Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 CrAccepted-AOC | ₹2.0 Cr | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical PreQualified but not Technically Qualified |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
23 Sept 2024, 11:00 amClosed
CMD TNUIFSL
Tamil Nadu Urban Infrastructure Financial Services Limited TNUIFSL No 19 T P Scheme Road Raja Annamalaipuram Chennai 600 028
Rehabilitation and Modification works to the existing 270MLD Kilpauk Water Treatment Plant including preparation of Detailed Project Report (DPR), Process Designs, Detailed Estimates and bid documents for CMWSSB
2024_TUIFS_472391_1
DIPR/2910/TENDER/2024
Open Tender
Consultancy
Lump-sum
CHENNAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.8 L
Yes
CHENNAI
31 Dec 2024
13 Aug 2024
24 Sept 2024
13 Aug 2024
23 Sept 2024
22 Aug 2024
21 Aug 2024
Amount
Cost of the Financial Proposal
(1) Remuneration
(2) Reimbursables
GST aginst Remuneration
GST aginst Reimbursables
Description of Work / Item(s)
Amount
Key Experts ( The total person months ( Home and Field) of the respective key experts shall not be less the minimum requireiments as specified in the TOR)
K- 1. Team Leader cum Process Engineer
K-2. Water Supply Expert
K- 3. Electro-Mechanical Expert
K-4. Conservation Architect
K- 5. SCADA Expert
K- 6. Environmental Safeguard Specialist
K- 7. Social cum Resettlement Safeguard Specialist
Non Key Experts ( The total person months ( Home and Field) of the respective key experts shall not be less the minimum requireiments as specified in the TOR
Description of Work / Item(s)
Amount
Reimbursables
Office Administrative/ Support and Clerical staff for 9 months
Cost of maintenance of office premises including Electricity, Water, Safety etc. for 9 months
Cost of monthly rental of 1 vehicle for 9 months (ie 9 Vehicle months) including fuel, Maintenance & Insurance, Driver cost and misc
Insurance & Others
Topo Survey by Total Station in Acre
Geotechnical investigation upto the min depth of 10m below GL in Nos
Soil Investigation (Trial pits / Boreholes)
Environmental base line survey - LS
Stakeholders meeting expenses
Cost of reports production (including printing) and delivering to the client
Cost …......................... (as per the ToR)
Cost of ….................................
Other allowances (if any) please specify
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .