Tender Value
₹55.9 L
EMD Value
₹1.1 L
Closing Date
28 Sept 2026, 1:00 pm2d left
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer PWD Rnb division Leh
Construction of link road form main road from Takchos house to Tsagchung khamba house chunker Nimoo ( Under Distt plan )
2026_PWD_19583_1
E Tender 72 of R and B Division Leh
Open Tender
Civil Works - Others
Percentage
30 days
LEH
Please refer Tender documents.
9 documents required · 9 mandatory
₹560
Office of the Executive Engineer Rnb division Leh
₹1.1 L
18 Sept 2026
18 Sept 2026
30 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.
All kinds of soil. | 288.49 | CUM | 278.09 | ₹80,226.18 |
| - | Dry stone pitching ( any thickness ) including cost of stone . On Horizontal. | 101.35 | CUM | 1,258.05 | ₹1,27,503.37 |
| - | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded
stone aggregate 40 mm nominal size derived from natural sources) | 67.8 | CUM | 5,725.33 | ₹3,88,177.37 |
| - | Random rubble masonry with hard stone in foundation and plinth including
levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded
stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 224.59 | CUM | 5,730.38 | ₹12,86,986.04 |
| - | Random rubble masonry with hard stone laid dry in foundation, plinth &
walls
Laid without bond stone | 149.72 | CUM | 4,010.89 | ₹6,00,510.45 |
| - | Providing and laying cement concrete in retaining walls, return walls, walls (any
thickness) including attached pilasters, columns, piers, abutments, pillars, posts,
struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor
blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding
the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm
nominal size) | 75.6 | CUM | 8,362.45 | ₹6,32,201.22 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having
slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window
sills, staircases and spiral stair cases above plinth level up to floor five level,
excluding the cost of centering, shuttering, finishing and reinforcement, with
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size). | 9.46 | CUM | 11,551.66 | ₹1,09,278.7 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,135.44 | kg | 109.33 | ₹1,24,137.66 |
| - | Centering and shuttering including strutting, propping etc. and removal of form
work for :
Foundations, footings, bases for columns | 576 | sqm | 306.15 | ₹1,76,342.4 |
| - | Suspended floors, roofs, landings, balconies and access platform | 24 | sqm | 738.64 | ₹17,727.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_46330.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .