Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
13 Sept 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Irrigation and FC Division
Executive Engineer Jal Shakti I and FC Div Baramula
FP work by way of providing RS masonry Wall at Masjid Qadeem Kawajabagh
2021_IFC_136704_8
e nit 05 of 2021-22
Open Tender
Civil Works
Item Wise
20 days
Baramulla
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer Irrigation and FC Division
Exempted
14 Sept 2021
28 Aug 2021
14 Sept 2021
28 Aug 2021
13 Sept 2021
28 Aug 2021
90 days
Amount
Earth work in excavation by manual means over areas (Exceeding 30 cm and up to 1.5 mtr in depth 1.5 mtr in width as well as 10 sqm on plan )including all leads and lifts as directed by Engineer In-charge incl. Pumping out water Construction of temporary ring bund with earth filled bags and dismantling of the ring bund Complete Job. nothing shall be paid on account of Dewatring and ring bund if also involved
Provding and laying of Dry stone soling
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Random Rabble masonry with hard stone from Quarry in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone) agg. 20 mm nominal size) at plinth level with Cement mortar 1:6 (1 cement: 6 fine sand)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for colum
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Pointing on stone slab ceiling with cement mortar 1 : 2 (1 cement : 2 fine sand) Flush/Ruled Pointing
Dry random rubble masonry with hard stone in foundation and plinth With bond stone. Quarry
Carriage of materials from source to road site of Work by Mechanical Transport.
a)Stone Avg. lead 06 Km
b) Stone Agg. 20 mm Avg. lead 6 Km
c) Stone Agg 40 mm lead 6 Km
d) Sand Avg. lead 5 Km
e) Cement Avg. lead 01 Km
Carriage of materials from road site to actual site of work by Head load Avg. lead 50 mtrs
a)Stone
b) Stone Agg 20 mm + Sand
c) Sand
d) Cement
e) Steel
SHAKEEL AHMAD NAGOO
GHULAM NABI SHEIKH
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .