Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
25 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager Subcontract
KEL Kochi
CONSTRUCTION OF PERUMTHINI SMASHANAM ROAD IN PARALI GRAMA PANCHAYATH PALAKKAD
2020_KEL_399588_1
KRO/ BDC/779/2020
Open Tender
Civil Works - Roads
Item Rate
150 days
KEL Kochi
As per NIT
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
30 Nov 2020
17 Nov 2020
27 Nov 2020
17 Nov 2020
25 Nov 2020
17 Nov 2020
17 Nov 2020 - 25 Nov 2020
120 days
Amount
EARTH WORK
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
51.2.3 : Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
CONCRETE ROAD
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS).
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. (Centering and shuttering for different category of work may be considered separately.)
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more. Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
19.36.1 : Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete.450 mm dia RCC pipes.
ROAD WORK
4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii)Using Gravel mix soil. Quantity by level calculation and statutary reporting to CTE as per norms.
Shifting 2 NO. of KSEB post.
Note: Rate should be inclusive of preparation of schematic diagram and getting approval from KSEB/Electrical Inspectorate. Statutory fees paid to KSEB/EI shall be paid by us separately.
LS for NAME BOARD including lettering etc as per LSGD norms and direction of engineer in charge.
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of installation, testing and commissioning cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD/Irrigation Dept. specification and direction of Engineer at site.
PALAKKAD Dist LABOUR CO OP SOCIETY Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .