| 1 | Accepted-Technical | Accepted-Technical Eligible bidder |
| 2 | Rejected-Technical PANCHAYATI RAJ ROHTAK | Rejected-Technical Does not fulfills the eligibility criteria being three class below the eligible class. Additionally the bidder is rejected due to following reasons as per the documents uploaded |
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
27 Aug 2026, 6:00 pmClosed
CWE ARMY JODHPUR
CWE ARMY MULTAN LINE ARMY AREA JODHPUR-342010
CONSTRUCTION OF BUILDING FOR ECHS POLYCLINIC TYPE D AT SHERGARH (NON MILITARY STATION) UNDER GE (ARMY) NO. 02 JODHPUR
2026_MES_754307_2
CWE (A) JODH/GE (A) NO. 02- OF 2025-26(82526/26/E8)
Open Tender
Civil Works
Lump-sum
360 days
SHERGARH
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
GE (ARMY) NO. 02 JODHPUR
₹2.1 L
Yes
11 Sept 2026
6 Aug 2026
29 Aug 2026
6 Aug 2026
27 Aug 2026
13 Aug 2026
6 Aug 2026 - 12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 21 | 1 | LUMP SUM | 52,11,000 | ₹52,11,000 |
| 2 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTH WORK" as listed in Schedule ‘A’ Part-II representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 22 | 1 | LUMP SUM | 3,19,306.51 | ₹3,19,306.51 |
| 3 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-III representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 23 | 1 | LUMP SUM | 15,558.72 | ₹15,558.72 |
| 4 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATIONS" as listed in Schedule ‘A’ Part-IV representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 26 | 1 | LUMP SUM | 3,37,036.02 | ₹3,37,036.02 |
| 5 | Lump sum price worked out by the contractor for " PARKING SHED & HARD STANDING" as listed in Schedule ‘A’ Part-V representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from Sl page No. 27 | 1 | LUMP SUM | 5,41,810.03 | ₹5,41,810.03 |
| 6 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-VI representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 29 | 1 | LUMP SUM | 51,712.23 | ₹51,712.23 |
| 7 | Lump sum price worked out by the contractor for " AREA DRAINAGE" as listed in Schedule ‘A’ Part-VII representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 30 | 1 | LUMP SUM | 1,45,464.63 | ₹1,45,464.63 |
| 8 | Lump sum price worked out by the contractor for " BOUNDARY WALL & STEEL GATE" as listed in Schedule ‘A’ Part-VIII representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from Sl page No. 32 | 1 | LUMP SUM | 16,09,575.99 | ₹16,09,575.99 |
| 9 | Lump sum price worked out by the contractor for "External Water Supply" as listed in Schedule ‘A’ Part-IX representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 33 | 1 | LUMP SUM | 1,02,168.52 | ₹1,02,168.52 |
| 10 | Lump sum price worked out by the contractor for " EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-X representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 34 | 1 | LUMP SUM | 94,192.8 | ₹94,192.8 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_877282.xls
BOQ • 0.33 MB
TENDER26merged_compressed.pdf
Tender Documents • 31.99 MB
TENDER-DRAWINGS-82526-26-E8.pdf
Tender Documents • 7.66 MB
TD-DRAWING-82526-26-E8.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .