Loading…
Loading…
Tender Value
₹12.1 Cr
EMD Value
₹3.8 L
Closing Date
1 Oct 2026, 4:00 pm4d left
Additional Chief Engineer (P&C)
Supply, Erection, Testing& Commissioning of 132KV 2x(3+0) 1Cx800sq.mm U/G cable laying 132KV LILO Chiloda from 132KV Ranasan Vijapur line.(From prop.AP 5/0(DD+3)cable termination tower to 132KV Chiloda SS(Ckt-1 &2-Route length-1.40Km) under KSY-II.
343090
ACE(P&C)/Contracts/E-510/TL/UG/132kV/S&L,E/TN-13
Open
Electrical Works
Works
Vadodara
31 documents required · 24 mandatory · 7 optional
₹11,800
Gujarat Energy Transmission Corporation Vadodara
₹3.8 L
8 Sept 2026
8 Sept 2026
8 Sept 2026
1 Oct 2026
8 Sept 2026
Estimated Cost of laying of two equal lengths of FOAC (Fiber Optic Approach Cable) ( DWSM - Dual window single mode, 48F) - with installation hardware like ties / clips /
cleats, conduits, HDPE ducts, supports, fittings, accessories etc with required arrangement to lay along side of U/G cable - (Annexure-B1 (Supply) & B2 (Erection))
Estimated Cost (Supply Part) (Annexure-B1)
Sr.No. Name of Line FOAC Single Length (DWSM Nos. of such sigle length Total length of FOAC (DWSM 48F)
48F) (meter) of FOAC required (meter)+ Length of Approach cable
1 132 kV LILO Chiloda from 132 kV Ranasan Vijapur line 1580 2
Estimated Cost (Erection Part) (Annexure-B2)
Sr.No. Name of Line FOAC Single Length (DWSM Nos. of such sigle length Total length of FOAC (DWSM 48F)
48F) (meter) of FOAC to be laid (meter)+ Length of Approach cable
1 132 kV LILO Chiloda from 132 kV Ranasan Vijapur line 1580 2
Note1: Only FOAC BOQ is prepared based on input. However for OPGW BOQ, Query is given vide mail Dtd: 02.05.2025. OPGW BOQ shall be conveyed after compliance to query mail.
Following points are important from work execution perspective, same may please be noted.
i) Fiber optic approach cable (FOAC) shall be laid with 132kV cable system strictly as per approved method of construction i.e MOC. Each run of FOAC shall be of continuous length, no in between
splicing is allowed.
ii) Two to Three rings of extra loop length shall be kept buried underground at foot of both end termination tower after laying FOAC cable with 132kV cable as per MOC.
iii) FOAC cable length remain outside and above the ground level shall be 2 times the height of each termination tower at both end. Each run of FOAC cable coming out after laying in underground
section should be brought up to third cross arm of termination tower after passing it through HDPE pipes and properly tying up with tower. Also, each run of FOAC cable shall be terminated in
individual joint box on each termination tower.
iv) Balance length of each FOAC cable (i.e. Approximately half of tower height) after bringing out the FOAC cable above from ground level and up to third cross arm of termination tower, it shall be
managed in rings properly with fixing clamp arrangement to hold up it on end termination tower.
v) As per standard GETCO format of "End to End test.pdf" , after laying FOAC cable, each length shall be tested for end to end test using power meter and OTDR. Original copy of Test report duly
sealed and signed with date, name & designation of testing person, executing contractor and witnessing officer one each from telecom as well as TR/Const. nominated from respective EE(Telecom)
and EE(TR)/EE(const.) respectively, shall be submitted to under signed & one copy to respective telecom unit, invariably without fail
vi) Only after getting clearance on validity of test report submitted to this office, filed officer will take further necessary action on commercial part.
vii) DRS (Data requirement sheet) and drawing approval shall be taken for FOAC & joint box before kick starting any erection activity. The work executing contractor must have to do
correspondence on eamil to concern EE (Const.) with copy to project & engineering department, corporate office, GETCO for necessary concurrence and intimation about to start erection/laying.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
11.EMD BG Format.pdf
4. MAAT LA Networth Form.pdf
5.132 kV 1Cx800 sq. mm UG cable - R3 june 2023.pdf
6.132kV Ranasan-Vijapur Line UG cable BOQ-FOAC.pdf
7.400 220 132 kV LA R6 June 22.pdf
8.Amendment- Structure weight.pdf
9.POA Of JV Agreement-Format.pdf
10.BOQ-R1-E-510.pdf
11.EMD BG Format.pdf
12.Form of LD undertaking 1A.pdf
13.Form of LD undertaking 1B.pdf
14.joint deed for undertaking.pdf
15.Joint venture agreement-Annexure-B.pdf
14A.Revised Annexure-C -Joint Deed of Undertaking.pdf
16.ON - Ammendment for ROW clause Tender Copy.pdf
17.ONLINE SCHEDULE TECH - E-510.pdf
18.Online Schedule-QR-E-510.pdf
19.OPGW (48F) specs final-R2-11.09.2023 final.pdf
20.Public Procurement Circular of GOI.pdf
21.SD cum PBG Format.pdf
22.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
23.SUPPLY ERECTION OF 220KV LINES WO COND.pdf
24.TS SS STR R12 11.03.2024.pdf
25.Letter for CBuD.pdf
26.Relationship clause Circular latest.pdf
File and Drawing List-E-510.pdf
1.Part-1 Tender Spec-132KV Rns-Vijapur LILO Chiloda-E-510.pdf
2.Ammend-1 Part 1-132KV Rns-Vijapur LILO Chiloda-E-510.pdf
3.Tender Notice-132KV Rns-Vijapur LILO Chiloda-E-510.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .