| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.6 CrAccepted-AOC | 1 | Accepted-AOC Lowest Bider | |
| 2 | 2₹23.4 Cr+₹73.9 L (3.27%)Accepted-AOC | 2 | Accepted-AOC Second Lowest Bider | |
| 3 | Rejected-Technical | - | Rejected-Technical Bidder does not submitted required tender fee and RISL fee. Hence declared as Non Responsive |
Tender Value
₹24.9 Cr
EMD Value
₹49.8 L
Closing Date
3 Jul 2023, 6:00 pmClosed
CE WR ZONE KOTA
CE WR ZONE KOTA
Renovation and Restoration works of Remaining Canal System of Alnia Medium Irrigation Project Tehsil Ladpura District Kota
2023_WRDAS_345536_1
CE WR ZONE KOTA NITNO-07-2023-24
Open Tender
Civil Works
Percentage
730 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE CP DIV KOTA
₹49.8 L
Yes
CE WR ZONE KOTA
18 Sept 2023
22 Jun 2023
4 Jul 2023
23 Jun 2023
3 Jul 2023
23 Jun 2023
27 Jun 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. (a) Ordinary | 1,95,261.6 | Sqm | 1.45 | ₹2,83,129.32 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard/Dense soil mixed with kankar, boulders, morrum. | 50,218.25 | Cum | 115 | ₹57,75,098.75 |
| 3 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. With initial lead of 250 m. | 3,614.69 | Cum | 124 | ₹4,48,221.56 |
| 4 | Compaction of earth or highly weathered strata.By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. at least 95% of Standard Proctor's density | 3,614.69 | Cum | 38 | ₹1,37,358.22 |
| 5 | Watering of earth including cost of carriage of water when source of water is up to 1 km. | 3,614.69 | Cum | 11.1 | ₹40,123.06 |
| 6 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm soil, morrum mixed with pebbles, small boulders and kankar & morrum for Bed. | 67,358.93 | Sqm | 8.5 | ₹5,72,550.9 |
| 7 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm soil, morrum mixed with pebbles, small boulders and kankar & morrum for Slope. | 76,865.37 | Sqm | 11.2 | ₹8,60,892.14 |
| 8 | Providing and laying 75mm thick sand layer in bed (over clays sub grade) duly stabilized with cement slurry (1:20) including all leads and lift of material. | 61,058.93 | Sqm | 186 | ₹1,13,56,960.98 |
| 9 | Providing and laying 75mm thick sand layer on side slope (over clays sub grade) duly stabilized with cement slurry (1:10) including all leads and lift of material. | 76,865.37 | Sqm | 230 | ₹1,76,79,035.1 |
| 10 | Providing and laying cast in situ concrete sleepers 15 cm x 7.5 cm in bed in cement concrete (1:3:6) with maximum size of crusher broken stone aggregate upto 20 mm well graded including all leads of all construction materials including curing, finishing & form work etc. complete as per specification for: For Bed. | 12,211.79 | RM | 61 | ₹7,44,919.19 |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_614168.xls
BOQ Document • 0.28 MB
123666269.pdf
Tender Document • 2.25 MB
Technical-Bid-Alnia.pdf
Tender Document • 1.13 MB
Financial-Bid-Alnia.pdf
Tender Document • 3.62 MB
123666271.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .