| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.5 CrAccepted-AOC | ₹20.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹20.5 CrRejected-AOC | ₹20.5 Cr | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹40.2 CrRejected-AOC | ₹40.2 Cr | L-3 | Rejected-AOC L-4 |
| 4 | L-4₹21.2 CrRejected-AOC | ₹21.2 Cr | L-4 | Rejected-AOC L-3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | SAMAL BUILDERS PVT. LTD L1 | DIVINE ENTERPRISES L3 | sree ganesh construction L2 | SLR INFRASTRUCTURE PVT LTD L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Removing Existing soil cover :Removing of top/slope soil cover of the existing ash mound as directed by MIC including ploughing where ever required, including removal & disposal of vegetations, stripping, lifting, transporting and stacking in proper shape at designed locations All complete as per the specification and direction of
MIC.(Rate shall be included for all the activities mentioned above but the measurement for payment shall be as per the area of top/slope soil cover removed | 4,15,000 | SQM | 20 ₹83,00,000 | 29.19 ₹1,21,13,850 | 16 ₹66,40,000 Lowest | 90 ₹3,73,50,000 |
| 2.00 | Excavating, transporting and filling ash :Excavating ash from designated borrow area inside the existing ash ponds, including haulage roads/formation of access for transportation, dumping, spreading in specified layers and compacting with necessary number of passes using vibratory rollers with sheep foot from existing level of ash deposits in the pond to required level, as per drawings and specifications and directions of the Engineer-in-charge within all leads. Payment shall be made as per cross-sectional area after deducting 5% for voids. Note:- Borrow areas for collecting the ash shall be as directed by the Engineer-in-charge. | 17,60,000 | CUM | 112 ₹19,71,20,000 Lowest | 137.72 ₹24,23,87,200 | 121 ₹21,29,60,000 | 185 ₹32,56,00,000 |
| 3.00 | Loading, transporting and filling earth :Loading & transportation of the available earth from the stack to the place of work including all leads and lifts, and dumping of the excavated material
to fill areas at all heights and descents including spreading, leveling in layers of 200mm to 250mm thick to correct slope and grades inclusive of special compaction using approved vibratory rollers with sheep foot with the density equal to 95% of the maximum dry density (standard proctor) including providing extra width 500mm to facilitate the full compaction at edges of earth cover, dressing to profile, and trimming all complete as per drawings, specifications and directions of the Engineer-in-charge, all materials, tools, royalty, plant and labour complete. Payment shall be made as per cross-sectional area as per drawing after deducting 5% for voids | 80,000 | CUM | 170 ₹1,36,00,000 | 168.72 ₹1,34,97,600 | 142 ₹1,13,60,000 Lowest | 160 ₹1,28,00,000 |
| 4.00 | Brickwork with flyash bricks :Providing and laying Brickwork with fly ash lime bricks(FAL-G ) confirming to IS 12894-1989 or cement ash bricks of class designation 100 in, slope drains, parapet walls etc in cement mortar in 1:4 (1 cement: 4 sand) with pointing and at all elevations and lead distance as per drawings, scaffolding, curing, fair cutting, keeping in plumb, leveling including all materials, labour, tools and tackles as per specifications and as directed by the Engineer-in-charge | 450 | CUM | 5,570 ₹25,06,500 | 5,289.87 ₹23,80,441.5 Lowest | 5,900 ₹26,55,000 | 6,350 ₹28,57,500 |
| 5.00 | Providing cement plaster :Providing 15mm thick Cement plaster in 1:4 (1 cement: 4 sand) over fly ash brick masonry concrete works at all heights including scaffolding, curing, as per specification, drawings and direction of engineer-in-charge all materials, tools, and labour complete | 5,100 | SQM | 250 ₹12,75,000 Lowest | 296.39 ₹15,11,589 | 290 ₹14,79,000 | 420 ₹21,42,000 |
| 6.00 | Providing and placing PCC 1:3:6 :Providing and placing cement concrete of 1:3:6 mix with maximum size of stone aggregate of 20mm at all elevation for foundations of drains, sump
pits, settlement pillars, slope drains, etc. including all labour material, equipment, handling, transporting, batching, mixing, placing, leveling, compacting, curing etc. complete as per drawings, specifications and directions of the Engineer-in-charge | 375 | CUM | 6,750 ₹25,31,250 | 4,423.33 ₹16,58,748.75 Lowest | 5,600 ₹21,00,000 | 9,500 ₹35,62,500 |
| 7.00 | Grass Turfing :Providing, laying and rendering protective treatment by turfing on sloped surface of dyke with selected grass sods of dense permanent well rooted growth, obtained from selected areas as directed including loosening the soil, watering for 30 days or till the grass are deep rooted into the original soil whichever is later, all as per drawings and directions of the Engineer-in-charge, all materials, tools and labour complete | 50,000 | SQM | 41 ₹20,50,000 Lowest | 46.54 ₹23,27,000 | 76 ₹38,00,000 | 140 ₹70,00,000 |
| 8.00 | Neat Cement Punning :Providing neat cement punning over cement plasters works in cross drains including curing, as per specification, drawings and direction of engineer-in-charge all materials, tools, and labour complete | 1,300 | SQM | 32 ₹41,600 Lowest | 48.33 ₹62,829 | 300 ₹3,90,000 | 575 ₹7,47,500 |
| 9.00 | Dismatling boulder pitching, transportin :Dismantling dry stone pitching from existing stack over pond II including stacking of serviceable material upto a lead of 1.00 km and disposal of
unserviceable material.as per the direction of engineer-in-charge all materials, tools, and labour complete.Payment shall be made after deducting 20% for voids | 5,000 | CUM | 1,250 ₹62,50,000 | 296.41 ₹14,82,050 | 171 ₹8,55,000 Lowest | 1,900 ₹95,00,000 |
| Sl.NoBidder Name | |||||||
Tender Value
Refer Docs
EMD Value
₹24.1 L
Closing Date
3 Jan 2026, 3:00 pmClosed
Mr. Shubham Kumar
GET (Mech.) TnC, CPP, NALCO, ANGUL
Formation of Ash Mound (7th phase) over Ash Pond-II (Part-A) above 115 MRL of Captive Power Plant, NALCO, Angul, Odisha
2025_NALCO_888323_1
MC-5531
Open Tender
Miscellaneous Services
Tender cum Auction
540 days
CPP, NALCO, ANGUL
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹24.1 L
Yes
18 Jun 2026
3 Dec 2025
6 Jan 2026
4 Dec 2025
3 Jan 2026
4 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing Existing soil cover :Removing of top/slope soil cover of the existing ash mound as directed by MIC including ploughing where ever required, including removal & disposal of vegetations, stripping, lifting, transporting and stacking in proper shape at designed locations All complete as per the specification and direction of
MIC.(Rate shall be included for all the activities mentioned above but the measurement for payment shall be as per the area of top/slope soil cover removed | 4,15,000 | SQM | 100 | ₹4,15,00,000 |
| 2 | Excavating, transporting and filling ash :Excavating ash from designated borrow area inside the existing ash ponds, including haulage roads/formation of access for transportation, dumping, spreading in specified layers and compacting with necessary number of passes using vibratory rollers with sheep foot from existing level of ash deposits in the pond to required level, as per drawings and specifications and directions of the Engineer-in-charge within all leads. Payment shall be made as per cross-sectional area after deducting 5% for voids. Note:- Borrow areas for collecting the ash shall be as directed by the Engineer-in-charge. | 17,60,000 | CUM | 100 | ₹17,60,00,000 |
| 3 | Loading, transporting and filling earth :Loading & transportation of the available earth from the stack to the place of work including all leads and lifts, and dumping of the excavated material
to fill areas at all heights and descents including spreading, leveling in layers of 200mm to 250mm thick to correct slope and grades inclusive of special compaction using approved vibratory rollers with sheep foot with the density equal to 95% of the maximum dry density (standard proctor) including providing extra width 500mm to facilitate the full compaction at edges of earth cover, dressing to profile, and trimming all complete as per drawings, specifications and directions of the Engineer-in-charge, all materials, tools, royalty, plant and labour complete. Payment shall be made as per cross-sectional area as per drawing after deducting 5% for voids | 80,000 | CUM | 100 | ₹80,00,000 |
| 4 | Brickwork with flyash bricks :Providing and laying Brickwork with fly ash lime bricks(FAL-G ) confirming to IS 12894-1989 or cement ash bricks of class designation 100 in, slope drains, parapet walls etc in cement mortar in 1:4 (1 cement: 4 sand) with pointing and at all elevations and lead distance as per drawings, scaffolding, curing, fair cutting, keeping in plumb, leveling including all materials, labour, tools and tackles as per specifications and as directed by the Engineer-in-charge | 450 | CUM | 100 | ₹45,000 |
| 5 | Providing cement plaster :Providing 15mm thick Cement plaster in 1:4 (1 cement: 4 sand) over fly ash brick masonry concrete works at all heights including scaffolding, curing, as per specification, drawings and direction of engineer-in-charge all materials, tools, and labour complete | 5,100 | SQM | 100 | ₹5,10,000 |
| 6 | Providing and placing PCC 1:3:6 :Providing and placing cement concrete of 1:3:6 mix with maximum size of stone aggregate of 20mm at all elevation for foundations of drains, sump
pits, settlement pillars, slope drains, etc. including all labour material, equipment, handling, transporting, batching, mixing, placing, leveling, compacting, curing etc. complete as per drawings, specifications and directions of the Engineer-in-charge | 375 | CUM | 100 | ₹37,500 |
| 7 | Grass Turfing :Providing, laying and rendering protective treatment by turfing on sloped surface of dyke with selected grass sods of dense permanent well rooted growth, obtained from selected areas as directed including loosening the soil, watering for 30 days or till the grass are deep rooted into the original soil whichever is later, all as per drawings and directions of the Engineer-in-charge, all materials, tools and labour complete | 50,000 | SQM | 100 | ₹50,00,000 |
| 8 | Neat Cement Punning :Providing neat cement punning over cement plasters works in cross drains including curing, as per specification, drawings and direction of engineer-in-charge all materials, tools, and labour complete | 1,300 | SQM | 100 | ₹1,30,000 |
| 9 | Dismatling boulder pitching, transportin :Dismantling dry stone pitching from existing stack over pond II including stacking of serviceable material upto a lead of 1.00 km and disposal of
unserviceable material.as per the direction of engineer-in-charge all materials, tools, and labour complete.Payment shall be made after deducting 20% for voids | 5,000 | CUM | 100 | ₹5,00,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.10 MB
Document
3.05 MB
Document
0.81 MB
Document
2.11 MB
Document
0.90 MB
Document
1.18 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.81 MB
Tendernotice_5.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 3.05 MB
Tendernotice_4.pdf
PDF • 2.11 MB
Tendernotice_6.pdf
PDF • 1.18 MB
BOQ
BOQ • 0.26 MB
BOQ_933685.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].