Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC 2A SUBODH BANERJEE ROAD KOLKATA BARISHA WEST BENGAL PIN 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | ₹15.4 L | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹15.8 L+₹38,624.85 (2.50%)Rejected-Finance | ₹15.8 L+₹38,624.85 (2.50%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹15.9 L+₹46,195.32 (2.99%)Rejected-Finance | ₹15.9 L+₹46,195.32 (2.99%) | L3 | Rejected-Finance Being L3 |
Tender Value
₹15.4 L
EMD Value
₹30,900
Closing Date
11 Feb 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer Metropolitan Drainage Mechanical Division Jalasampad Bhawan (4th floor) Salt Lake City, Kolkata-700091
Replacement of 8 nos draw shutters 6 nos at 14vent sluice at Dhosa and 2 nos at 4vent Lenin sluice and servicing of all hoisting system all within the Block PS Baruipur Dist24 PRGS South
2026_IWD_992776_3
WBIW/EE/MDMD/e-NIT-18/2025-26
Open Tender
MECHANICAL
Percentage
Baruipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹30,900
10 Sept 2026
22 Jan 2026
12 Feb 2026
22 Jan 2026
11 Feb 2026
22 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Taking out old existing unservicable damaged gate shutter of canal/river completely after disengaging from hoisting system completely for installation of new gate shutter. The work includes cutting of gates into suitable pieces by gas cutting, removing the same by mechanical means or suitable crane, stacking all the pieces at the suitable place or as directed by the Engineer in charge upto a lead of 1000 m. The cost includes cost of man power employed for dismantling and cost of consumables like oxygen, accetylene gas, welding rod, hire charges of machineries, like chain pulley block, gas set, grinding machine, welding set, tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading. The cost of complete dismantling of hoisting system & cost of old unservisable materials handed over to departmental godown including loading & unloading will be provided extra. | |||||
| 1.01 | Gate shuteer size above 4.00 sq.m upto 8.00 sq.m | 2,124 | per kg | 7.41 | ₹15,738.84 |
| 2Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Canal/River as per IS: 5620 - 2000/Latest Revision consisting of skin plate, vertical and horizantal grider, stiffener etc. made of MS material consisting of angle , channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, Aligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification (without painting). | |||||
| 2.01 | Width of Gate shuteer size upto 2 metre | 4,839 | per kg | 154.93 | ₹7,49,706.27 |
| 3Fabrication , supply, erection and commissioning of embeded parts consisting of seal beam, Guide channel with all accessories for vertical gate of canal/river made of MS material consisting of angle, channel, beam, plate, flat, etc. conforming to IS : 2062 - 2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, Aligning, Anchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting). Remarks: Cost for civil works to be taken from PWD (R) directorate seperatly | |||||
| 3.01 | (iii) Guide channel/Guide path/Top seal path | 224 | kg | 170.43 | ₹38,176.32 |
| 3.02 | (ii)Seal beam | 156.42 | kg | 169.24 | ₹26,472.52 |
| 4Supply, installation, testing and commisioning of following items for hoisting system and gear box as mentioned below as per direction including cost of Materials, Machinaries ,Manpower, Cutting, achining, Aligning, Anchoring, Welding, Finishing, Consumables,Carriage and all overheads with all leads and lifts complete as per specification(without painting) | |||||
| 4.01 | ii)Bush (GM) | 4.39 | kg | 1,612.51 | ₹7,078.92 |
| 4.02 | iii)Shaft/pin with key ways made of SS-304 | 7.8 | kg | 973.7 | ₹7,594.86 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_2427966.xls
BOQ • 0.32 MB
2911i.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .