Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.8 LAccepted-Finance | ₹33.8 L | 1 | Accepted-Finance accepted in financial bid as L1 bidder |
| 2 | 2₹35.9 L+₹2.0 L (6.06%)Accepted-Finance HARSH INFRASTRUCTURE NEAR DWARKADISH PETROLEUM NANDANA DEVBHOOMI DWARKA JAMNAGAR GUJARAT 361315 | DEVBHUMI DWARKA | GUJARAT | 361315 | ₹35.9 L+₹2.0 L (6.06%) | 2 | Accepted-Finance accepted in financial bid as L2 bidder |
| 3 | 3₹37.4 L+₹3.5 L (10.4%)Accepted-Finance 1103 ARUNAACHAL BUILDING 19 BARAKHAMBA ROAD NEW DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹37.4 L+₹3.5 L (10.4%) | 3 | Accepted-Finance accepted in financial bid as L3 bidder |
| 4 | 4₹38.3 L+₹4.5 L (13.2%)Accepted-Finance 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | ₹38.3 L+₹4.5 L (13.2%) | 4 | Accepted-Finance accepted in financial bid as L4 bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical experience not as per tender criteria |
| Sl No | Description | Qty | Unit | sovereign enterprise L3 | Maruti Abhiyantriki L1 | Harsh Infrastructure L2 | P A SALES CORPORATION L4 |
|---|---|---|---|---|---|---|---|
| 1.01 | Desilting/ Removal of sludge and silt consisting of slushy earth, algae, boulders and other foreign material by necessary excavation , disposting off the sludge by lifting from bottoms to top of tank throught help of pulleys or any mechanical device up to a height of 8 meter and throwing the same away from the monument by wat of trator trolley etc complete. | 395 | cum | 2,100 ₹8,29,500 | 2,000 ₹7,90,000 Lowest | 2,800 ₹11,06,000 | 2,275 ₹8,98,625 |
| 1.02 | Provision for taking out of dumped heavy architectural / ornamental Stone members around of main Structures by sorting out the serviceable material & shifting them properly at suitable place for reuse during the conservation of structures & disposal the unserviceable material lead approximate 100 mtr away of working site etc complete. | 41.31 | cum | 1,890 ₹78,075.9 | 1,800 ₹74,358 | 850 ₹35,113.5 Lowest | 2,200 ₹90,882 |
| 1.03 | Taking out / removal of existing bulged / out of plumb R.R. stone Massonarry wall sorting out the serviceable material & stacking the proper place for reuse & disposal the unserviceable material by head load up to lead 200 mtr. etc complete | 14.59 | cum | 600 ₹8,754 | 350 ₹5,106.5 Lowest | 800 ₹11,672 | 650 ₹9,483.5 |
| 1.04 | Earth work excavation manually for base of pathway / flooring in all sorts of soil including throwing away the excavated earth outside of monument premises including all labors, T & P etc. all complete as per direction of site in-charge. | 39.52 | cum | 350 ₹13,832 | 200 ₹7,904 Lowest | 2,500 ₹98,800 | 350 ₹13,832 |
| 1.05 | Laying the Brick Jelly Lime Concrete in 1:2:4 (1 Lime: 2 Sand:4 Brick aggregate) below the flooring / pathway including ramming, consolidating and leveling etc. complete including compacting, curing, finishing, T & P, materials, labors etc. all complete. | 44.83 | cum | 10,000 ₹4,48,300 | 6,500 ₹2,91,395 Lowest | 10,000 ₹4,48,300 | 10,250 ₹4,59,507.5 |
| 1.06 | Provision for construction of a dwarf wall of rubble masonry in Lime mortar 1:1:1 ( Lime :1B.Surkhi: 1 C.Sand) of 1.0 m total height, comprising 0.60 m foundation below ground level and 1.00 m height above ground level, for protection of water bodies etc complete,as per direction of site in charge. | 79.55 | cum | 7,200 ₹5,72,760 | 7,000 ₹5,56,850 Lowest | 10,000 ₹7,95,500 | 7,650 ₹6,08,557.5 |
| 1.07 | Providing & laying 12cm thick sand stone flooring smooth and plain dressed set in L.S.S.(1:1:1) (1 part lime, 1 part sand, 1 part surkhi) mortar mixed with additives like gur, gugal, methi etc. including pointing, curing, all materials, labors, T & P etc. all complete as per direction of site in-charge. | 37.64 | cum | 34,500 ₹12,98,580 | 32,000 ₹12,04,480 | 500 ₹18,820 Lowest | 32,500 ₹12,23,300 |
| 1.08 | Recess pointing the R.R. Stone masonry wall in lime surkhi mortar 1:1:1 (1 lime : 1 surkhi : 1 C. Sand) with coloring pigment for matching with the original texture including raking cleaning and washing at the joints out etc. complete. | 203.5 | M2 | 450 ₹91,575 | 350 ₹71,225 Lowest | 500 ₹1,01,750 | 450 ₹91,575 |
| 1.09 | Providing & fixing the M.S Gate with Angle iron 50x50x6mm shutter & 16 mm squire bar 10 cm c/c distance & fixing them in .Rolled Steel Channels ( 125 x 50) mm size as per drawing & design including Painting two or more coat with syntactic enamel paint over red Oxide primer & fixing the lime cement mortor & transformation Charges with loading / unloading etc Complete | 6.8 | M2 | 5,200 ₹35,360 | 5,500 ₹37,400 | 13,000 ₹88,400 | 4,800 ₹32,640 Lowest |
| 1.10 | Provision for clearance of the debris/ malba/ Small size R.R.Stone /earth by sorting out the serviceable stone & others and disposal the unserviceable material lead approximate 100 mtr away of working site etc complete | 93.11 | cum | 1,150 ₹1,07,076.5 | 950 ₹88,454.5 Lowest | 1,500 ₹1,39,665 | 1,100 ₹1,02,421 |
Tender Value
₹41.9 L
EMD Value
₹1.0 L
Closing Date
27 Dec 2025, 6:00 pmClosed
SA, ASI, Rajkot
Office of the Superintending Archaeologist, Old Collector Compound, Rajkot 360001
DESILTING and RESTORATION OF OLD WELL BAWARI AT KANKESHWAR MAHADEV TEMPLE VASAI, DIST DEVBHOOMI DWARKA
2025_ASI_889538_2
3C/1(12A)/RJT/2025-26/CON
Open Tender
Civil Works
Works
120 days
KANKESHWAR MAHADEV TEMPLE VASAI
as per tender document
2 documents required · 2 mandatory
₹0
₹1.0 L
Yes
Office of the Superintending Archaeologist, Rajkot
29 Jan 2026
15 Dec 2025
29 Dec 2025
15 Dec 2025
27 Dec 2025
15 Dec 2025
15 Dec 2025 - 27 Dec 2025
19 Dec 2025
Desilting/ Removal of sludge and silt consisting of slushy earth, algae, boulders and other foreign material by necessary excavation , disposting off the sludge by lifting from bottoms to top of tank throught help of pulleys or any mechanical device up to a height of 8 meter and throwing the same away from the monument by wat of trator trolley etc complete.
Provision for taking out of dumped heavy architectural / ornamental Stone members around of main Structures by sorting out the serviceable material & shifting them properly at suitable place for reuse during the conservation of structures & disposal the unserviceable material lead approximate 100 mtr away of working site etc complete.
Taking out / removal of existing bulged / out of plumb R.R. stone Massonarry wall sorting out the serviceable material & stacking the proper place for reuse & disposal the unserviceable material by head load up to lead 200 mtr. etc complete
Earth work excavation manually for base of pathway / flooring in all sorts of soil including throwing away the excavated earth outside of monument premises including all labors, T & P etc. all complete as per direction of site in-charge.
Laying the Brick Jelly Lime Concrete in 1:2:4 (1 Lime: 2 Sand:4 Brick aggregate) below the flooring / pathway including ramming, consolidating and leveling etc. complete including compacting, curing, finishing, T & P, materials, labors etc. all complete.
Provision for construction of a dwarf wall of rubble masonry in Lime mortar 1:1:1 ( Lime :1B.Surkhi: 1 C.Sand) of 1.0 m total height, comprising 0.60 m foundation below ground level and 1.00 m height above ground level, for protection of water bodies etc complete,as per direction of site in charge.
Providing & laying 12cm thick sand stone flooring smooth and plain dressed set in L.S.S.(1:1:1) (1 part lime, 1 part sand, 1 part surkhi) mortar mixed with additives like gur, gugal, methi etc. including pointing, curing, all materials, labors, T & P etc. all complete as per direction of site in-charge.
Recess pointing the R.R. Stone masonry wall in lime surkhi mortar 1:1:1 (1 lime : 1 surkhi : 1 C. Sand) with coloring pigment for matching with the original texture including raking cleaning and washing at the joints out etc. complete.
Providing & fixing the M.S Gate with Angle iron 50x50x6mm shutter & 16 mm squire bar 10 cm c/c distance & fixing them in .Rolled Steel Channels ( 125 x 50) mm size as per drawing & design including Painting two or more coat with syntactic enamel paint over red Oxide primer & fixing the lime cement mortor & transformation Charges with loading / unloading etc Complete
Provision for clearance of the debris/ malba/ Small size R.R.Stone /earth by sorting out the serviceable stone & others and disposal the unserviceable material lead approximate 100 mtr away of working site etc complete
Provision For a Minor Repairing of the MS.Railing (fencing) i.e M.S Mesh,Iron patti,Ms angle, * Repainting the M.S Railing synthetic enemal paint Two or more coat of approved brand / shade with scraping by brush & sand paper for preparing the surface smooth etc complete
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish lead up to 50 mtr. And lift up to 1.50 mtr etc complete in all respect
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.61 MB
nitfinalsignedscanned.pdf
Tender Documents • 21.52 MB
BOQ_935275.xls
BOQ • 0.27 MB
Dwg.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .