Loading…
Loading…
Tender Value
₹2.1 Cr
EMD Value
₹4.1 L
Closing Date
5 Sept 2026, 4:00 pm
Xen RnB Division Kargil
Xen RnB Division Kargil
Construction of Seed Testing Laboratory at SM Farm Kurbathang under Centrally Sponsored Scheme (CSS) component of RKVY
2026_PWD_19395_1
E tender 30 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
360 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Xen RnB Division Kargil
₹4.1 L
19 Aug 2026
19 Aug 2026
7 Sept 2026
19 Aug 2026
5 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: as directed by Engineer-in-charge | |||||
| 1.01 | ORDINARY ROCK @30% | 265.89 | cum | 0.9 | ₹239.3 |
| 1.02 | ALL KIND OF SOIL @70% | 620.41 | cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc in layer not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50cm and lead up to 50 m and lift upto 1.5 mtr. | 354.52 | cum | - | - |
| 3 | Disposal of excavated earth as directed, within a
lead of 4 km : as directed by Engineer-in-charge | 531.78 | cum | 0.9 | ₹478.6 |
| 4 | STONE SOLLING Dumping of stone including
cost of stone (in horizontal on level) | 63.85 | cum | 0.9 | ₹57.47 |
| 5 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20
mm nominal size) (crushed) | 63.85 | cum | 0.9 | ₹57.47 |
| 6 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20
mm nominal size) (crushed) | 175.23 | cum | 0.9 | ₹157.71 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone
aggregate 20 mm nominal size) | 65.09 | cum | - | - |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone
aggregate 20 mm nominal size) | 22.29 | cum | 0.9 | ₹20.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_46028.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].