| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Lower bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | BAIJU ISSAC L2 | JOJISH JOSE L3 | VINOD KUMAR V C L1 |
|---|---|---|---|---|---|---|
| 1.00Retarring | ||||||
| 1.00 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means | 0.02 | Hectare | 47,090 ₹894.71 | 15,000 ₹285 | 10,000 ₹190 |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 11.88 | sqm | 323 ₹3,837.24 | 300 ₹3,564 | 295 ₹3,504.60 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 69.05 | sqm | 418 ₹28,862.90 | 400 ₹27,620 | 395 ₹27,274.75 |
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 360 | sqm | 16 ₹5,760 | 10 ₹3,600 | 8 ₹2,880 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 35.55 | cum | 3,650 ₹1.3 L | 3,800 ₹1.4 L | 3,600 ₹1.3 L |
| 1.01 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 474 | sqm | 80 ₹37,920 | 80 ₹37,920 | 78 ₹36,972 |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 474 | sqm | 18 ₹8,532 | 20 ₹9,480 | 18 ₹8,532 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 456 | sqm | 15 ₹6,840 | 15 ₹6,840 | 14 ₹6,384 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 930 | sqm | 290 ₹2.7 L | 300 ₹2.8 L | 297 ₹2.8 L |
Tender Value
₹5.1 L
EMD Value
₹12,711
Closing Date
10 Oct 2025, 4:00 pmClosed
Assistant Engineer
ASSISTANT ENGINEER THIRUMARADY GP
130/26 Kunnumpuram-Chirappuram-Puthenchira road -Thirumarady GP
2025_LSGD_802791_1
ET2/AE/LSGD/TMDY/130/25-26
Open Tender
Civil Works - Roads
Thirumarady
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,125
₹12,711
12 Jun 2026
27 Sept 2025
13 Oct 2025
27 Sept 2025
10 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid