Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,822
Closing Date
12 Aug 2026, 6:00 pm
Executive Engineer REW Baramulla
Executive Engineer REW Baramulla
CONSTRUCTION OF GENERAL FOOT CULVERT OVER NALLAH KASDAJAN NEAR MASJID ISMAIL AT KASDAJAN WARD NO.6 PANCHAYAT BELA SALAMABAD BLOCK BONIYAR YEAR 2026-27 SCHEME CDF
2026_RDPR_317619_22
154/Xen/Rew/Bla/2026-27 Dated 24/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,822
24 Jul 2026
24 Jul 2026
13 Aug 2026
24 Jul 2026
12 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
( Hard Rock Blasting prohibited) | 13.44 | cum | 2,218.1 | ₹29,811.26 |
| - | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 3.19 | cum | 479.3 | ₹1,528.97 |
| - | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches/Rooms excluding carriages of Stones.(Under foundation trench & Floors) incl carriage | 4.82 | cum | 1,000 | ₹4,820 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.53 | cum | 5,202.9 | ₹2,757.54 |
| - | Providing and laying in position plain cement concrete 1:3:6mix ratio M10 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 13.3 | cum | 5,733.6 | ₹76,256.88 |
| - | Providing and laying in position specified grade of reinforced cement concrete M-20 grade including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | 0.66 | cum | 7,788.4 | ₹5,140.34 |
| - | Providing and laying in position specified grade of reinforced cement concrete M-20 grade including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works above plinth level | 0.33 | cum | 9,821.85 | ₹3,241.21 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level (Mild steel and medium tensile steel bars) | 99.4 | kg | 123.2 | ₹12,246.08 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete. | 34.79 | Sqm | 286.35 | ₹9,962.12 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for:
Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 0.83 | Sqm | 577.55 | ₹479.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1041884.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].