Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.4 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹13.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.8 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BABY B L4 | K G SIVANANDAN L5 | HASSAN MM L1 | AYYAPPANKUTTY M M L3 | MUHAMMED M K L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Replacement of Damaged Structural in Sulphuric Acid Plant and Boat Basin Area in FACT-CD | ||||||||
| 1.01 | Fabrication, and Replacement of Damaged Structurals With New Painted Structurals in SA Plant and Boat Basin Area:
Collection of required materials from FACT -CD stores / plant area and transport to the work site at SA Plant area. New structure shall be fabricated as per the instruction of the Officer - in -Charge to meet site requirement. Existing damaged structure in various locations of SA Plant area shall be dismantled/removed and replaced with newly fabricated one / modified structure to meet the site requirement. Damaged structurals shall be transported to scrap yard/area earmarked as per the instruction from site in charge.shall be painted with one (01) coat of zinc chromate yellow primer of approved make/quality and two (02) coats of synthetic enamel paint of distinct colours of approved make/quality. The surfaces to be painted are to be cleaned manually using wire brush to the extent that entire surface is free from dirt, dust, oil,grease or any foreign material.The structural steel after transporting from store to worksite shall be immediately be cleaned and first coat primer shall be applied. The structurals after fabrication and applied one after the other after giving sufficient curing time after each coat applied at all elevations. Any area inaccessible after erection shall be painted beforehand.All costs incurred in painting including cost of paints,primers,painting equipments, cleaning equipments, handling charges, scaffolding and any other incidental expenses will be under contractor's scope. | 50 | MT | 7,40,000 ₹7,40,000 | 13,75,000 ₹13,75,000 | 5,45,000 ₹5,45,000 Lowest | 6,48,850 ₹6,48,850 | 5,74,500 ₹5,74,500 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
10 Jul 2026, 2:00 pmClosed
NITHIN C S
SM (P and P)-CD
Replacement of Damaged Structural in Sulphuric Acid Plant and Boat Basin Area in FACT-CD
2026_FACT_914673_1
4097/2026-2027/E33745
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
13 Jul 2026
25 Jun 2026
11 Jul 2026
25 Jun 2026
10 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replacement of Damaged Structural in Sulphuric Acid Plant and Boat Basin Area in FACT-CD | |||||
| 1.01 | Fabrication, and Replacement of Damaged Structurals With New Painted Structurals in SA Plant and Boat Basin Area:
Collection of required materials from FACT -CD stores / plant area and transport to the work site at SA Plant area. New structure shall be fabricated as per the instruction of the Officer - in -Charge to meet site requirement. Existing damaged structure in various locations of SA Plant area shall be dismantled/removed and replaced with newly fabricated one / modified structure to meet the site requirement. Damaged structurals shall be transported to scrap yard/area earmarked as per the instruction from site in charge.shall be painted with one (01) coat of zinc chromate yellow primer of approved make/quality and two (02) coats of synthetic enamel paint of distinct colours of approved make/quality. The surfaces to be painted are to be cleaned manually using wire brush to the extent that entire surface is free from dirt, dust, oil,grease or any foreign material.The structural steel after transporting from store to worksite shall be immediately be cleaned and first coat primer shall be applied. The structurals after fabrication and applied one after the other after giving sufficient curing time after each coat applied at all elevations. Any area inaccessible after erection shall be painted beforehand.All costs incurred in painting including cost of paints,primers,painting equipments, cleaning equipments, handling charges, scaffolding and any other incidental expenses will be under contractor's scope. | 50 | MT | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_961232.xls
BOQ • 0.23 MB
Compliance.pdf
Tender Documents • 0.10 MB
SpecialConditions.pdf
Tender Documents • 0.17 MB
Tenderdocuments.pdf
Tender Documents • 1.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].