Loading…
Loading…
Tender ID
Tender Value
₹88.3 L
EMD Value
₹89,000
Closing Date
29 Jan 2026, 6:10 pmClosed
EXECUTIVE ENGINEER’S OFFICE, PANCHAYAT (R&B) DIVISION, RAJPIPLA
Constructing Various Structure in Sagbara Taluka under Mukhya Mantari Boarder Village Sarvangi Utkarsh Yojna-GRANT-2025-26 In Narmada District (3 Slab Drains)
264919
31 of 2025-26
Open
Civil Works - Bridges
Works
Narmada
5 documents required · 5 mandatory
₹2,400
Yes
Executive Engineer, Panchayat (R&B) Division, Rajpipla
₹89,000
Yes
14 Jan 2026
14 Jan 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
Name of Work :-
Constructing Various Structure in Sagbara Taluka Under Mukhya Mantari Boarder
Village Sarvangi Utkarsh Yojana Grant 2025 -26 in District :- Narmada ( 3 Works. )
[1] Const. Slab Drain on Raysingpur Nandarbar Road 1.00 No.
[2] Const. Slab Drain on Jawli High Scchool to Upla Faliya 1.00 No.
[3] Const. Slab Drain on Khadkuni Approach Road. 1.00 No.
Total 3.00 Nos.
BILL O F Q U A N T I T I E S.
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up to Two Decimal )
to 50 Decimals)
1 422.00 Excavation for foundation in sand, 523.28 Rupees Five Cum
gravel, clay soft soils and murrum Hundred
etc. including shoring, strutting Twenty
dewatering as necessary and Three And
disposing of the excavated stuff as
directed.(A) Depth upto 3.0 M. and
lead upto 100m for 10 Cum
2 293.00 Excavation for foundation in hard 625.88 Rupees Six Cum
murrum and boulders and very stiff Hundred
or sticky, clays and other similar Twenty Five
strata including shoring and strutting And Eighty
and dewatering as necessary and
disposing of the excavated stuff as
3 83.00 Providing & filling in found-ation with 3581.32 Rupees Cum
ordinary cement concrete M-150 mix Three
and providing necessary vertical pin
headers including formwork, Eighty one
vibrating, ramming and curing And Thirty
complete. Two Paise
4 806.00 Providing and casting in situ 4263.10 Rupees Cum
ordinary cement concrete M.- Four
250 mix and Providing Thousand
necessary pinheaders incl. Two
Shuttering scaffolding laying
vibrating curingand finishing
complete. without v -Grooves (A) Ht Paise Only
from 0.0 M to 5.0 M.
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up to Two Decimal )
to 50 Decimals)
5 21.00 Providing and casting in situ 4770.14 Rupees Cum
ordinary cement concrete M.- Four
200 mix and Providing Thousand
necessary pinheaders incl. Seven
Shuttering scaffolding laying
vibrating curingand finishing
complete. without v -Grooves (A) Ht Fourteen
from 5.0 M to 10.0 M. Paise Only
6 343.00 Providing and Filling Sand around 478.82 Rupees Cum
the Pipe and Between Head Walls in Four
layers as directed Hundred
7 193.00 Providing and Laying filter media 1268.86 Rupees one Cum
600 mm thick as directed at the Thousand
back of Abutments and wing walls Two
as per detailed Specifica-tion Hundred
8 41.00 Providing and Casting in situ 5176.77 Rupees Five Cum
Controlled cement concrete M - 250 Thousand
mix for R.C.C. Works in Pier Cap one
abutment & dirt wall inclu.
controlled cement concrete M-300
bed block or pedastal of required Seven
size below bearing asper detailed Paise Only
drawing,centering scaf-folding whe
rever necesary laying vibrating
curing &finishing comp.
9 24.00 Providing&fixing in position Mild 341.29 Rupees No
Steel Dowel Bar in pier Cap or Three
Abutments Caps for anchorage in fix Hundred
end asper detailed drawing incl. Fourty one
Cutting, bending and welding.
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up to Two Decimal )
to 50 Decimals)
10 24.00 Providing & fixing in position Mild 399.70 Rupees No
Steel Dowel Bar in pier Cap or Three
Abutments Caps for anchorage in Hundred
free end as per detailed drawing ninety Nine
incl. Cutting, bending and welding.
11 127.00 Providing and Casting in situ 5243.88 Rupees Five Cum
Controlled Cement Concrete M. - Thousand
250 for R.C.C. Solid slab inclu. Two
centering scaffolding curing and
12 21.20 Providing & casting in situ Controlled 5171.04 Rupees Five Cum
Cement Conc-rete M- 250 for Thousand
average 75 mm thick wearing coat one
laid as directed incl.finishing curing Hundred
etc. complete and filling in joints
with bitumen comp.
13 35.00 Providing & filling in found-ation with 3211.27 Rupees Cum
ordinary cement concrete M-100 mix Three
and providing necessary vertical pin Thousand
headers including formwork, Two
vibrating, ramming and curing
14 103.00 Providing and casting in situ 5029.20 Rupees Five Cum
Controlled cement concrete M - 250 Thousand
for Approach Slab including Form Twenty Nine
Work curing and Finishing And Twenty
15 256.00 Providing and Laying weep holes in 88.76 Rupees No
Abbutment and Returns by using Eighty Eight
A.C.Pipe of 100 mm dia. incl. Laying And Seventy
in proper grade and joining etc. Six Paise
comp.as per detailed Specification.
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up to Two Decimal )
to 50 Decimals)
16 26.090 Providing & Laying TMT Bar FE- 73433.46 Rupees M.T.
500D Reinforcement including Seventy
Cutting bending hooking and tying Three
complete as per detailed drawing for Thousand
Piers, Abutments and Returns.,
R.C.C. Solid Slab, Approach Slab &
R.C.C. Road. Etc. Complete. And Fourty
17 6.00 Providing and fixing Marble Slab 840.49 Rupees No
including Engraving & Paint ing Eight
complete. Size 60 cm x 45 cm x 40 Hundred
18 73.00 Providing 12 mm thick pre-moulded 703.53 Rupees Sqmt
asphalt filler Joints as per Drawing. Seven
19 36.00 Provding P.V. C. 100mm diameter 904.61 Rupees No
water spouts inclu. necessary iron Nine
gratings as per drawings. Hundred
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up to Two Decimal )
to 50 Decimals)
20 2.00 Providing and fixing sign board made 3808.66 Rupees No
out of 2 mm aluminium sheet size 90 x Three
90 cms. equilateral traiangle as per Thousand
design of I.R.C. 67-1977 preferred Eight
with phosphering proess and acid Hundred
etching , coated with one coat of Eight And
epoxy primer and two coats of best Sixty Six
quality epoxy paint, reflectorised with Paise Only
retro reflective sheeting as per latest
M.O.S.T. Specifi-cation :3:1 m. long.
Stand Post and frame fabricated from
suitable size iron and angle of 35 x
x 3 mm , 75 x 75 x6 mms required
painted with best quality epoxy
coatings in black and white bend. the
details of symbol for each board shall
be as per the instruction of engineer in
charge. The fixing at site shall be in
C.C.1:2:4 c.c. Block of size 45 x45 x
60 cms. for each leg. incl. excavation,
curing etc. complete under the
supervision of engineer in charge.(A}
Engineer Grade.
21 137.30 Dismentaling the existing struc-ture 952.51 Rupees Nine Cum
including removing &stacking the Hundred Fifty
dismentelled materials as and where one Paise
directed. (A) R.C.C. work Only
22 156.00 Dismentaling the existing struc-ture 418.97 Rupees Cum
including removing &stacking the Four
dismentelled materials as and where Hundred
directed. (A) Rubble Masonary Eighteen
23 80.00 Providing Temporary all weather 1025.15 Rupees one Cum
and fair weather diversion suitable Thousand
for traffic during the construction Twenty Five
period of the work incl. providing And Fifteen
necessary drains and allsafety
measure including red lamps /
signals at night for traffic etc
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up to Two Decimal )
to 50 Decimals)
24 132.00 Earthwork in embankment inclu. 184.85 Rupees one Cum
breaking clods drssing with all lead Hundred
& lift including Rolling and Watering Eighty Four
of Earth Work in layers with power And Eighty
roller including filling in depression
which occur during the process etc.
complete from Borrow area with in
1.00 K. M. Lead..
25 70.00 Construction of granular sub-base by 1428.99 Rupees one Cum
providing well graded material for Thousand
grade-I (B.T. stone agg. 53mm to 9.50 Four
mm 50%, 9.50mm to 2.36mm 20%, Hundred
2.36 below 36%)including spreading in Twenty
uniform layers with motor grader on Eight And
prepared surface, mixing by mix in ninety Nine
place method with rotavator at OMC, Paise Only
and compacting with smooth wheel
roller to achieve the desired density,
complete as per Technical Specifi-
cation Clause 401. For Grading
26 46.00 Providing &laying compacted WBM 1868.28 Rupees Cum
of Grading-II MCBT metal of size 45 one
to 63mm in required layers Thousand
include.using 16% stone Eight
screening,13.2 mm size and 8% Hundred
stone dust as filler including Sixty Eight
spreading watering & consolidation And
by vibratory roller etc. comp. Twenty
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up toTwo Decimal )
to 50 Decimals)
27 330.00 Providing trimix machine for leveling 60.60 Rupees Sqmt
smooth, finishing including channel Sixty And
fixing electric supply etc and Sixty Paise
dewatering of excess water through Only
vacume pump including transporting
form machine etc complete as
Total Amount Rs.
Total Amount Rs.
Rupees Eighty Eight lacs Twenty Six Thousand Five hundred Fifty & Twenty Nine Paise only.
Divisional Accountant Deputy Executive Engineer
Panchayat ( R & B ) Division Panchayat ( R & B ) Sub Division
Rajpipla. Dediapada
I / We am / Are Willing To Carry out the Work @ ----------- % above / Below than the Estimated Rates
mentioned above.
The Cost of My / Our Tender Works out as Under
Amountt Put To Tender Rs. 88,26,550.29 Amountt Put To Tender Rs.
Total Amount Rs. _______________________, Net Amount Rs. _______________ __,
Total Amount Rs. _______________________, Net Amount Rs. _______________ __,
( in Figures Rupees ______________________ ( in Figures Rupees ______________
1 All the work shall be carried out as per P.W.D.H.B. Vol. I & II (revised and other specifications of
non schedule items carried out as derected.
2 All the columns in schedule should be filled in ink and the entries in the last column should be
struck by the contractor under his signature.
3 All the rates quoted includes clearance of site ( Prior to commencement of work and its clause) in
all respects and hold good for work under all condition, site, moisture, weather etc.
It. Quantitie Items of Work Tender Rate UNIT Amount up to (
No. s ( only In Figure In Words. (Up to Two Decimal )
to 50 Decimals)
4 The contractor shall exhibit a board as per Govt. circular No. B.D. 3277/1557/C. Dt. 26/04/78
(M.Gujarat) with detailed specifications and details of the work and cement involved at the site,
with out any payment as directed by the engineer in charge.
5 Contractor shall state even “ NIL” percentage if no reduction is offered.
6 No. advance payment on materials shall be made.
Sign of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat ( R & B ) Sub Division Panchayat ( R & B ) Division
Dediapada. Rajpipla.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0.Requirement of Tendar Documents.pdf
1.Standard Bidding Document.pdf
2.SCH-B.pdf
3.B.O.Q Notes.pdf
4.Specification.pdf
5.New G.R._11zon.pdf
6.Specification IT. 16.pdf
7.Drawing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .