Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC HIMACHAL PRADESH HP | L1 | Accepted-AOC Low | |
| 2 | L2₹3.8 L+₹14,652 (4.01%)Rejected-Finance HIMACHAL PRADESH HP | CHAMBA | HIMACHAL PRADESH | 176315 | L2 | Rejected-Finance HIGH | |
| 3 | L3₹3.8 L+₹16,609 (4.54%)Rejected-Finance | L3 | Rejected-Finance HIGH |
Tender Value
₹4.7 L
EMD Value
₹23,705
Closing Date
10 Oct 2022, 11:00 amClosed
DPO IDP BILASPUR HP
DPO IDP BILASPUR HP
CO GRAVITY GALLERY AT BALHI NALLAH GP JHABOLA
2022_CPD1_65919_1
PR-42/BRN/2022-23
Open Tender
Civil Works - Water Works
Item Wise
60 days
GRAVITY GALLERY AT BALHI NALLAH GP JHABOLA
PAN, GST, BANK DETAIL, TURNOVER, REGISTRATION, UNDERTAKING
7 documents required · 7 mandatory
₹200
DPO IDP BILASPUR HP
₹23,705
14 Oct 2022
3 Oct 2022
10 Oct 2022
3 Oct 2022
10 Oct 2022
3 Oct 2022
3 Oct 2022 - 10 Oct 2022
Electrical Items :
Earth work in excavation for all types structure such as retaining wall breast wall culverts drain and parapets exectra in all types of classification of soil comparising ordinary soil ordinary rock, hard rock chiseling/wedging of rock blasting is prohibited as perdrawing techincal specification clouse 305.1 and disposal of meterial up to any lead and up to any lift including dressing of side & bottom & back filling in trenches with excavated suitable approved materail to the original surface in layer not exceeding 150 compacted thickness including shring & strutting & pumping & bailing out of water & soil water up to any depth & any quantum of water including cleaning of slush which may out during dewatering as per entire satisfation & as per direction of engineer in charge including carriage of material with all leads & lifts.
Providing and lying on position cement concrate1:3:6 (1 cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
Providing and lying on position cement concrate1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Centering & shuttering including strutting, propping etc.and removal of form for: Suspended floors, roofs, landings, balconies and access platform
Centering & shuttering including strutting, propping etc.and removal of form for: Suspended floors, roofs, landings, balconies and access platform (Slab)
Providing and lying on position cement concrate1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
P/F Mild steel/Tore steel reinforcement including bending binding and placing in position. Tour steel etc.
12 mm Cemant Plaster in Cm 1:4
Stone filling behind R/Wall and W/wall both side
Name plate size with oil paint 1.0''X045"X0.45"
Arun Kumar
Robin
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .