DSR Scheduled Items
Bidder’s Name and Address (Sole Bidder) : 0 Contract Services
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
0 Kavadiguda Main Raod, Secunderabad - 500080
All prices are in INR
Sl. No. DSR 2023 Ref No: Service Number SAC (Service Accounting Codes) Whether SAC in column ‘4’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘6’ is confirmed. If not indicate applicable rate of GST # Description (DSR'23 Items- Civil Works) Unit Quantity Unit Erection Charges including GST as per DSR 2023 GST % included in DSR 2023 Unit Erection Charges excluding GST Amount excluding GST GST
SCHEDULE ITEMS - CIVIL
Total of Schedule (CIVIL and E& M) Items as per DSR excluding Rebate 0.00 0.00
Percentage (%) above/below +/- on DSR 2021 Rates excluding GST mentioned above (to be quoted by Bidder) 0.00% 0.00
Add Amount above/below +/- on the amount for DSR Items as per quoted percentage 0.00 0.00
Total of Schedule I excluding GST considering offered % Rebate 0.00
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM)
Schedule-II : Non-Scheduled Items
Bidder’s Name 0 To:
Address : 0 Contract Services
0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
Kavadiguda Main Raod, Secunderabad - 500080
Sl. No. Service Number SAC Code Whether SAC in column ‘2’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘6’ is confirmed. If not indicate applicable rate of GST # Description (Non Schedule Items) Unit Quantity Unit Rate without GST Total Amount GST Remarks 6
A NON-SCHEDULE ITEMS: CIVIL
1 18% Making 33 kV Double Cut-point - cable laying, termination, erection of stays for temporary bye-pass arrangement EA 5 0 0.00 TRUE FALSE
2 18% Making 11 kV Double Cut-point - cable laying, termination, erection of stays for temporary bye-pass arrangement EA 44 0 0.00
3 18% Making 415 V LT line Double Cut-point - cable laying, termination, erection of stays for temporary bye-pass arrangement EA 26 0 0.00
4 18% Restoration of 33 kV line and mobilization of cable to another site after completion of stringing work EA 5 0 0.00
5 18% Restoration of 11 kV line and mobilization of cable to another site after completion of stringing work EA 44 0 0.00
6 18% Restoration of 415 V LT line and mobilization of cable to another site after completion of stringing work EA 26 0 0.00
Total of Non-Schedule Items False
As all the line items are Left Blank the bid is considered as Non-responsive
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM)
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Name : 0 Contract Services
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
0 Kavadiguda Main Raod,
Secunderabad - 500080
Sl. No. Description Total Price (INR)
1.1 TOTAL SCHEDULE NO. I
Supply & Installation Charges- Schedule Civil & Electrical Items for Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM) 0.00
1.2 TOTAL SCHEDULE NO. II
Supply & Installation Charges- Non-Schedule Civil & Electrical Items for Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM)
I Total of Service/Installation Charge (ITEMS TAB: Item 01 INSTALLATION FOR DCB (INR) : SRM ATB for BID PRICE SUMMARY Statement ) Non-responsive Bid
GST on Schedule-I 0.00
GST on Schedule-II
Total GST for BID PRICE SUMMARY Statement ) Non-responsive Bid
III GRAND TOTAL Non-responsive Bid
Date : 0 Printed Name : 0.00
Place : 0 Designation : 0.00
Specification No: SR-I/C&M/WC-4200(B)/2025/RFx-5002004473 (SR1/T/W-TW/DOM/B00/25/06816) Bid Form 2nd Envelope
BID FORM (Second Envelope)
Bid Proposal Ref. No.
Contract Services
Power Grid Corporation of India Ltd.,
Southern Region Transmission System-I
Name of Contract : Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM)
Dear Ladies and/or Gentlemen,
1.0 In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to undertake the above-named package in full conformity with the said Bidding Documents for the sum of Rs. Non-responsive Bid /- only or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to undertake the above-named package in full conformity with the said Bidding Documents for the sum of Rs. /- only or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. Non-responsive Bid
Sch-1 Schedules Items as per DSR 2021 excluding GST
Sch-2 Non-Scheduled Items
Sch-3 Grand Summary
2.3 We declare that as specified in Clause 4.6, ITB, Vol.-IA of the Bidding Documents, the prices of all the Services to be supplied under this contract shall be FIRM and doesnot subject to any price adjustment as per relevant clauses in bidding document.
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST , which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Name of Package :
Package No : CD01R
Specification No. :
Completion Period 12 Months
General guidelines for filling up the Attachments Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-II : 400KV Ananthapuram-Kurnool-III D/c Line (TL-01 – 84.23KM)
1 Fill up only green shaded cells in the relevent attachments.
3 Attachment 1 Bid Security : To be submitted as per proforma provided in the bidding document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Proprietorship 1
Private Limited Company 2
Enter following details of the bidder Public Limited Company
Specify type of Bidder [Select from drop down menu]
Address of Registered Office
Attachment-3(JV) CD01R CD01R
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address (Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 12
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-3(QR)
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Qualifying Requirement Data
Bidder’s Name and Address (Bidder) :
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Dear Ladies and/or Gentlemen,
We are furnishing the following details/document in support of qualifying requirement for the subject package(s).
A Technical Experience
Authorised Dealer/Sub dealer
Name of Manufacturer Authorised Representative
Authorization of Manufacturer Submitted
Please submit relevent document Certificate of Authorized Dealership Submitted
B Technical Experience Authorization of Manufacturer Submitted
Name of Manufacturer
2 Name of the Client
3 Address of Client
4 Contact Details of Client
Client should have 400 kV or above Transmission system
Please upload the Documentary Evidence Performance Report from Client
6 Acceptance of Final Bill by Client
Reference No. Certificate from CA
Any Other (Please Specify)
8 Performance Report from Client
Please upload Proof of work done Any Other (Please Specify)
2 Name of the Client
3 Address of Client
4 Contact Details of Client
2 Name of the Client
3 Address of Client
4 Contact Details of Client
B Performance Report from Client
Acceptance of Final Bill by Client
Certificate from CA
Any Other (Please Specify)
Sr. No. Financial Year Copy of Balance Sheet & P/L Account Uploaded
Average Turnover for Best Three Years
1 Copy of PAN Card Uploaded
Please upload Copy of PAN Card
2 Status of the Bidder
4 MOA & AOA/ Certificate of Incorporation Uploaded
Please upload Copy of Relavent document
Date : Printed Name :
Place : Designation :
Private Limited Company
Public Limited Company
Affidavit of Proprietorship Uploaded
Parnership Deed Uploaded
MOA & AOA/ Certificate of Incorporation Uploaded
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-4
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Form of Certificate of Origin and Eligibility
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
We hereby certify that equipment and materials to be supplied are produced in [Enter the name of country where from equipments & material shall be supplied] eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Enter the name of country where from equipments & material shall be supplied] eligible source country.
Date : Printed Name :
Place : Designation :
country. country. [Enter the name of country where from equipments & material shall be supplied] [Enter the name of country where from equipments & material shall be supplied]
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
S.No. For Equipment Item Description Unit Quantity
Date : Printed Name :
Place : Designation :
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address (Bidder) : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-4A
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-5
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-5
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
(Manufacturer's Authorization Form)
Contract Services
Power Grid Corporation of India Ltd.,
"Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001 Name of Manufecture Name/Description of Goods Factory Address Name & Address of Bidder package name alongwith project name
…(insert name of the Manufacturer) .. …(insert name and/or description of the goods) … ..(insert address of factory) ..
WE …(insert name of the Manufacturer) .. who are established and reputable manufacturers of …(insert name and/or description of the goods) …. having production facilities at ..(insert address of factory) .., , , do hereby authorize , , , (hereinafter, the “Bidder”) to submit a bid, and subsequently negotiate and sign the Contract with you against IFB for Supply of Insulator, E/W & OPGW including Hardware & accessories and Execution of erection works for diversion / shifting works of existing 765 KV D/C Durg - Wardha TL -1, 400 kV D/C (Twin) Raipur - Bhadrawati TL- 2 & 3, 400 kV D/C Bhilai/Raipur Bhadrawati TL- 1 Transmission Lines for construction / development of Wadsa-Gadchiroli new Broad gauge Railway track including the above plant & equipment or other goods produced by us. 0
WE …(insert name of the Manufacturer) .. who are established and reputable manufacturers of …(insert name and/or description of the goods) …. having production facilities at We hereby extend our full guarantee and warranty for the above specified goods offered supporting the supply by the Bidder against these Bidding Documents, and duly authorize said Bidder to act on our behalf in fulfilling these guarantee and warranty obligations.
We hereby extend our full guarantee and warranty for the above specified goods offered supporting the supply by the Bidder against these Bidding Documents, and duly authorize said Bidder to act on our behalf in fulfilling these guarantee and warranty obligations. We also hereby declare that we and have entered into a formal relationship in which, during the duration of the Contract (including warranty/defects liability). We, the Manufacturer or Producer, will make our technical and engineering staff fully available to the technical and engineering staff of the successful Bidder to assist that Bidder, on a reasonable and best effort basis, in the performance of all its obligations to the Purchaser under the Contract. ..(insert address of factory) .., , , do hereby authorize , , , (hereinafter, the “Bidder”) We also hereby declare that we and have entered into a formal relationship in which, during the duration of the Contract (including warranty/defects liability).
For and on behalf of the …(insert name of the Manufacturer) .. to submit a bid, and subsequently negotiate and sign the Contract with you against IFB for Supply of Insulator, E/W & OPGW including Hardware & accessories and Execution of erection works for diversion / shifting works of existing 765 KV D/C Durg - Wardha TL -1, 400 kV D/C (Twin) Raipur - Bhadrawati TL- 2 & 3, 400 kV D/C Bhilai/Raipur Bhadrawati TL- 1 Transmission Lines for construction / development of Wadsa-Gadchiroli new Broad gauge Railway track including the above plant & equipment or other goods produced by us. We, the Manufacturer or Producer, will make our technical and engineering staff fully available to the technical and engineering staff of the successful Bidder to assist that Bidder, on a reasonable and best effort basis, in the performance of all its obligations to the Purchaser under the Contract.
In the capacity of
Date : Printed Name :
Place : Designation :
Note :1 The letter of Undertaking should be on the letterhead of the Manufacturer and should be signed by a person competent and having Power of Attorney to legally bind the Manufacturer. It shall be included by the bidder in its bid.
2 Above undertaking shall be registered or notarized so as to be legally enforceable.
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-6
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Guarantee Declaration
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-6B
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-6 C
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-7
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Information regarding Ex-employees of POWERGRID in our Organisation
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-8
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Declaration regarding Social Accountability
Bidder’s Name and Address (Bidder) : To:
Name : Power Grid Corporation of India Ltd.,
Address : Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Contract Services
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Western Region -I Headquarters
0 Sampriti Nagar, Nari Ring Road
0 PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name : 0
Place : 0 Designation : 0
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM) under Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813)
(For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 1 of 8
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
ࠀ㠀瑉椠敨敲祢愠牧敥祢愠摮戠瑥敷湥琠敨瀠牡楴獥愠湵敤㩲$匀捥楴湯䤠ⴠ䌠浯業浴湥獴漠佐䕗䝒䥒̈́ㄨ眩佐䕗䝒䥒⁄潣浭瑩瑩敳晬琠慴敫愠汬洠慥畳敲敮散獳牡⁹潴瀠敲敶瑮挠牯畲瑰潩湡潴漠獢牥敶琠敨映汯潬楷杮瀠楲据灩敬Ⱥ
III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.Section IX - Pact DurationÄThis Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.Section X - Other ProvisionsThis agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact. cKd§If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.£Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).xViews expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.^FbeLf#ñCVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I. Page 7 of 8ÕShould one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions. Signature (Office Seal)Name :Name : & & .. & & & & & . & & & . Witness 1 : Page 8 of 8NILNA$(Signature) (For & On behalf of POWERGRID) !We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope. J5 âWe undertake, if our bid is accepted, to commence the work immediately upon your Notification/Letter of Award to us, and to achieve the completion of works and related services within the time stated in the Bidding Documents.If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents. Attachment-9Name of the workWork Order DetailsCopy of Work order uploaded)Document submitted as Proof of CompletionDate of Completion of Work+Details of Document for Proof of Completion Issued by Proof of Completion UploadedA.2MAAThundredthousandlakhcrorezero twenty one twenty two twenty three twenty four twenty five twenty six twenty seven twenty eight twenty nine thirty thirty one thirty two thirty three thirty four thirty five thirty six thirty seven thirty eight thirty nineforty forty one forty two forty three forty four forty five forty six forty seven forty eight forty ninefifty fifty one fifty two fifty three fifty four fifty five fifty six fifty seven fifty eight fifty ninesixty sixty one sixty two sixty three sixty four sixty five sixty six sixty seven sixty eight sixty nineseventy seventy one seventy two seventy three seventy four seventy five seventy six seventy seven seventy eight seventy nineeighty eighty one eighty two eighty three eighty four eighty five eighty six eighty seven eighty eight eighty nineninety ninety one ninety two ninety three ninety four ninety five ninety six ninety seven ninety eight ninety nine In support of the additional information required as per ITB Sub-Clause 9.3(k) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):9JN CThe bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(k)(i)]" GCC 8.0(i)Turnover (in Rs. Lakh)?Information regarding ex-employees of Employer in Bidder’s firm_䤁渀昀漀爀洀愀琀椀漀渀 昀漀爀 䔀 ጀ†瀀愀礀洀攀渀琀Ⰰ 倀䘀 搀攀琀愀椀氀猀 愀渀搀 搀攀挀氀愀爀愀琀椀漀渀 昀漀爀 䴀椀挀爀漀⼀匀洀愀氀氀 愀渀搀 䴀攀搀椀甀洀 䔀渀琀攀爀瀀爀椀猀攀⤀ ᜀ摁楤楴湯污䤠普牯慭楴湯舠畆瑲敨Ⱳ眠敨敲祢挠湯楦浲琠慨⁴硥散瑰愠敭瑮潩敮湩琠敨䄠瑴捡浨湥⁴㔭⠠敄楶瑡潩獮 敨敲景Ⱐ映牯業杮瀠牡⁴景漠牵䘠物瑳䔠癮汥灯㩥 倀牡湴牥桳灩ǽ 琀栀攀 爀攀挀攀椀瀀琀 漀昀 眀栀椀挀栀 椀猀 栀攀爀攀戀礀 愀挀欀渀漀眀氀攀搀最攀搀Ⰰ 眀攀 琀栀攀 甀渀搀攀爀猀椀最渀攀搀Ⰰ 漀昀昀攀爀 琀漀 攀砀攀挀甀琀攀 琀栀攀 眀漀爀欀 甀渀搀攀爀 琀栀攀 愀戀漀瘀攀ⴀ渀愀洀攀搀 瀀愀挀欀愀最攀 椀渀 昀甀氀氀 挀漀渀昀漀爀洀椀琀礀 眀椀琀栀 琀栀攀 猀愀椀搀 䈀椀搀搀椀渀最 䐀漀挀甀洀攀渀琀猀⸀ 䤀渀 愀挀挀漀爀搀愀渀挀攀 眀椀琀栀 䤀吀䈀 䌀氀愀甀猀攀 㤀⸀ 漀昀 琀栀攀 䈀椀搀搀椀渀最 䐀漀挀甀洀攀渀琀猀Ⰰ 愀猀 瀀攀爀 眀栀椀挀栀 琀栀攀 戀椀搀 猀栀愀氀氀 戀攀 猀甀戀洀椀琀琀攀搀 戀礀 琀栀攀 戀椀搀搀攀爀 甀渀搀攀爀 ᰀ匠椀渀最氀攀 匀琀愀最攀 ⴀ 吀眀漀 䔀渀瘀攀氀漀瀀攀ᴀ†瀀爀漀挀攀搀甀爀攀 漀昀 戀椀搀搀椀渀最⸀ 䄀挀挀漀爀搀椀渀最氀礀Ⰰ 眀攀 栀攀爀攀戀礀 猀甀戀洀椀琀 漀甀爀 䈀椀搀Ⰰ 椀渀 琀眀漀 攀渀瘀攀氀漀瀀攀猀 椀⸀攀⸀ 䘀椀爀猀琀 䔀渀瘀攀氀漀瀀攀 ጀ†吀攀挀栀渀漀 ጀ†䌀漀洀洀攀爀挀椀愀氀 倀愀爀琀 ☀ 匀攀挀漀渀搀 䔀渀瘀攀氀漀瀀攀 ⴀ 倀爀椀挀攀 倀愀爀琀 ⠀琀漀 戀攀 漀瀀攀渀攀搀 猀甀戀猀攀焀甀攀渀琀氀礀⤀⸀ 敗挠湯潦浲琠慨⁴桴慭整楲污漠晦牥摥猠慨汬栠癡業楮畭数晲牯慭据灳捥晩敩湩吠捥湨捩污匠数楣楦慣楴湯敗映牵桴牥朠慵慲瑮敥琠敨瀠牥潦浲湡散支晦捩敩据⁹景琠敨攠畱灩敭瑮湩爠獥潰獮潴琠敨吠捥湨捩污匠数楣楦慣楴湯鴠汰慥敳攠瑮䤽⡆㑃㸱䠽㤴䤬⡆㝃㸴䠽㤴∬Ⱒ䙉䌨㐷㴾㕈ⰰ瀢敬獡湥整洠牯潷歲漠㐱氠歡湡扡癯≥∬潷歲椠獮晵楦楣湥≴⤩攩洠牯潷歲漠㐱氠歡湡扡癯湉整牧瑩⁹慐瑣椠湡敮數敨敲楷桴琠楨潶畬敭䐁攀猀椀最渀愀琀椀漀渀 㨀 ☀☠⸠⸀ ☀☠†☀☠☠⸠ ☀圠佐䕗䝒䥒⁄湩整摮潴愠慷摲湵敤慬摩搭睯牯慧楮慳楴湯污瀠潲散畤敲ⱳ挠湯牴捡⡴⥳映牯ࠠ畓灰祬㈠䄀㌮䌀浯汰瑥摥䄠潭湵⁴景眠牯刨⥳ 栀癡湩瑩敒楧瑳牥摥传晦捩瑡ᴠĀ…………………………………………………………………………….䌀灯⁹景䔠敬瑣楲慣潣瑮慲瑣牯氠捩湥散唠汰慯敤뙤⁉敨敲祢搠捥慬敲琠慨⁴桴潤畣敭瑮畳浢瑩整⽤灵潬摡摥戠⁹獵琠敤潭獮牴瑡桴潣灭楬湡散琠桴灳捥晩敩畑污晩楹杮删煥極敲敭瑮映牯琠楨慰正条牡牴敵畡桴湥楴湡潣牲捥†圀牯㘳ĀCommentary on the Employer’s Technical Specifications 浉潰瑲摥䴀歡景琠敨䔠畱灩敭瑮传晦牥摥䴀摯汥漠桴煅極浰湥⁴晏敦敲賓桔楂摤牥猠潨汵潣灭祬眠瑩污桴吠捥湨捩污倠牡浡瑥牥敭瑮潩敮湩∠敔档楮慣灓捥晩捩瑡潩獮⠠潖畬敭䤭⥉漠桴楢潤畣敭瑮湡捳湡敮潣祰漠桴慳敭搠汵⁹楳湧摥愠摮猠慴灭摥漠污慰敧桳污敢甠汰慯敤祢琠敨戠摩敤污湯楷桴琠敨戠摩ɛ圁攀 搀攀挀氀愀爀攀 琀栀愀琀 眀攀 愀爀攀 愀眀愀爀攀 漀昀 愀渀搀 栀愀瘀攀 最漀渀攀 琀栀爀漀甀最栀 琀栀攀 ᰀ䌠漀搀攀 漀昀 䈀甀猀椀渀攀猀猀 䌀漀渀搀甀挀琀 愀渀搀 䔀琀栀椀挀猀 昀漀爀 匀攀渀椀漀爀 䴀愀渀愀最攀洀攀渀琀 倀攀爀猀漀渀渀攀氀ᴀ†愀渀搀 ᰀ䌠漀搀攀 漀昀 䈀甀猀椀渀攀猀猀 䌀漀渀搀甀挀琀 愀渀搀 䔀琀栀椀挀猀 昀漀爀 䈀漀愀爀搀 䴀攀洀戀攀爀猀ᴀ†漀昀 倀伀圀䔀刀䜀刀䤀䐀 ⠀栀攀爀攀椀渀愀昀琀攀爀 爀攀昀攀爀爀攀搀 琀漀 愀猀 琀栀攀 ᰀ䌠漀搀攀 漀昀 䌀漀渀搀甀挀琀ᴀ⤠⸀ 圀攀 昀甀爀琀栀攀爀 甀渀搀攀爀猀琀愀渀搀 琀栀愀琀 愀猀 瀀攀爀 琀栀攀 ᰀ䌠漀搀攀 漀昀 䌀漀渀搀甀挀琀ᴀⰠ 匀攀渀椀漀爀 䴀愀渀愀最攀洀攀渀琀 倀攀爀猀漀渀渀攀氀 椀渀挀氀甀搀椀渀最 䈀漀愀爀搀 䴀攀洀戀攀爀猀Ⰰ 眀栀漀 栀愀瘀攀 爀攀琀椀爀攀搀⼀爀攀猀椀最渀攀搀 昀爀漀洀 倀伀圀䔀刀䜀刀䤀䐀Ⰰ 猀栀愀氀氀 渀漀琀 愀挀挀攀瀀琀 愀渀礀 愀瀀瀀漀椀渀琀洀攀渀琀 漀爀 瀀漀猀琀Ⰰ 愀猀 搀攀琀愀椀氀攀搀 椀渀 琀栀攀 爀攀昀攀爀爀攀搀 ᰀ䌠漀搀攀 漀昀 䌀漀渀搀甀挀琀ᴀⰠ 眀椀琀栀椀渀 礀攀愀爀 昀爀漀洀 琀栀攀 搀愀琀攀 漀昀 挀攀猀猀愀琀椀漀渀 漀昀 猀攀爀瘀椀挀攀⼀搀椀爀攀挀琀漀爀猀栀椀瀀 甀渀氀攀猀猀 愀瀀瀀爀漀瘀攀搀 戀礀 琀栀攀 䌀漀洀瀀攀琀攀渀琀 䄀甀琀栀漀爀椀琀礀⸀씀捁潣摲湩汧ⱥ圠敨敲祢映牵楮桳琠敨搠瑥楡獬漠硥攭灭潬敹獥漠佐䕗䝒䥒⁄桷慨敲楴敲⽤爠獥杩敮瑡琠敨氠癥汥漠敇敮慲慍慮敧湡扡癯牦浯倠坏剅則䑉愠摮猠扵敳畱湥汴⁹慨敶戠敥浥汰祯摥戠⁹獵㰺湉挠獡桴慤整漠潪湩湩湩琠敨戠摩敤❲牯慧楮慺楴湯漠畳档攠浥汰祯敥椠楷桴湩ㄠ礠慥牦浯琠敨搠瑡景爠瑥物浥湥⽴爠獥杩慮楴湯映潲佐䕗䝒䥒ⱄ丠扯敪瑣潩敃瑲晩捩瑡⽥愠灰潲慶牦浯琠敨䌠浯数整瑮䄠瑵潨楲祴洠獵⁴敢映牵楮桳摥愠潬杮眠瑩桴楢牯猠扵敳畱湥⁴桴潲杵汣牡晩捩瑡潩異獲慵瑮琠呉⁂汃畡敳㈠⸱Ń䤀慣敳漠潮畳浢獩楳湯漠潎传橢捥楴湯䌠牥楴楦慣整⼠愠灰潲慶景琠敨䌠浯数整瑮䄠瑵潨楲祴獡爠煥極敲Ɽ眠湵敤獲慴摮琠慨⁴佐䕗䝒䥒⁄桳污敤污眠瑩畳档挠獡獥愠数瑩潐楬祣愠摮瀠潲散畤敲湩瘠杯敵桷捩慭⁹污潳爠獥汵⁴湩爠橥捥楴湯漠畯楢†敗愠獬潣普物桴瑡倠坏剅則䑉猠慨汬戠桴潳敬樠摵敧椠桴獩爠来牡ÿ圁攀 昀甀爀琀栀攀爀 搀攀挀氀愀爀攀 琀栀愀琀 愀渀礀 洀椀猀爀攀瀀爀攀猀攀渀琀愀琀椀漀渀 漀爀 猀甀戀洀椀猀猀椀漀渀 漀昀 昀愀氀猀攀 ⼀ 昀漀爀最攀搀 搀漀挀甀洀攀渀琀猀 ⼀ 椀渀昀漀爀洀愀琀椀漀渀 椀渀 琀栀椀猀 爀攀最愀爀搀 猀栀愀氀氀 戀攀 搀攀愀氀琀 眀椀琀栀 愀猀 瀀攀爀 琀栀攀 瀀爀漀瘀椀猀椀漀渀猀 漀昀 琀栀攀 䤀渀琀攀最爀椀琀礀 倀愀挀琀 愀渀搀 ⼀ 漀爀 琀栀攀 䈀椀搀搀椀渀最 䐀漀挀甀洀攀渀琀猀 愀渀搀 ⼀ 漀爀 倀伀圀䔀刀䜀刀䤀䐀ᤀ猠 瀀漀氀椀挀礀 愀渀搀 瀀爀漀挀攀搀甀爀攀猀⸀Ԁ潎整줺Ā1) “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com.x㈀ 桔湩潦浲瑡潩湩猠浩汩牡映牯慭⁴桳畯摬戠畦湲獩敨潦慥档瀠牡湴牥漠潪湩⁴敶瑮牵湩挠獡景樠楯瑮瘠湥畴敲戠摩휮Ā 3) In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.D⠀敄汣牡瑡潩潦慴⁸硥浥瑰潩獮敲畤瑣潩獮污潬慷据獥漠敢敮楦獴븩敗挠湯楦浲琠慨⁴敷愠敲猠汯汥⁹敲灳湯楳汢潦扯慴湩湩潦汬睯湩慴⁸硥浥瑰潩獮敲畤瑣潩獮污潬慷据獥漠敢敮楦獴椠敲灳捥⁴景猠灵汰敩湵敤桴畳橢捥⁴慰正条ⱥ椠慣敳漠睡牡
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Designation : Designation :
Designation : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-10
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise)
Bidder’s Name and Address (Bidder) : To:
Power Grid Corporation of India Ltd.,
Name : Western Region -I Headquarters
Address : Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
I. We have read the provision in the Bidding Documents regarding furnishing the option for advance payment.
Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents,
we hereby confirm to opt the following:
Interest Bearing Initial Advance: Supply Portion
(Select from drop down list)
We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
4. Permanent Account (PAN) No.
5 Private Limited Company
7 PF Registration No. of the Company
8 PF Regional Office covered (with Address)
9 Name of Contact Person
10 Telephone No(s)
11 Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Saving Account
12 9 digit MICR code printed at bottom in middle, next to cheque no.
13 IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-11
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Additional Information
Bidder’s Name and Address (Bidder) : To:
Power Grid Corporation of India Ltd.,
Name : Western Region -I Headquarters
Address : Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
0.0 The Bidder shall furnish
0.0 Litigation History
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
0.0 OTHER INFORMATION
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-12
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Power Grid Corporation of India Ltd.,
Name : Western Region -I Headquarters
Address : Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
(i) there are no discrepencies/inconsistencies and deviations/omissions/reservations to the Bidding Documents, in the Second Envelope bid;
We also confirm that in case any discrepencies/inconsitencies and deviations/omissions/reservations, as referred to in para (i) and (ii) above, is observed in the Second Envelope, the same shall be deemed as withdrawn/rectified without any finacial implication, whatsoever to POWERGRID. However, in case of any artithmetical errors, the same shall be governed as per the provisions of ITB Sub-clause 27.2 read in conjuction with BDS.
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-13
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Power Grid Corporation of India Ltd.,
Name : Western Region -I Headquarters
Address : Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-14
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Power Grid Corporation of India Ltd.,
Name : Western Region -I Headquarters
Address : Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-15
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Power Grid Corporation of India Ltd.,
Name : Western Region -I Headquarters
Address : Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Attachment-16
Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM)
Bidder’s Name and Address (Bidder) : To:
Power Grid Corporation of India Ltd.,
Name : Western Region -I Headquarters
Address : Sampriti Nagar, Nari Ring Road
PO: Uppalwadi, Nagpur (MS) -440026
Date : Printed Name :
Place : Designation :
Specification Ref No.: SR-I/C&M/WC-4200(A)/2025/RFx-5002004472 (SR1/T/W-TW/DOM/B00/25/06813) Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th 6 June
7 seven 7 th 7 July
To: 8 eight 8 th 8 August
Power Grid Corporation of India Ltd., 9 nine 9 th 9 September
Western Region -I Headquarters 10 ten 10 th 10 October
Sampriti Nagar, Nari Ring Road 11 eleven 11 th 11 November
PO: Uppalwadi, Nagpur (MS) -440026 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Making Temporary Bypass Arrangement for HT (33kV and 11kV) & LT (415V) line crossings during stringing of lines associated with “Transmission Scheme for Solar Energy Zone in Ananthpurm and Kurnool, Andhra Pradesh Pkg-I : 400KV Ananthapuram-Kadapa D/C Line (TL-02-184.23KM) 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 16 sixteen 16 th
0.0 Having examined the Bidding Documents, including Amendment Nos. NIL dated NA the receipt of which is hereby acknowledged, we the undersigned, offer to execute the work under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
0.0 Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Pay Order 19 nineteen 19 th
(b) Attachment 2 A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Please note that if amount of bid security is less than Rs.595000/-, your bid may be rejected Bank Guarantee (0) 21 st
(c) Attachment 3 The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3(c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Applicable 23 th
Not Applicable 24 th
(d) Attachment 4 The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. 25 th
(e) Attachment 5 The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 26 th
(f) Attachment 6 A Guarantee Declaration 27 th
(g) Attachment 7 28 th
(h) Attachment 8 Declaration regarding Social Accountability 29 th
(i) Attachment 9 30 th
(j) Attachment 10 31 st
(k) Attachment 11
(l) Attachment 12 Declaration
(m) Attachment 13
(n) Attachment 14
(o) Attachment 15
(p) Attachment 16
0.0 Construction of the Contract
0.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) Terms of Payment
(c) Performance Security
(d) Taxes and Duties
(e) Completion Time Guarantee
(f) Defect Liability
(g) Patent Indemnity
(h) Settlement of Disputes
0.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
0.0 We understand that you are not bound to accept the lowest or any bid you may receive.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
ElectronicForms™
View - Template of ElectronicForm™
To close this Screen, click on the [Close] button located on the bar above, or at the bottom of the Screen
Template of ElectronicForm™
Relevant Bid-Part Techical
ElectronicForm™ Template ID 7PG-2010-FT000010
Template Reference TECHNO-COMMERICIAL (First Envelope)
Template Description Tower Package CD01R Specification No. : WR-I/C&M/SYE/I-2838:2023/NIT-xxx/Rfx- 500200xxxx
Supply of Insulator, E/W & OPGW including Hardware & accessories and Execution of erection works for diversion / shifting works of existing 765 KV D/C Durg - Wardha TL -1, 400 kV D/C (Twin) Raipur - Bhadrawati TL- 2 & 3, 400 kV D/C Bhilai/Raipur Bhadrawati TL- 1 Transmission Lines for construction / development of Wadsa-Gadchiroli new Broad gauge Railway track
Section-2 (Outline of Requirements)
* 1 Integrity Pact Details
Submitted (Doc. Code No. DC-9008-April-2009-Rev-0) Yes
* 2 BID SECURITY DETAILS
2 (a) Submitted Yes
* 2 (b) Bid Security No.
* 2 (c) Issued by (Name of Bank)
* 2 (d) Bid Security Amount
* 2 (e) Valid upto
* 1. AUTHORIZED SIGNATORY (Sole Bidder / Lead Partner of JV)
1 (b) Designation
2. AUTHORIZED SIGNATORY (Other Partner of JV)
(If Bidder is JV)
2 (b) Designation
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
RFx-5002004473_030625.pdf
pdf • 0.02 MB
Price_Schedule_PkgII.xlsx
xlsx • 0.21 MB
Scope of Work.pdf
pdf • 0.13 MB
First Envelope and Bid Forms-I.xls
xls • 2.95 MB
Safety Pact.docx
docx • 0.02 MB
1-1-IFB.docx
docx • 0.12 MB
1-2-ITB.doc
doc • 0.74 MB
1-3- BDS.doc
doc • 0.59 MB
1-3A-Annex-QR.docx
docx • 0.10 MB
1-4-GCC.pdf
pdf • 1.93 MB
1-5-SCC.doc
doc • 0.64 MB
1-6-Forms and Proc.doc
doc • 0.09 MB
1-6-Safety Plan.docx
docx • 0.04 MB
2-1-A-Model Rules & Safety Code.pdf
pdf • 0.15 MB
Form No MII MLC.docx
docx • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .