| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 CrAccepted-AOC DUKANGANJ VARANASI | VARANASI | UTTAR PRADESH | ₹8.5 Cr | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹8.7 CrRejected-Finance | ₹8.7 Cr | L2 | Rejected-Finance IInd Lowest |
| Sl No | Description | Qty | Unit | M/s Shyamdhar Enterprises L1 | C S Infraconstruction Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 23,850 | Sqm | 8.3 ₹2.0 L | 9 ₹2.1 L |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator including cutting , trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,128.03 | Cum | 50 ₹2.6 L | 65 ₹3.3 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 16,481.72 | Cum | 150 ₹24.7 L | 200 ₹33.0 L |
| 4.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,128.03 | Cum | 55 ₹2.8 L | 60 ₹3.1 L |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 4,966.91 | Cum | 2,000 ₹99.3 L | 2,200 ₹1.1 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 3,961.5 | Cum | 2,100 ₹83.2 L | 2,300 ₹91.1 L |
| 7.00 | Providing and applying primer coat with SS 2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 38,225 | Sqm | 38 ₹14.5 L | 39 ₹14.9 L |
| 8.00 | Providing and laying Dense Graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 2,299.8 | Cum | 9,800 ₹2.3 Cr | 10,000 ₹2.3 Cr |
| 9.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 38,330 | Sqm | 10 ₹3.8 L | 11 ₹4.2 L |
| 10.00 | Bituminous Concrete Grading 2 Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,149.9 | Cum | 10,500 ₹1.2 Cr | 11,000 ₹1.3 Cr |
Tender Value
₹8.7 Cr
EMD Value
₹17.4 L
Closing Date
16 Dec 2025, 12:00 pmClosed
Shri Praveen Kumar
Office of the SE, Varanasi Circle, PWD, Varanasi
Widening and Strengthening work of Road from Bhabhaura Naka (Km 39 of SH-97) to Shahabganj Border via Musakhad (Km 6 to 9 and Km 13 to 15.600)
2025_CEUVZ_1097425_1
SE Ref. No 5779/183com-va-vritt/25-26 Dt. 19.11.25
Open Tender
Civil Works - Roads
365 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,590
₹17.4 L
Yes
Varanasi
29 Mar 2026
8 Dec 2025
16 Dec 2025
8 Dec 2025
16 Dec 2025
8 Dec 2025
8 Dec 2025
Amount
Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Excavation for roadwork in soil with hydraulic excavator including cutting , trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying primer coat with SS 2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying Dense Graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Bituminous Concrete Grading 2 Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of Earthen Shoulder with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 meter as per SI No. 5 (2.6 b) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Excavation for roadwork in Hard Rock (blasting prohibited) with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
M-25 Reinforced Cement Concrete in culvert complete as per Drawing and Technical Specification for culvert Slab. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing Weep holes in Stone Masonry plain/Reinforcement concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structure slope of 1(V) 20(H) towards drawing face complete as per drawing and technical specification. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Drainage spouts complete as per drawing and technical specifications Clause 1209. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 ( For Divergen). (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing , Laying , fixing & jointing 350 mm RCC Hume Pipe inculidng collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing , Laying , fixing & jointing 600 mm RCC Hume Pipe inculidng collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular sub-base for Divergon work by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Stone masonry work in cement mortar 1:3 for Foundation complete as per drawing and Technical Specifications (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Stone masonry work in cement mortar 1:3 for Substructure complete as per drawing and Technical Specifications (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
C.C.with M-20 (1:2:4) cement, coarse sand & 20 mm size stone aggregate including s/o all material labour T&P etc required for proper completion of the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 including supply of all materials labour and T & P etc. required for proper completion of the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
R.C.C.with M-20 cement, coarse sand & 20mm size stone aggregate including s/o all material labour T&P etc required for proper completion of the work for Drain & Coping. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Supplying and fixing of Km stone Complete in all respect (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Supplying and fixing of Hectometer stone Complete in all respect (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
C S Infraconstruction Limited (BID ID -5742146)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
SBD2.pdf
Tender Documents • 0.15 MB
SBD1.pdf
Tender Documents • 0.30 MB
Addendum.pdf
Additional Documents • 10.67 MB
BOQ_2020705.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid