| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | ₹2.7 Cr | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹3.5 Cr+₹75.1 L (27.8%)Rejected-Finance | ₹3.5 Cr+₹75.1 L (27.8%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹3.6 Cr+₹86.5 L (32.0%)Rejected-Finance | ₹3.6 Cr+₹86.5 L (32.0%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | Rejected-Technical G1 12 INDEXEL ENGINEERING ROAD NO 4 I P I A KOTA KOTA RAJASTHAN 324005 | KOTA | RAJASTHAN | 324005 | - | - | Rejected-Technical Not validated since firm not submitted EMD and exemption of EMD for MSME firm is not applicable in work contracts |
| 5 | Rejected-Technical 70 VARDHMAN NAGAR A P O SHYAM NAGAR AJMER ROAD JAIPUR PIN 342019 | JAIPUR | 342019 | - | - | Rejected-Technical Not validated since firm has attached details of one SCADA work, which is still in progress. Hence firm has not completed any SCADA work to meet eligibility criteria. |
Tender Value
₹3.2 Cr
EMD Value
₹3.9 L
Closing Date
8 Aug 2022, 6:00 pmClosed
CE Jodhpur Zone
HQ CE Jodhpur Zone
PROVN OF SCADA SYSTEM FOR WATER SUPPLY OF CENTRAL ENGG SERVICES IN MIL STN JAMNAGAR (JOB NO 03 AMWP/11 DIV/ADI/Q3/2020-2021)
2022_MES_507671_2
800565/JAM/2021-22/E8
Open Tender
Civil Works
Item Rate
Jamnagar
As per tender docus
8 documents required · 8 mandatory
₹2,000
GE (A) Jamnagar
₹3.9 L
Yes
30 Aug 2022
14 Jul 2022
10 Aug 2022
14 Jul 2022
8 Aug 2022
25 Jul 2022
Amount
M&L for Design, Develop, Integrate and Commissioining SCADA System along with various analysing equipment for Water Supply System as indicated in the layout diagram enclosed as per details attached at tables including Site Inspection, system design, manufacturing / procurement, installation /complete commissioning and testing after installation, comprising of all necessary components and auxiliaries, software programming, licenses, communication system, documentation complete. The SCADA system shall comprise of following:-
(a) Master Control station with personal computer with latest processor and monitor of suitable size. (b) UPS with half an hour backup. (c) Laser Printer. (d) Server. (e) Data Gateway. (f) SCADA software which can be operated programmed and modified by agencies other than developer. (g) PLC / Microprocessor Controllers with indoor / outdoor applications for water sensing display, pump operation with RTU / without RTU or Microprocessor controller and microprocessor transmitter. (h) Suitable communication system including payement of bills to telecom service privider. (j) Motorised butterfly valves (k) Pressure transmitters. (l) Ultrasonic Sensors. (m) Flow meters and switches (n) Air Release solenoid valves The details of Pumping installation, OH Reservoir, UG Sump, Distribution pipe lines etc are as given below:-
(i) Main Pump House: (a) 100 HP Pump motor -05 Nos (b) 60 HP Pump motor - 05 Nos (c) UG Sump of 2L GL - 02 Nos (d) Sluice Valve 300mm Dia - 01 No (e) Sluice Valve 250mm Dia - 05 Nos (f) Sluice Valve 200mm Dia - 01 No (g) Sluice Valve 150mm Dia - 10 Nos (h) Sluice Valve 350mm Dia - 01 No (h) Gate Valve 25mm for priming - 10 Nos (j) Flow meter 250mm for Air force - 01 No
(ii) Navy Pump House : (a) 75 HP Pump motor -04 Nos (b) UG Sump of 1L GL - 01 No (c) Sluice Valve 250mm Dia - 01 No (d) Sluice Valve 150mm Dia - 04 Nos (e) Gate Valve 25mm for priming - 04 Nos (f) Flow meter 300mm for Navy PH - 01 No
(iii) Old Pump House : (a) 60 HP Pump motor -01 No (b) 30 HP Pump motor - 01 No (c) UG Sump of 1L GL - 01 No (d) UG Sump of 0.25L GL - 02 Nos (e) OH Reservoir 0.20 L GL- 01 No (f) Sluice Valve 250mm Dia - 03 Nos (g) Sluice Valve 150mm Dia - 03 Nos (h) Sluice Valve 100mm Dia - 01 No (j) Gate Valve 25mm for priming - 02 Nos
(iv) MAP Pump House : (a) 20 HP Pump motor -03 Nos (b) UG Sump of 2L GL - 01 No (c) OH Reservoir 2 L GL- 01 No (d) Sluice Valve 250mm Dia - 01 No (e) Sluice Valve 150mm Dia - 01 No (f) Sluice Valve 80mm Dia - 03 Nos (g) Gate Valve 25mm for priming - 03 Nos
(v) BG Line Pump House : (a) 25 HP Pump motor -02 Nos (b) UG Sump of 0.3L GL - 01 No (c) Sluice Valve 80mm Dia - 02 Nos (d) Gate Valve 25mm for priming - 02 Nos
(vi) MH Over Head Tank (35000 GLN) : (a) Sluice Valve 150mm Dia - 02 Nos
(vii) OTM Over Head Tank (1.5 L GLN): (a) Sluice Valve 300mm Dia - 01 Nos (b) Sluice Valve 200mm Dia - 01 Nos (c) Sluice Valve 150mm Dia - 01 Nos
(viii) 152 AD Over Head Tank (1.5 L GLN) : (a) Sluice Valve 300mm Dia - 01 Nos (b) Sluice Valve 200mm Dia - 01 Nos
(ix) New Line Over Head Tank (3.0 L GLN) : (a) Sluice Valve 150mm Dia - 02 Nos
(x) BG Line Over Head Tank (0.25 L GLN) : (a) Sluice Valve 150mm Dia - 05 Nos
Note:- (i) Design of Communication System shall be done by the bidder, Cloud based server / data storage / communication shall not be used and only local server based system shall be designed. (ii) The cost of each item shall also be attached to arrive at pricing in case of some additional / reduction at site. (iii) Operating system, system software and programming shall not be intellectual property of any agency. (iv) The memory in the hard disk shall be suitable for six months data. The backup storage devices shall be provided for archiving of data more than six months old. (v) In case of addition of installations, the system shall be capable of integrating the same. (vi) The responsibilty of the agency is restricted to intimate mechanical and electrical failures such as failure of pumps, leakage etc. Such repairs shall be carried by MES. (vii) Operation and maintanance charges to be paid separately. (viii) The SCADA system should have provision of both manual and automatic operation of installations.
Operate SCADA System during Defect Liablity period (DLP) of two years (contractor to provide month wise breakdown details of the same) including payment of bills of telecom service provider. Note:- Cost of comprehensive maintanance of SCADA system including cost of upgradation, cost of spares for defect liabilty period (DLP) of 02 Years, shall be deemed included in lump sum cost of item No 01.00.
Operation and comprehensive maintanance of SCADA System including cost of upgradation, cost of spares for 08 Years post defect liabilty period (DLP), operation including payement of bills by telecom service provider. (Contractor to provide month wise breakdown details of the same) Note:- Cumulative payment shall be made (after expiry of DLP) on not exceeding basis as per following schedule:- (i) After 1st Year - 12% (ii) After 2nd Year - 24% (iii) After 3rd Year - 36% (iv) After 4th Year - 48% (v) After 5th Year - 60% (vi) After 6th Year - 72% (vii) After 7th Year - 84% (viii) After 8th Year - 100%
Raja enterprises
Recktronic Devices and Systems
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .