Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹7.2 L
Closing Date
22 Mar 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
POWERGRID
RHQ KOLKATA
Retrofitting of UE make duplex type protection panels with De-centralized SAS based Protection panel at Birpara Sub-station, ERTS - II, POWERGRID under ADDCAP (19-24)
ER-II/KOL/CS/I-2960/RFX-5002002160
Open
Electrical Works
Works
Birpara
₹12,500
₹7.2 L
18 Feb 2022
18 Feb 2022
22 Mar 2022
18 Feb 2022
21 Mar 2022
18 Feb 2022
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV Line bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV Transformer bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV TBC bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV BC bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 33kV tertiary bay & Auxiliary System
Interfacing of system under present scope with the existing SAS and upgradataion of hardware and software, augmentation of exiting SAS
33 KV Protection panel for Transformer (with automation)
220kV Circuit Breaker Relay Panel with auto reclose (with automation)
220kV Circuit Breaker Relay Panel without auto reclose (with automation)
220kV line protection panel (with automation)
220kV transformer protection panel (for both HV & MV side)-(with automation)
Low Impedance type distributed Bus bar protection for complete 220 KV Switchyard, single busbar protection with automation
Time synchronisation Equipment
Split AC, (2 Ton capacity) for newly built SPR.
Supply of Co-axial cable due to shifting of panels
Lighting system for SPR Room
Fire Detection and Alaram System for SPR
BB) F&I CHARGES FOR ELECTRICAL PART:
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV Line bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV Transformer bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV TBC bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 220kV BC bays
Complete Substation Automation System for the following bays as per Technical Specification and Scope of work: 33kV tertiary bay & Auxiliary System
Interfacing of system under present scope with the existing SAS and upgradataion of hardware and software, augmentation of exiting SAS
33 KV Protection panel for Transformer (with automation)
220kV Circuit Breaker Relay Panel with auto reclose (with automation)
220kV Circuit Breaker Relay Panel without auto reclose (with automation)
220kV line protection panel (with automation)
220kV transformer protection panel (for both HV & MV side)-(with automation)
Low Impedance type distributed Bus bar protection for complete 220 KV Switchyard, single busbar protection with automation
Time synchronisation Equipment
Split AC, (2 Ton capacity) for newly built SPR.
Supply of Co-axial cable due to shifting of panels
Lighting system for SPR Room
Fire Detection and Alaram System for SPR
Annexure - I
BOQ for Retrofitting of UE make duplex type protection panels with De-centralized SAS based Protection panel at Birpara Sub-station, ERTS - II, POWERGRID under ADDCAP (19-24)
Specification No: ER-II/KOL/CS/I-2960/RFX-5006002160
CC) ERECTION OF ELECTRICAL PART:
Laying & termination of 5C x 2.5 Sq mm Control Cable
Laying & termination of 7C x 2.5 Sq mm Control Cable
Laying & termination of 10C x 2.5 Sq mm Control Cable
Laying & termination of 14C x 2.5 Sq mm Control Cable
Laying & termination of 19C x 2.5 Sq mm Control Cable
Laying & termination of 27C x 2.5 Sq mm Control Cable
Dismantling of existing Centralised Bus Bar with panel and handing over to Birpara O&m Store with packing
Erection of Co-axial cable due to shifting of panels
Adaption of existing Fire Fighting system to upcoming SAS.
Sub-station Automation System for the following bays: 220kV Line bays
Sub-station Automation System for the following bays: 220kV Transformer bays
Sub-station Automation System for the following bays: 220kV TBC bays
Sub-station Automation System for the following bays: 220kV BC bays
Sub-station Automation System for the following bays: 33kV tertiary bay & Auxiliary System
Interfacing of system under present scope with the existing SAS and upgradataion of hardware and software, augmentation of exiting SAS including NTAMC integration
220kV Circuit Breaker Relay Panel with auto reclose (with automation)
220kV Circuit Breaker Relay Panel without auto reclose (with automation)
220kV line protection panel (with automation)
220kV transformer protection panel (for both HV & MV side)-(with automation)
Low Impedance type distributed Bus bar protection for complete 220 KV Switchyard, single busbar protection with automation
Time synchronisation Equipment
Split AC, (2 Ton capacity) for newly built SPR.
Lighting system for SPR Room
Fire Detection and Alaram System for SPR
Removal of old control cable (5 C X 2.5 sq mm)
Removal of old control cable (7 C X 2.5 sq mm)
Removal of old control cable (10 C X 2.5 sq mm)
Removal of old control cable (14 C X 2.5 sq mm)
Removal of old control cable (19 C X 2.5 sq mm)
Removal of old control cable (27 C X 2.5 sq mm)
Annexure - I
BOQ for Retrofitting of UE make duplex type protection panels with De-centralized SAS based Protection panel at Birpara Sub-station, ERTS - II, POWERGRID under ADDCAP (19-24)
Specification No: ER-II/KOL/CS/I-2960/RFX-5006002160
DD) CIVIL PART :
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge.All kinds of soil
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster :1:6 (1 cement: 6 coarse sand)
6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand)
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement : 6 fine sand).
Add for plaster drip course/ groove in plastered surface or moulding to R.C.C. projections.
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Suspended floors, roofs, landings, balconies and access platform
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two or more coats) over and including water thinnable priming coat with cement primer
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations:
(a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment.
(b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs.
(c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineerin- charge.
(d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineerin-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep.
(e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge :
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement,mixed with matching pigment, epoxy touch ups, including rubbing, curing,moulding and polishing to edges to give high gloss finish etc. complete at all levels.Granite of any colour and shade Area of slab upto 0.50 sqm
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth.
Stone mixed with sand under floors
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades,laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm
Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joint with white cement & matching pigments etc. complete.Size of Tile 600x600 mm
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :
For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately)Powder coated aluminium (minimum thickness of powder coating 50 micron)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Filling the gap in between aluminium frame & adjacent RCC/ Brick/Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete.Upto 5mm depth and 5 mm width
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 5 mm thickness (weight not less than 12.50 kg/ sqm)
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :450 mm dia. R.C.C. pipe
Providing and fixing Brass 100mm mortice latch and lock with 6 levers without pair of handles (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete.
Providing and fixing aluminium handles, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc. complete :125 mm
Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete :300x10 mm
Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :Two or more coats on new work
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion.Bend 87.5° 110 mm bend
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion.Shoe (Plain) 110 mm
Providing and fixing zinc alloyed (white powder coated) touch lock for uPVC sliding window with necessary screws etc. complete.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
CARRIAGE OF MATERIALS By Mechanical Transport including loading,unloading and stacking Earth lead upto 2km.
Removing, cleaning and washing of existing stones and respreading of stones in switchyard excluding PCC.
Removal of existing switchyard stones (Only the areas where SPR/Cable trench work to be executed)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level and upto floor v level .Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3graded stone aggregate 20 mm nominal size).
Providing and placing chicken wire mesh with nails all complete as per direction of Engineer-in-charge.
Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil.
Supplying chemical emulsion in sealed containers including delivery as pecified.Chlorpyriphos/ Lindane emulsifiable concentrate of 20%
Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete: With Chlorpyriphos/ Lindane E.C. 20% with 1%concentration
Neat cement punning.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
01 IFB VOL I.doc
doc • 0.36 MB
02 Section-II ITB SSTE SI Rev 5.pdf
pdf • 0.63 MB
03 BDS Vol I.doc
doc • 0.36 MB
03A Annexure-A(BDS).doc
doc • 0.30 MB
03B Annexure-B(BDS)- Revised.docx
docx • 0.08 MB
03C Annexure-C(BDS).docx
docx • 0.08 MB
03D Annexure-D(BDS)- Revised.docx
docx • 0.09 MB
04 Section-IV GCC SI Rev 3.pdf
pdf • 1.93 MB
05 SCC Vol I .doc
doc • 0.33 MB
05A-Appendix-3 Insurance (SCC).pdf
pdf • 3.50 MB
06 Forms and Procedures Vol I.doc
doc • 0.55 MB
~$ IFB VOL I.doc
doc • 0.00 MB
~$ BDS Vol I.doc
doc • 0.00 MB
~$ BDS Vol.I.doc
doc • 0.00 MB
~$ Forms and Procedures Vol I.doc
doc • 0.00 MB
~$SCC Vol.I .doc
doc • 0.00 MB
7A_FINAL_SCOPE_WORK_BIRPARA.pdf
pdf • 0.11 MB
7BA_DRAWING_Cable Trench.pdf
pdf • 3.68 MB
7BB_DRAWING_STANDARD Panel Room (6M).pdf
pdf • 0.60 MB
7BC_OVERALL LAY_OUT.pdf
pdf • 0.81 MB
7C Tech Spec - GTR Rev 15-compressed.pdf
pdf • 1.22 MB
7D Tech Spec -Specific Requirement_Rev 06 with Annexures-compressed.pdf
pdf • 0.83 MB
7E Tech Spec - Section-CRP Rev 09.pdf
pdf • 0.37 MB
7F Tech Spec - Section Structure Rev 6.pdf
pdf • 0.10 MB
7G Tech Spec - Section_Switchyard Erection_Rev_10-compressed.pdf
pdf • 3.89 MB
7H Tech Spec - Section-Sub-station Automation_Rev04.pdf
pdf • 0.98 MB
7I Tec Section-Sub-station Automation_STANDARD FACTORY SIMULATION TEST PLAN.pdf
pdf • 0.54 MB
7J Tech Spec - Section-Switchgear-ISO_Rev11B.pdf
pdf • 0.11 MB
7K Tech Spec - Power & Control Cable Rev R6.pdf
pdf • 0.26 MB
7L Tech Spec - Fire Protection Rev 6.pdf
pdf • 1.97 MB
7M Tech Spec - Air conditioning R4.pdf
pdf • 0.04 MB
7Q_CRP_SAS_FAT.pdf
pdf • 0.54 MB
Thumbs.db
db • 0.07 MB
8-Attachment and Bid Forms Vol.III..xls
xls • 2.38 MB
9 - BOQ Item Details.xlsx
xlsx • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .