Tender Value
₹16.8 L
EMD Value
₹17,000
Closing Date
24 Nov 2023, 3:00 pmClosed
BDO (BP)
Panchayat Union Mannachanallur
MLACDS 2023-24- Mannachanallur Panchayat Union Construction fof 30000 litres rcc oht with 12.00 m staging height 30 mix at valaiyur AD street in valaiyur panchayat
2023_RDTN_390475_1
A3/2782/2023
Open Tender
Civil Works - Water Works
Item Rate
Panchayat Union, Mannachanallur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,000
Yes
Panchayat Union, Mannachanallur
30 Nov 2023
18 Nov 2023
24 Nov 2023
18 Nov 2023
24 Nov 2023
18 Nov 2023
18 Nov 2023
Amount
Construction fof 30000 litres rcc oht with 12.00 m staging height 30 mix at valaiyur AD street in valaiyur panchayat Earthwork excavation and depositing on bank with an initial lead of 10m and lift
Earthwork excavation and depositing on bank with an initial lead of 10m and lift
Cement concrete 1 4 8 one cement four sand and eight aggregates using 40mm HBGS for levelling course for foundation including
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
Supplying fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Earthwork excavation and depositing on bank with an initial lead
Cement concrete 1 4 8 one cement four sand and eight aggregates using 40mm HBGS for levelling course for foundation including
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
Supplying fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Refilling the foundation with excavated earth including watering and consolidation etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
Supplying fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets
Supplying fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
Supplying fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
Centering Rate
Supplying fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets
Supplying fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement centering shuttering strutting but including cost of mixing concrete,
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm
Providing manhole cover
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 complete.
Fabrication supply delivery and fixing of outside MS Ladder of . Supply delivery and fixing MS Ladder providing locking arrangements
Providing cut stone slab
Exterior Emulsion Paint two coats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface
65mm dia GI pipes for inlet connection
65mm dia GI pipes for over flow and RWH
65mm dia GI pipes for delivery pipe.
50mm dia GI pipes for scour pipe.
90mm dia PVC Threaded coupler
63mm dia PVC Threaded coupler
65mm dia GI Tee
65mm dia 90 Deg Bend
65mm dia GI Bend
65mm dia GI Coupler
65mm dia GI Union
65mm dia GI Elbow
50mm dia GI Union
50mm dia GI Elbow
65mm dia GI Tee
65 50mm dia GI Reducer
75 63mm dia PVC Reducer
75 90 mm dia PVC Reducer
65mm dia GM Gate Valve
50mm dia GM Gate Valve
75mm PVC Threaded coupler
63 mm PVC Pipe 4ksc
63 mm PVC Bend
63 mm PVC End Cap
Adhsive Solution
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works.
Pipe testing charges
Provision for Chlorinator
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T NAGARAJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .