Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹24.8 Laccepted-aoc | ₹24.8 L | accepted-aoc |
Tender Value
₹24.8 L
Closing Date
30 May 2026, 4:00 pmClosed
PRED
Providing alround C.C path and Compound wall to durga sadan in the premises of Sri Malleswara Swamy Temple at Pedakakani (V) and (M), Guntur Dist
933602
NIT No.34/2025-26 Dt.21.05.2025 of The Executive Engineer,PRI Division, Narasaraopet.
OPEN - NCB
Works
Andhra Pradesh
14 Jun 2026
29 May 2025
( Providing alround C.C Path & Compound wall to Durga sadan in the premises of Sri Malleswara Swamy Temple at Pedakakani(V&M),Guntur(Dt).)Earth work excavation for foundation and depositing at site with intial lead and lift in Loamy,clayey soils like black cotton,red earth and ordinary gravel including all operational,incidental,labour charges such as shoreing,sheeting,planking shuttering etc.,complete for finished item of work as per SS.
Filling with sand in foundations & basement from approved source to site including cost and conveyance of all materials and all labour charges etc., for finished item of work as per SS
P.C.C(1:4:8) prop.nominal mix for foundation levelling courses and below flooring beds using 40mm size H.G.metal upto Plinth level from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all taxes on all materials and all labour charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as per SS
VRCC- M20 Nominal mix using 20mm size H.G m/c metal including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS(Column footings)
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors
Brick work with C.M(1:6) using 2nd class bricks including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(For Basement)
for Super Structure
Plastering 12mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS
Supply and fixing of PVC Pipes and Accessories including labour charges for laying ,fixing and commissioning the PVC Pipes including couplers/bends/tees etc.,any diameter including fixing necessary fittings like bends,plugs couplers jucntions ,tees etc., with solvent jointing as per standard practice.(4" pVC pipe)
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BId Document.doc
TENDER_DOCUMENT • 0.37 MB
BOQItems- Pedakakani-Providing allround C.C Path & Compound wall to Durga sadan -22..00.xls
TENDER_DOCUMENT • 0.57 MB
CC PATH Estimation.pdf
TENDER_DOCUMENT • 2.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .