Tender ID
Tender Value
₹13.0 L
EMD Value
₹25,981
Closing Date
18 Mar 2026, 4:00 pmClosed
Executive Engineer (East Zone), VMC
LAYING OF NEW D.I WATER PIPE LINE IN HARE KRISHNA TOWNSHIP (80/20 SHCHEME OF GOVT OF GUJARAT) IN WARD 4,EAST ZONE ,VADODARA (EXCLUDING GST)
283185
1254/2025-26
Open
Civil Works - Water Works
Works
Vadodara
3 documents required · 3 mandatory
₹4,000
Yes
Municipal Commissioner, Vadodara Municipal corporation
₹25,981
Yes
5 Mar 2026
5 Mar 2026
5 Mar 2026
18 Mar 2026
5 Mar 2026
herein technical bid are (94 nos.). The set of tender documents as per list
attached is issued to :-
Name of Tenderer : ___________________________
Address of Tenderer : ___________________________
The fees of the tender documents is Rs.4000/- (Rupees Four Thousand).
The date of sale of Tender document vide receipt no. _______Dated
__________. The Tenderer shall submit this tender in accordance with the
various instructions included in the tender documents.
Signature of Tenderer : ____________________
Signature of the Officer issuing
the Tender documents : ____________________
Signature of the Officer
opening the Tender : ____________________
Executive Engineer (E.Z)
Vadodara Municipal Corporation
VADODARA MUNICIPAL CORPORATION
“FORM OF TENDER”
The Municipal Commissioner,
Municipal Corporation,
Khanderao Market Building,
Reference is made to the tender invited by you for the work of Laying of New DI
water Pipe line Hare krishna township society ( 80/20 scheme of government) , in Ward No.
I/We have visited the site and have examined the Drawings, General conditions of Contract,
Specifications, etc. as given in Tender Documents for the above work.
I/We hereby offer to undertake the work of :-
Laying of New DI water Pipe line in Hare krishna township society (
80/20 scheme of government) , in Ward No. 4 East zone
In conformity with the specifications, general and special conditions of
contract, etc as given in Tender documents at the respective rates
mentioned in my/our tender.
I/We undertake to complete the works indicated above within 6 calendar
months from the date of receipt of work order.
I/We have deposited as earnest money sun as indicated below
Rs.25981/- (Rupees twenty Five thousand nine hundred eighty one only)
which amount is not to bear any interest and I/We do hereby agree that this
sum shall be forfeited if in the event of the Vadodara Municipal Corporation
accepting my/our tender. I/We fail to execute the contract deed when called
upon to do so. I/We hereby agree that unless and until a formal agreement
is prepared and executed in accordance with this, Tender together with your
written letter of acceptance there of shall constitute a binding Contract
I/We understand that you are not bound to accept the lowest or any tender
you may receive.
Yours Faithfull
Name of Partner’s of the firm
VADODARA MUNICIPAL CORPORATION
Tender and Acceptance of Tender
The Municipal Commissioner,
Municipal Corporation,
Khanderao Market Building,
I/We hereby tender for execution of the works Laying of New DI water
Pipe line in hare Krishna township ( 80/20 scheme of government) , in
Ward No. 4 East zone
as per tender within the time schedule of completion of work for jobs,
separately signed and accepted by me/us at the Schedule of rates quotes
by me/us for the whole work in accordance with General Tender Notice,
General Conditions of contract. Special conditions of Contract,
Specification for material and workmanship, Drawings, time schedule of
completion of jobs and other documents and papers all as details in Tender
1. It has been explained to me/us that the time stipulated for jobs and
completion of work in all respects and in different stages mentioned in
the “Time Schedule of completion of jobs” and signed and accepted by
me/us in the essence of Contract. I/We agree that in the case of
failure on my/our part to strictly observe the time of completion
mentioned for jobs or any of them and to the final completion of work
in all respect according to the schedule set out in the said “Time
Schedule of completion of jobs.” I/We shall pay compensation to the
owners as per provision and stipulates contained Clauses of General
Condition of contract and I/We agree to recovery being made as
specified therein in exceptional circumstances, extension of time of
which shall always be in writing may, however, be granted by the
Executive Engineer at his entire discretion for some items of work and
I/We agree that such extension of time will not be counted for the
extension of completion dates stipulated for jobs for the final
completion of works as stipulated in the said “Time Schedule of
Completion of Jobs.
3. I/We agree to pay the Earnest money and security deposit and accept
the term and conditions as laid down in the memorandum below in this
a) General description of work: Laying of New DI water Pipe line in
Hare Krishna township society ( 80/20 scheme of government) , in
Ward No. 4 East zone
b) Tender amount :- Rs.12,99,046 /- (Rupees Twelve lakh ninty
nine thousand fourty six Only.)
c) Earnest Money :- Rs.25981/- (Rupees twenty Five thousand
nine hundred eighty one only) cash or
demand draft only : When
earnest money paid in
the earnest money is payable as per the
tender notice and clause 32 of instructions
to tenders. The earnest money, if the
tender is accepted, will be retained against
the security deposit.
d) Security deposit : 5% of the contract amount which will be
paid in the manner set out in clause-1 of
“General Conditions of Contract”.
4. Should this tender be accepted, I/We hereby agree to abide by & fulfill
all terms and conditions referred to above and in default thereof to
forfeited pay to the Owner or its successors or its authorized nominees
such of money as per are stipulated in conditions contained in General
Tender Notice and other tender documents.
5. I/We hereby pay the earnest money of Rs. ……………………
(Rupees …………………………………… in cash/Demand Draft of
any Nationalized Bank (Name and Officer of Nationalized Bank) in
favour of Municipal Commissioner, Municipal Corporation, Vadodara.
6. If I/We fail to commence the work specified in the Memorandum in
para (3) above or if I/We fail to deposit the amount of security deposit
specified in the Memorandum in (3) prejudice to any other right or
remedy be at liberty to forfeit the said earnest money in full. Otherwise
the said earnest money shall be retained by Owner the security
deposit specified in (3) above. The said Owner shall also be at liberty
to cancel the notice of acceptance of tender if I/We fail to deposit the
security as aforesaid or to execute an agreement or to start work as
stipulated in the tender documents.
I/We enclose herewith evidence of my/our experience of execution of
works of similar nature and magnitude carried out by me/us in the
prescribed Performa in Appendix I and also the Income Tax and Sales Tax
Clearance Certificates.
Dated ………..day of …….2026.
Name of Block letters
Address : Signature of Tenderer(S)
with the seal of the firm.
Notice Inviting
VADODARA MUNICIPAL CORPORATION
VADODARA MUNICIPAL CORPORATION
PRE QUALIFICATION DOCUMENTS
The criteria and documentation required for pre qualification of
the bidders are as below. This shall be submitted in Envelop “A”.
1) The bidder/firm in the same name, must be well established,
experienced contractors, having registered minimum in ‘E-1’ Class as an
approved contractor with Govt./MES/State Govt./Semi Govt./ Municipal
Corporation or reputed organization. (Attach registration certificate of
appropriate class).
Note: The successful bidder shall have to get register as contractor
in appropriate class with VMC, within 1 month from date of issue of
work order OR before submitting First running Bill whichever is
earlier, in case the bidder is not registered with VMC.
2) Details of Technical & Supervisory personnel already employed by the
firm work. The list of engineers shall be attached with their qualification.
3) Copy of certificates under labor act and P.F. Registration Certificate or
P.F. declaration.
4) Copy of Income Tax Return of last 3 years
5) Copy of GST Provisional Registration certificate With GST number.
6) 2% Earnest Money Deposit paid in cash or demand draft only as per
Resolution no.22/2018-19, Date.12.09.2018 (EMD will not be accepted
in form of bank guarantee)
7) Attach Gujarati pre-qualification bid, duly signed on all the Pages with
tender fees money receipt.
8) Bank solvency certificate of Nationalized Bank shall be 25% of the
9) Bidders must be submitting declaration of being “Non black listed “firm
from any recognize authority.
10) Detail communication facilities like Office/Residence phone
Number and address, mobile number, fax number, Email address
Should be available with the bidder.
11) Average Annual financial turnover during the last 3 years,
Ending 31st March of the previous financial year, should be at
Least 30% of the estimated Cost.
12) Experience of having successfully completed work during last
years*(For Civil) ending 31st mar 2026 should be either of the following :-
Three similar completed works costing not less than the amount equal to
40% of the estimated cost. OR
Two similar completed workscosting not less than the amount equal to 50%
of the estimated cost. OR
One similar completed work costing not less than the amount equal to 80%
of the estimated cost)
NOTE:- On going work or partly completed work shall not be Consider.
The similar work means only lying {labour work} of DI/CI pipeline in
Reputed Government organization / Semi Government Organization.
13) Regarding Experience of similar nature of work, bidders must have to
submit the Form (3A) duly sign by responsible officer. Without Form (3A)
experience will not be consider.
14) All the zerox copy must be duly certified for true copy by Gazetted
officer. Even though the bidders/firm may meet the above qualifying criteria,
the firm shall be liable to be disqualified or contract may discontinue at any
time, if it is found that they have made misleading of false representation,
statements and attachments submitted towards proof of the qualification
requirement and/or their record or poor performance such as abandoning
the works, delay in completion of work, litigation history, financial failure etc.
15) Bidder has to submit list of work under arbitration/court case or any
dispute. The bidder shall submit final/latest decision/status of
arbitration/court case for all disputes and if it is found that the decision of
dispute is against the bidder then such bidder is liable to disqualify even if
other qualification criteria are met with. If Bidder has On going arbitration
with VMC and decision is pending, then such bidder is liable to disqualify
even if other qualification criteria are met with.
16) Soft copy of PQ document & price bid should be sent/fill on n-procure
website. Hard copy of PQ documents should be submitted as per tender
VADODARA MUNICIPAL CORPORATION
INSTRUCTION TO TENDERERS
1. The Tenderer are advised to inspect the site of works and be fully
acquainted with the site conditions which may be necessary for the
purpose of submitting the tender and for executing the work. If
requested in advance and in writing department will arrange to visit the
2. In the event of the tender being submitted by the firm, it must be
signed by all the partners or by any partner who has been specifically
authorize under the Partnership deed to sign and execute contracts on
behalf of the firm or by any person holding a Power of Attorney
authorized him to sign and execute the contract on behalf of the firm.
[The Authority letter is required to be enclosed along with the Tender].
3. Receipts for payments made on account of any work, when executed
by a firm, can be signed by any of the partners of the firm or any other
person authorized by the firm under a Power of Attorney of give
effectual receipt for and on behalf of the firm.
4. The tender shall be filled in strictly according to columns prescribed in
the tender stating the rates at which tenderer are willing to undertake
each time of work. Any modifications or additions in the item of works
or in any other part of the tender made by the Tenderer will not be
5. The VMC shall have the right to reject all or any of the tenders without
assigning any reason for such rejection.
6. Measurements for all the works shall be taken by standard measures
available with the VMC and practice and rules framed by the VMC
from time to time. In general IS 1200 shall be followed for
measurement of civil works.
7. The tenderer are required to quote only firm rates and any condition
attached to the rates quoted by them is likely to disqualify the tender
for evaluation and consideration for award of the work.
8. The tenderer are advised to send their tender by Registered / Speed
post so that tender reaches to VMC on or before the due date. Any
tender received after due date shall not be considered.
9. Tender not accompanied by Earnest Money in the manner provided in
the tender notice shall not be considered. Amount of earnest money
shall not bear any interest and will be refundable to the Tenderer, if
tender is not accepted.
10. Tender shall be filled in and signed only by the duly authorized person
or persons of the Tenderer. If at any item during security and
finalization of the tenders, it is found that any tender or tenders are
signed by the persons who are not duly authorized then the earnest
money received with such tender shall stand forfeited.
11. Tenderer shall have to pay Security Deposit in the time and manner
prescribed under Clause 1 of the General Conditions of Contract.
12. Successful Tenderer shall keep all documents ready for signing
“Agreement with the VMC”. Tenderer will have to make himself/itself
available at fifteen days notice for executing such Agreement. The
tenderer are advised to carefully study the various conditions of he
contract, work specification, site conditions, VMC’s rules and
regulations with regards to safety and security, etc.
14. Tenderer shall submit along with the tender a list of equipment which
he proposes to use for this work.
15. Tendered rates shall include all the material, taxes, labour and
requirements of plants, machinery, equipment, supervision, handling,
cleaning, testing etc. (whether mentioned in the item or specifications
etc. or not) which is required and necessary to complete the item.
16. The tenderer are advised to read together with the specifications
including materials and drawings, as specifications are complimentary
part of the item. Items for which details are not given or are given
inadequately reference will be taken from ISI specifications or PWD
handbook. Such details shall be deemed to have been included in the
item and the rates quoted shall be all inclusive. Whether mentioned in
the item or not material test as may be required by the Add. City
Engineer of VMC shall be provided and no extra payment will be made
for that purpose.
17. Specifications are given for certain numbers of items only. However,
the items for which the specifications are not prescribed but which are
relevant to these specifications shall also be executed in accordance
with such specifications.
18. Suitable number of photographs and negatives shall be supplied free
of cost to the VMC every month for the progress of various stages of
the works such as centering, reinforcement, erection of equipments,
19. Tenders are required to quote the rate on percentage basis.
20. Completion time for the work shall be 180 Days from the date of issue
of letter of indent by Vadodara Municipal Corporation.
21. Validity of tenderer’s proposal shall be 180 days from the date of
opening of price bid or last negotiation date if at all allowed.
The tenders, as submitted will consist of the following :
i) Complete set of Tender documents as sold duly filled in and signed by
the Tenderer and as prescribed in different clauses of the tender
ii) Earnest Money Deposit amounting Rs.25981/- (Rupees twenty Five
thousand nine hundred eighty one only) (iii) Power of Attorney of
a True copy thereof duly attested by a Gazetted Officer in case of an
authorized representatives has signed the tender as required in 4-5
clauses thereof.
iv) Income tax clearance certificate & sales Tax Clearance certificate in
original or true copies duly attested by Government Gazette Officer.
v) Declaration regarding the tenderer work of comparable nature and
construction organization in the Performa enclosed and as description
of the works therein.
vi) The full name and address of the Tenderer shall be written on the
bottom left hand corner of the sealed cover.
23. ALL PAGES TO BE INITIALED
All signature in Tender documents shall be dated as well as pages of
all sections of Tender documents shall be initialed at the lower right
hand corner or signed wherever required in the Tender papers by the
Tenderer or by any person holding power of Attorney authorizing him
to sign on behalf of the Tenderer before submission of Tender.
24. RATES TO BE IN FIGURES AND WORDS
The Tenderer shall quote the rates in English both in figures as well as
in words and the rates and amounts tendered by him in the schedule
of quantities as per Performa in Appendix II. The item wise tendered
amount for the work shall be entered in the abstract of estimate and
duly signed by the Tenderer.
25. EVALUATION OF TENDERS
Any error in quantity or amount in Price bid of tender form showing
items of works to be carried out shall be adjusted in accordance with
the following rules :
i) In the event of a discrepancy between description in words and
figures quoted by a Tenderer in the rates column, the description in
word shall prevail.
ii) In the event of an error occurring in the amount column of the
Schedule B of Tender Form showing items of work as a result of
wrong multiplication of the rate and quantity, the unit shall be
regarded, as firm and multiplication shall be amended on the rate.
iii) All errors in totally in the amount and carrying forward totals shall be
iv) Any rounding off of amounts against items or in totals shall be
v) For any item in price bid, the bidder has not quoted the rates (or left
blank), it is treated as ‘zero rate’ and all such item shall be
considered as executed free of cost.
The tendered sum so altered shall, for the purpose of the tenders be
submitted for the sum originally tendered and considered for
26. CORRECTIONS AND ERASURES
All corrections and alterations in the entries of tender papers will be
signed in full by the Tenderer with date. No erasures or over writings
are permissible.
27. SIGNATURE OF TENDERER
The tenderer shall contain the name, residence and place of business
of person or persons making the Tender and shall be signed by the
Tenderer with his usual signature. Partnership firms shall furnish the
full names of all the partners in the Tender. It should be signed in the
Partnership’s name by all partners or, by duly authorized
representative followed by the name and designation of the person
signing. Tender by a firm shall be signed by an authorized
representatives and a power of Attorney in that behalf shall
accompany, the Tender. A copy of the constitution of the firm with
names of all partners shall be furnished.
Witness and sureties shall be persons of status and property and their
names, occupations and address shall be stated below their signature.
29. DETAILS OF EXPERIENCE
The Tenderer should enclose documents to show that he has previous
experience in having successfully completed in the recent past work of
this nature together with the name of Owner’s location of sites and
value of contract.
30. ENGINEER OF CONTRACTOR
The contractor, on or after award of the work, shall name and depute a
qualified Engineer having sufficient experience in carrying out works of
similar nature, to whom the equipments, materials, if any shall be
issued and instructions for construction/execution shall be given.
31. TRANSFER OF TENDER DOCUMENTS
Transfer of Tender documents purchased by one intending tenderer to
another is not permissible.
32. EARNEST MONEY DEPOSIT
The tenderer must pay earnest money as given in the notice inviting
Tenders and attach the official receipt, if paid in cash with the Tender,
failing which the tender is liable to be rejected. The earnest money
can be paid in the form of ONLY Demand draft of any nationalizes
Bank at Vadodara and shall be in favour of Municipal Commissioner,
Khanderao Market, Vadodara. EMD shall be attached with the
Tender.(EMD will not be accepted in form of bank guarantee)
NOTE: No interest shall be allowed on the earnest money deposit by
Tenderer. The earnest money of the unsuccessful tender will be
refundable within a reasonable period of the time without any interest.
The earnest money deposit by successful Tenderer will be retained
towards the Security Deposit for the fulfillment of the contract, but shall
be forfeited, if the Tenderer fails to execute the agreement within
days after the letter of acceptance of Tender.
Tenders submitted by Tenderers shall remain valid for acceptance for
a period of 120 days from the date of opening of price bid. The
Tenderers shall not be entitled during the said period of 120 days,
without the consent of writing of the owner to revoke or cancel his
tender or to vary the tender given or any terms thereof. In case of
tenderer revoking or canceling his tender of revoking the same or vary
any terms in regard to thereof without the consent of owner in writing,
the owner shall forfeit earnest money paid by him along with the
34. TIME LIMIT – PERIOD OF COMPLETION
The period of completion shall be 180 days (Excluding Monsoon) from
the date of issue of any notice to proceed with the work i.e. issue of work
The Stoppage for monsoon and festivals should be granted as follows.
1. Monsoon period : From 1st June to 15 September.
2. Festivals Diwali : 10 days.
3. Holi : 15 day.
If work on site continue during above mention periods, stoppage will
not be granted for that time.
It will be applicable only if it is found reasonable by the department.
Any other extension of time limit demanded by contractor for their
reason, shall not entitle for any price escalation/delay compensation.
Addenda to the Tender documents may be issued prior to the date of
opening of Tenders to clarify documents or to reflect modifications in
the design or contract terms.
Each addendum issued by the Engineer in charge will be distributed in
duplicate to each person or organization to whom a set of Tender
documents has been issued.
Each recipient will retain one copy of each addendum for submission
along with his tender and return one singed copy to the Engineer-in-
charge shall become part of Tender documents.
36. RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
The acceptance of Tender will rest with the Owner. The Owner
however, does not bind itself to accept the lowest tender and reserves
to itself the authority to reject any or all the Tenders received without
assigning any reason whatsoever. The whole work may be split up
between two or more contractors or accepted in part and not entirely,
if considered expedient.
Tender in which any of the particulars and prescribed information are
missing or are incomplete in any respect and/or the prescribed
conditions are not fulfilled are liable to be rejected.
Canvassing in connection with tender is strictly prohibited and tenders
submitted by the tenderer, who resort to canvassing will be liable to
37. Security Deposit
The person / persons whose tender may be accepted (hereafter called
the contractor) shall within 10 days of receipt by him of the notification
of the acceptance of the tender, shall submit the security deposit on
the accepted value of the Tender to the Vadodara Municipal
38. The successful Tender shall be required to execute an agreement
within 10 days from the date of issue of the notice of acceptance of
tender. In the event of failure on the part of the successful tenderers
to sign the agreement within the above stipulated period, the earnest
money or his initial security deposit shall be forfeited and the
acceptance of the tender shall be considered as cancelled.
In the event of progress of work by the contractor, without executing
the contract agreement, the responsibility with all risk and cost shall be
The successful Tenderer will be required to sign the contract
agreement on a stamp paper of the value as per prevailing norms of
VMC. Alternatively, if the Tenderer wishes to sign the agreement, the
same be adjudicated by the State Level Authority competent to do so.
It is responsibility of tenderer to get authorized copy of tender
documents, map etc so that during the time of execution of work
contractor can proceed with work and all time the details of work is
known to the contractor.
General Conditions
VADODARA MUNICIPAL CORPORATION
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS :-
In the Contract documents [as hereinafter defined] the following words
& expression shall have the meanings hereby assigned to them except
where the context otherwise requires :-
1. “The Owner or Employer”, means the Municipal Commissioner
Vadodara Municipal Corporation, which may abbreviated as “VMC”
and includes the Owner’s or Municipal Commissioner, VMC’s
authorized representatives or successors.
2. The abbreviation VMC wherever used in contract shall mean
Vadodara Municipal Corporation and term shall be used to in place of
authorized person or persons who will be operating this contract as
VMC’s representative and will include namely Municipal
Commissioner, Add.City Engineer and Executive Engineer or their
authorized representatives.
3. The “Add.City Engineer ”, shall means the Add.City Engineer of
Vadodara Municipal Corporation and shall include those who are
expressly authorized by him to act on his behalf.
4. The “Executive Engineer”, shall means the Executive Engineer of
Vadodara Municipal Corporation, who is incharge of the project and
shall include those who are expressly authorized him to act for and on
5. “The Contractor”, means the person or persons, firm or Company
whose tender has been accepted by the Owner and include the
Contractor’s legal representatives, his successor and permitted
6. The term “Work or Works” of the contract shall mean all of the
various classes of works to be executed in accordance with the
contract, whether temporary or permanent, and include all labour and
material, machinery, instruments, construction equipment, plant, plant
operation and maintenance, all tools and all other items required for
the completion of the construction. It shall also mean the place of
working, where the context so includes.
7. “Contract”, shall mean the Agreement between the VMC and the
contractor for the execution of works including therein all contract
documents like Condition of Contract, Specification, Drawings, Prices
Bill, Schedule of quantities, Schedule of rates and prices (if any) and
8. The “Contract Price”, means the sum named in the Tender subject
to such additional there to or deduction there from as may be under
the provisions hereinafter the contained.
9. “Construction Plant”, means all machinery, tools, appliances or
thing of whatsoever nature required for the execution, completion or
maintenance of the works or temporary works (as hereinafter defined)
but does not include materials or other things form or forming part to
the permanent work.
10. “Temporary Works”, means all temporary works of every kind
required in or about the execution, completion or maintenance of the
11. “Drawings”, means the drawings referred to in the Specification and
any modification such drawings approved in writing by the Add.City
Engineer / Executive Engineer, Consultant and such other drawings,
diagrams, or sketches as may from time to time be furnished or
approved in writing by the Add.City Engineer / Executive Engineer.
12. “Site”, means the land and other places on under in or through which
the permanent works are to be executed or carried out & any other
land or places provided by the Owner for purpose of the contract.
13. Words importing the singular number only also include the plural and
vice versa where the context requires.
14. ”Contract Documents”, means collectively the Tender documents,
Designs, Drawings, Specifications agreed variations if any, contract
such other documents constituting the Tender and acceptances
15. “The Specification”, shall mean the various technical specifications
attached and referred to in the Tender documents. It shall also
include the latest edition of relevant Indian Standard Specification
published before entering into contract. Further in absence of any
specific reference in I.S.S. the standards and specifications of
P.W.D.H.B. or GWSSB as the case may be will be followed as per the
consent of Add.City Engineer .
16. The “Tender”, means the tender submitted by the contractor for
acceptances by the Owner.
17. The “Alternation Order”, means the order given in writing by the
Engineer-in-charge to effect to or deleting from and alternations in the
18. The “Completion Certificates”, shall mean the certificate to be
issued by the Add.City Engineer , when the works have been
completed to his satisfaction.
19. The “Final certificate”,, in relation to a work means the certificate to
be issued by the Add.City Engineer , after the period of liability is over.
20. The “Period of Liability”, in relation to the work means the specified
periods from the date of issue of completion certificate up to the date
of issue of the final certificate during defects that may appear in the
21. The bidder shall have to submit resource/activity chart of whole work
divided in minimum 10 activities justifying the timely completion of
work. In case the bidder do not submit the schedule of work progress,
it is mandatory to follow the progress of work as decided by VMC
during execution.
22. The bidder must engage minimum one graduate engineers who will
remain present at all time during progress of work & he has to specify
the engineer’s name on their payroll, who will remain available during
execution of work on same site.
CLAUSE 1 SECURITY DEPOSIT
Successful Tender whose proposal will be accepted by the VMC and who
will be referred to as “Contractor” thereafter will have to deposit an amount
equal to five percent of the contract price as contractual obligation in the
mode and schedule as given below :
Amount of Security Deposit payable by the contractor will be 5% of the
contract value. Full amount of S.D. may be paid by the successful Tenderer
in cash/by demand draft or in the form of bank guarantee of nationalized
bank for the period of 365 days from the date of execution of such
guarantee. If at all the contractor opted to do so.
All compensation and other sum of money payable by the contractor to the
V.M.C. under the terms of this contract may be deducted from or paid by
sale of whole or part of security deposit along with deduction from other
payments which may be due or which becomes due to be payable to the
contractor. Whenever the amount of Security Deposit gets reduced lower
than the amount equal to 5% of contract price the contractor shall make it
up equal to 5% of the contract price by depositing money within 15 days. If
the amount of Security Deposit to be paid in lump sum within the period of
10 days as specified above is not paid tender/contract already accepted
shall be considered as cancelled and legal steps taken against the
contractor recovery of the amounts. The security lodged by a contractor
shall be refundable after the final bill & also after providing performance
bank guarantee bond as per clause
CLAUSE 2 : COMPENSATION OF DELAY AND PENALTY
The time allowed for carrying out the work as entered in the tender shall
be strictly observed by the contractor and shall be reckoned from the date
of which the order to commence work is given to the contractor. The work
shall throughout the stipulated period of the contract be proceeded with,
with all due diligence (time being deemed to be of the essence of the
contract on the part of the contract) and the contractor shall pay as
compensation and or penalty for delay. Further contractor shall to ensure
good progress during the execution of the work. The work shall be
completed stage wise as per the schedule given at the time of tender
submission (Refer qualification criteria) before award of the job to
contractor, and which will form the part of the contract, failing which
intermediate compensation shall be levied. In case contractor have not
submitted it is confirmation the schedule of work progress, on part of
contractor follow the schedule of work decided by VMC.
In the event of the contractor failing to comply with these conditions of
Contract is liable to be terminated at any stage and / or an amount equal to
one half(0.5%) percent of contract amount of whole work over stipulated
time limit shall be levied as a penalty for every week that the delay or
penalty provided always that the total amount of compensation to be paid
penalty provided always that the total amount of compensation to be paid
under the provision of this clause shall not exceed 10% of the contract
value of the work.
The decision of Add.City Engineer will be final for all such delay
CLAUSE 3 : ACTION WHEN WHOLE OF SECURITY DEPOSIT IS
In any case in which under any clause of this contract, the contractor shall
have rendered himself liable to pay compensation amounting to the whole
of his Security Deposit (Whether paid in one sum or deducted by
installment) or in the case of abandonment of the work owing to serious
illness or death of the contractor or any other cause, the Add.City Engineer
on behalf of VMC shall have power to adopt any of the following courses as
man, deemed best suited to the interest of VMC.
a) To rescinded the contract (of which recession notice in writing to the
contractor under the hand of the executive Engineer shall be
conclusive evidence) and in that case, the Security deposit of the
contractor shall stand forfeited and be absolutely at the disposal of the
b) To employ labour paid the VMC and to supply materials to carry out
the work, or any part of the works, debiting the contractor with the cost
of the labour and price of materials as to the correctness of which cost
and price the certificate of the Add. City Engineer shall be final and
conclusive against Contractor and crediting him with the value of the
work done, in all respect in the manner and at the same rate as if it
had been carried out by the contractor under the terms of this contract
and in that case the certificates of the Executive Engineer as to the
value of the work done shall be final and conclusive against the
c) To order that the work of the contractor be measured up and to take
such part thereof as shall be unexecuted out of his hands, and to give
it to another contractor to complete, in which case, any expenses
which may be incurred in excess of the sum which would have been
executed by him (as to the amount of which expenses the certificate in
writing of the Add. City Engineer shall be final and conclusive) shall be
borne and paid by the original contractor and shall be deducted from
any money due to him by the VMC under the contractor or otherwise
or from his security deposit or the proceeds of sale thereof, of a
sufficient part thereof. In the event of any of the above courses being
adopted by the Add. City Engineer the contractor shall have no claim
to compensation for any loss sustained by him by reason of his having
purchased, or prepared any materials, or entered into any
engagements, or made any advances on account of or with a view to
execution of the work or the performance of the contract. And in case
of the contract shall be rescinded under the provision aforesaid, the
contractor shall not be entitled to recover or be paid any sum, for any
work therefore actually performed by him under this contract unless
and until the Executive Engineer shall have certified in writing the
performance of such work and the amount payable to him in respect
thereof and he shall only be entitled to be paid the amount so certified.
CLAUSE 4 : ACTION WHEN THE PROGRESS OF ANY
PARTICULAR PORTION OF THE WORK IS
If the progress of any particular portion of the work is unsatisfactory
the Add. City Engineer / Executive Engineer shall, not withstanding
that the general progress of the work is satisfactory in accordance with
Clause 2, be entitled to take action under clause 3(b) after giving the
contractor 10 days notice in writing and the contractor shall have no
claim for compensation for any loss sustained by him owing to such
CLAUSE 5: CONTRACTOR REMAINS LIABLE TO PAY
COMPENSATION, IF ACTION NOT TAKEN UNDER
CLAUSE 3 POWER TO TAKE POSSESSION OF OR
REQUIRE OF OR SELL CONTRACTOR PLANT AND
In any case in which any of powers conferred upon the Add. City
Engineer by Clause 3 and 4 hereof shall have become exercisable
and the same not have been exercised, the non-exercise thereof and
such powers shall not constitute a waiver of any of the conditions
thereof and such powers shall not withstanding be exercisable in any
future case of default by the contractor for which by any clause or
clauses thereof he is declared liable to pay compensation amounting
to the whole of his security deposit and the liability of the contractor for
past and future compensation shall remain unaffected. In the event of
the Add. City Engineer taking action under sub clause (a) or (c) of
Clause 3, he may, if he so desires, take possessions of all or any
tools, plant, materials and stores in upon the works or the site thereof
of belonging to the contractor or procured by him and intended to be
used for the execution of the work or any part thereof paying or
allowing for the same in the account of the contract rates or in the
case of contract rates not beings applicable at current market rates, to
be certified by the Executive Engineer whose certificates thereof shall
be final. In the alternative the Add. City Engineer may be notice in
writing to the contractor of his works foreman or other authorized
agent require him to remove such tools plants, materials or stores
from his premises within a time to be specified in such notice and in
the event of the contractor failing to comply with any such requisition,
the Add. City Engineer may remove them at the contractor’s expense
or sell them by auction or private sale at the risk and cost of the
contractor in all respect, and the certificate of the Executive Engineer
as to the expense of any such removal, and the amount of the
proceeds and expenses of any such sale shall be final and conclusive
against the contractor.
CLAUSE 6: FINAL CERTIFICATE
On completion of the work the contractor shall be furnished with a
certificate by the Add. City Engineer of such completion but no such
certificate shall be given or considered to be complete until the
contractor shall have removed from the premises on which the work
shall have been executed all scaffolding, surplus materials and
rubbish and shall have cleaned off the dirt from all wood work, doors,
windows, walls, floor or other parts, etc.
CLAUSE 7 : PAYMENT ON INTERMEDIATE CERTIFICATE
[RUNNING ACCOUNT] TO BE REGARDED AS
No advances or payments shall be made for any work, estimated to
cost/less than rupees equal to 10% of contract value, till after the
whole work shall have been completed and a certificate of completion
is given. But in the case of works estimated to the cost more than
rupees 10% of the contract value the contractor shall on submitting a
monthly bill therefore, be entitled to receive payment proportionate to
the part of the work then approved and passed by the Executive
Engineer whose certificate of such approval and passing of the sum
so payable shall be final and conclusive against the contractor. All
such intermediate payment, shall be regarded as payments by way of
advance against the final payments only and not as payments, for
work actually done and completed, and shall not preclude the Add.City
Engineer / Executive Engineer from requiring bad, unsound, imperfect
or unskilled work to be removed and taken away and reconstructed or
re erected, nor shall any such payments be considered as an
admission of the due performance of the contract or any part thereof in
any respect or the accruing of any claim nor shall it conclude
determine or affect in any way the powers of the Add. City Engineer as
to the final settlement and adjustment of the accounts or otherwise, or
in any way the powers of the accounts or otherwise, or in any other
way very or affect the contract. The final bill shall be submitted by the
contractor within one month of the date fixed for the completion of the
work, otherwise the Executive Engineer’s certificate of the
measurement and of total amount payable for the work shall be final
measurement and of total amount payable for the work shall be final
and binding on all parties.
Rates of items paid in running bills are for the purpose of advance
payment only and may be revised [reduced or increased] in the final
bill after final evaluation of the quantity of each item.
LAUSE 8 : PAYMENT OF REDUCED RATES ON ACCOUNT OF
ITEMS OF WORKS NOT ACCEPTED AS COMPLETED
TO BE AT THE DISCRETION OF THE EXECUTIVE
The rates for several items of works estimated to cost more that Rs.
1,000/- agreed to within, shall be valid only when the item concerned
is accepted as having been completed fully in accordance with the
sanctioned specifications. In cases where the items of work are not
accepted as so completed the Executive Engineer may make
payments on account of such items at such reduced rates as he may
consider reasonable in the preparation of final or on account bills.
CLAUSE 9 : BILLS TO BE ON PRESCRIBED FORM
The contractor shall submit all bills on the prescribed forms. The
charges to be made in the bills shall always be entered at the rates
specified in the tender or in the case of any extra work ordered in
pursuance of these conditions, and not mentioned or provided for in
the tender, at the rates herein after proved for such work.
CLAUSE 10: WORKS TO BE EXECUTED IN ACCORDANCE WITH
SPECIFICATIONS, DRAWINGS, ORDERS, ETC.
The contract shall execute the whole and every part of the work in the
most substantial and workman like manner, and both as regards
materials and in every other respect in strict accordance with the
specifications. The contractor shall also confirm exactly full and
faithfully to the designs, and instructions in writing relating to work
signed by the Executive Engineer and lodge in his office and to which
the contractor shall be entitled to have access for the purpose of
inspection of such office or on the site of the work during the office
hours and the contractors shall if he so requires, be entitled at his own
expenses to make or cause to be made copies of the specifications
and of all such designs, drawings or instruction aforesaid.
CLAUSE 11 : ALTERATIONS IN SPECIFICATIONS AND DESIGNS
NOT TO BE INVALIDATE CONTRACTS. RATES FOR WOKS NOT
ENTERED OR SCHEDULE RATE.
The Add. City Engineer shall have power to make any alteration in or
addition to the original specifications, drawings and instructions that
may appear to him to be necessary or advisable during the progress
of the work and the contractor shall be bound to carry out the work in
accordance with any instruction in this connection which may be given
to him in writing signed by the Add. City Engineer / Executive Engineer
and such alteration shall not invalidate contract. Any additional work
which the contractor may be directed to do in the manner above
specified as part of the work shall be carried out by the contractor on
the same conditions in all respect on which he agreed to do the main
work, and at the same rates as are specified in the tender for the main
work. And if the additional and altered in the tender for the work, and
if the additional and altered work includes any class of works for which
no rate is specified in this contract, then such class of works shall be
carried out at the rates entered in the Scheduled Rates or at the
calculated rates whichever are lower. If the additional or altered work
for which no rate is entered in the Schedule of Rates in ordered to be
carried out before the rates are agreed upon then contractors shall
within seven days of the date of receipt by him of the order to carry out
the work, inform the Executive Engineer of the rate which he is
intention to charge for such class of work, and to arrange to carry out
in such manner as he may consider advisable provided always that if
the contractor shall commence work or incurred any expenditure in
regard there to before the rates shall have been determined as lastly
here in before mentioned then in such cases, he shall only be entitled
to be paid in respect of the work carried out or expenditure incurred by
him prior to such date of the determination of the rate as aforesaid
according to such rates as shall be fixed by the Executive Engineer, in
the event of a dispute, the decision of the Add. City Engineer will be
final. Where however, the work is to be executed according the
designs, drawings and specifications recommended by the contractor
and accepted by VMC, the alteration above referred shall be within the
scope of such design, drawings and specifications appended to the
tender. The time limit for completion of works shall be extended in the
proportion that the increase in cost occasioned by alterations or
additions bears to the cost of the original contract work, and the
certificate of the Executive Engineer as such proportion shall be
CLAUSE 12 : NO COMPENSATION FOR ALTERATION OR
RESTRICTION OF WORK.
If at any time after execution of the contract documents, the Add. City
Engineer shall, for any reason what so ever, require the whole or any
part of the work, as specified in the tender, to be stopped for any
period or shall not require the whole or part of the work to be carried
out at all or to be carried out by the contractor, he shall give notice in
writing of the fact to the contractor, who shall there upon suspend or
stop the work totally or partially, as the case may be. In any such
case, except as provided here under, the contractor shall have no
claim to any payment or compensation what so ever on account of any
profit or advantage which he might have derived from the execution of
the work in full but which he did not so derive in consequence of the
full amount of the work not having been carried out, or on account of
any loss that he may be put on account of materials purchased or
agreed to be purchased, or for unemployment of labour recruited by
him. He shall not have also any claim for compensation by reason of
any alteration having been made in the original specifications,
drawings, designs and instructions which may involve any curtailment
of the work as originally contemplated. Where however, materials
have already been purchased or agreed to be purchased by the
contractor before receipt by him of the said notice, the contractor shall
be paid for such materials at the rates determined by the Executive
Engineer provided they are not in excess of requirements and are of
approved quality and / or shall be compensated for the loss if any, that
he may be put to, in respect of materials agreed to be purchased by
him, the amount of such compensation to be determined by the
Executive Engineer whose decision shall be final. If the contractor
suffers any loss on account of his having to pay labour charges during
the period during which the stoppage of work has been ordered under
this clause, the contractor shall, on application be entitled to any
compensation on account of labour charge as the Executive Engineer,
whose decision shall be final may consider reasonable. Provided that
the contractor shall not be entitled to any compensation on account of
labour charges if, in the opinion of Executive Engineer, the labour
could have been employed by the contractor elsewhere for the whole
or part of the period during which the stoppage of the work has been
ordered as aforesaid.
CLAUSE 13 : NO CLAIM TO COMPENSATION ON ACCOUNT OF
LOSS DUE TO DELAY IN SUPPLY OF MATERIALS BY
The contractor shall not be entitled to claim any compensation from
the VMC for the loss suffered by him on account of delay by the VMC
in the supply of materials entered in the Schedule A, where such delay
1. Difficulties relating to the supply of Railway wagons
2. Force Majeure
4. Act of enemies of the State or any other reasonable cause
beyond the control of VMC.
CLAUSE 14 : ACTION AND COMPENSATION PAYABLE IN CASE OF
If at any time before the security deposit is refunded to the contractor,
it shall appear to the Add. City Engineer or his subordinate in charge
of the work that any work has been executed with unsound, imperfect
or unskilled workmanship or with materials of inferior quality, or that
any materials or articles provided by him for the execution of the work
are unsound or of a quality inferior to that contracted for, or are
otherwise not in accordance with the contract, it shall be lawful for the
Add. City Engineer to intimate this fact in writing to the contractor and
then not with standing the fact that the work materials or articles
complained of may have been inadvertently passed, certified and paid
for the contractor shall be bound forthwith to rectify or remove and
reconstruct the work so specified in whole of or in part as the case
may require, or if he is required, shall remove the material or articles
so specified and provided other proper and suitable materials or
articles at his own charge and cost; and in the event of his failing to do
so within a period to be specified by the Add. City Engineer in the
written intimation aforesaid the contractor shall be liable to pay
compensation at the rate of one per cent on the amount of the contract
sum for every day not exceeding ten days, during which the failure so
continues, and in the event of any such failure as aforesaid the Add.
City Engineer may rectify or remove and re-execute the work or
remove and replace the materials or articles as complained of as the
case may be at the risk and expense in all respect of the contractor. If
the Add. City Engineer consider that any such inferior work or
materials as described above may be accepted or made use of, it shall
be within his discretion to accept the same at such reduced rates as
he may fix here fore.
CLAUSE – 15: WORKS TO BE OPEN TO INSPECTION. CONTRACTOR
OR REASONABLE AGENT TO BE PRESENT.
All works under or in course of execution in pursuance of the contract
shall at all times be open to the inspection and supervision of the Add.
City Engineer and his subordinates and the contractor shall at all times
during the usual working hours and at all other times at which
reasonable notice of the intention of the Add. City Engineer or his
subordinate to visit the works shall have been given to included. In
the specification or other documents forming part of the contract
referred to in these conditions or not and which may be necessary for
the purpose of satisfying or complying with the requirements of the
Add. City Engineer as to any matter on which under these conditions
he is entitled to be satisfied or which he is entitles require together
with carriage, therefore, to and for the work.
The contractor shall also supply without charge the requisite number
of persons with the means and materials necessary for the purpose of
setting out works, and counting, weighing and assisting in the
measurement or examination at any time of the work or materials,
failing this the same may be provided by the Executive Engineer at the
expense of the contractor and the expense may be deducted from any
money due to the contractor under the contract or from his Security
Deposit. The contractor shall provide all necessary fencing and lights
required to protect the public from accident and shall also be bound to
bear the expense of defense of every suit, action or other legal
proceedings, at law, that may be brought by any person for injury
sustained owing to neglect of the above precautions, and to pay any
damages and costs which may be awarded in any such suit, action or
proceedings to any such persons or which may be with the consent of
the contractor be paid in compromising any claim by any such person.
CLAUSE 16 : SCAFFOLDING, ETC. The contractor shall provide suitable
scaffolds and working platforms, gangways and stairways and shall comply
with the following regulations in connection there with :
(a) Suitable scaffolds shall be provided for workman for all works
that can not be safely done from a ladder or by other means.
(b) A Scaffolds shall not be constructed, taken down, or
substantially altered except
(I) Under the supervision by competent and responsible
(II) As far as possible by competent workers possessing
adequate experience in this kind of work
(c) All scaffolds and appliances connected there with and all
(I) be of sound material
(II) be of adequate strength having regard to the loads and
strains to which they will be subjected and
(III) be maintained in proper condition.
(d) Scaffolds shall be so constructed that no part thereof can be
displaced in consequence of normal use.
(e) Scaffolds shall not be overloaded and so far as practicable the
load shall be evenly distributed.
(f) Before installing lifting gear on scaffolds special precautions
shall be taken to ensure the strength and ability of the scaffolds.
(g) Scaffolds shall be periodically inspected by a competent person.
(h) Before allowing a scaffold to be used by his workman the
contractor shall, whether the scaffolds has been erected by his
workman or not take steps to ensure that it complies fully with
the regulations herein specified.
(i) Working platforms, gangways and stairways shall
(I) be so constructed that no part thereof can sag unduly or
(II) be so constructed and maintained, having regard to the
prevailing conditions as to reduce as far as practicable
risk of persons tripping or slipping.
(III) Be kept free from any unnecessary obstructions.
(j) In the case of working platforms, gangways, working places and
stairways at a height exceeding 5 meters.
(I) Every working platform and every gangway shall be
closely boarded unless adequate measure are taken to
(II) Every working platform and gangway, shall have
adequate width and
(III) Every working platform, gangway, working place and
stairway shall suitably fenced.
(k) Every opening in the floor of a building or a working platform
shall, except for the time and to the extent required to allow the
access of persons or the transport or shifting of material be
provided with suitable means to prevent the fall of persons or
(l) When persons are employed on a roof where there is a danger
of falling from a height exceeding 4 meters, suitable precautions
shall be taken to prevent the fall of persons or material.
(m) Suitable precautions shall be taken to prevent being struck by
articles which might fall from scaffolds or other working places.
(n) Safe means of access shall be provided to all working platforms
and other working places.
(b) SHORING AND STRUTTING IN CASE OF EXCAVATION
All type of shoring and strutting, wherever necessary shall be
adopted to withhold the face of earth, so as to avoid the danger
of sides to collapse as per the site requirements and directed by
Executive Engineer.
CLAUSE 17 : HOISTING APPLIANCES ETC.
The contractor shall comply with the following regulations as regards
the Hoisting Appliances to be used by him :
a. Hoisting machines and tackle : including their attachments,
anchorages and supports, shall
(I) be of good mechanical construction, sound material and
adequate strength and free patent defect; and
(II) be kept in good repair and in good working order.
b. Every rope used in hoisting or lowering materials or as a means
or suspension shall be of suitable quality and adequate strength
and free from patent defect.
c. Hoisting machines and tackle shall be examined and adequately
tested after erection on the site and be reexamined in position at
intervals to be prescribed by VMC.
d. Every chain, ring, hook, shackle, swing and pulley block used in
hoisting or lowering materials or as means of suspension shall
be periodically examined.
e. Every crane driver or hoisting appliance operator shall be
properly qualified.
f. No person who is below the age of 20 years shall be in control of
any hoisting machine including any winch or give signals to the
g. In the case of every hoisting machine and of every chain, ring,
hook, shackle, swivel and pulley used in hoisting or lowering or
as a means of suspension the safe working load shall be
ascertained by adequate means.
h. Every hoisting machine and all gear referred to in the preceding
regulation be plainly marked with the safe working load.
i. In the case of hoisting machine having a variable safe working
load each safe working load and the conditions under which it is
applicable shall be clearly indicated.
j. No part of any hoisting machine or any gear referred to in
regulation above shall be loaded beyond the safe working load
except of the purpose of testing.
k. Motors, gearings, transmissions, electric wiring and other
dangerous parts of hoisting appliances shall be provided with
efficient safeguards.
l. Hoisting appliances shall be provided with such means as will
reduce to a minimum the risk of the accident descent of the load.
m. Adequate precautions shall be taken to reduce to a minimum risk
of any part of a suspended load becoming accidentally
CLAUSE 18 : MEASURES FOR PREVENTION OF FIRE
The Contractors shall not set fire to any standing jungle, trees
brushwood or grass without a written permit from the Add. City
Engineer . When such permit is given and also in all cases when
destroying out of a dug up trees, brushwood, grass etc. by fire, the
contractor shall take necessary measures to prevent such fire
spreading to or otherwise damaging surrounding property.
CLAUSE 19 : LIABILITY OF CONTRACTOR FOR ANY DAMAGE
DONE IN OR OUTSIDE WORK AREA
Compensation for all damage done intentionally or unintentionally by
contractor’s laborer whether in or beyond the limits of the work site
including any damages caused by the spreading of Fire mentioned in
clause 18 shall be estimated by the Executive Engineer or such other
officer as the VMC may appoint and the estimates of the VMC shall be
final and the contractor shall have to pay the amount of the assessed
compensation on demand failing which the same will be recovered
from the contractor as damages in the manner prescribed in clause
By the Add. City Engineer from any sums that may be due to or
become due from the VMC to the contractor under this contract or
otherwise. The contractor shall bear the expenses of defending any
action or other legal proceedings that may be brought by any person
for injury sustained by him owing to neglect of precautions to prevent
the spread of Fire and shall be also pay any damage and cost that
may be the court in consequence. However in any case VMC can not
be suit under any circumstances.
CLAUSE 20 : WORKS NOT TO BE SUBLET
The contractor shall not be assigned or subleted without approval of
the Add. City Engineer and if the contractor shall assign or sublet his
contract or attempt to do so or become insolvent or commence any
proceedings to the adjudicated an insolvent or make any
compensation with his creditors or attempt to do so, the Add. City
Engineer may by notice in writing, rescind the contract. Also if any
bribe, gratuity, gift, loan, prerequisite reward or advantage pecuniary
or otherwise shall either directly or indirectly be given, promised or
offered by the contractor or any of his servants or agents to any public
officer or person in the employment of or authorized by the VMC in
any way relating to his office or employment, if any such officer or
person shall become in any directly or indirectly interested in the
contract, the VMC may, by notice in writing rescind the contract.
In the event of a contract being rescinded, the Security Deposit of the
contractor shall thereupon stand forfeited and be absolutely at, the
disposal of the VMC and the same consequence shall ensure as if the
contract had been rescinded under clause 3 hereof and in addition the
contractor shall not be entitled to recover or be paid for any work
therefore actually performed under the contract.
CLAUSE 21: SUM PAYABLE BY WAY OF COMPENSATION TO BE
CONSIDERED AS REASONABLE COMPENSATION
WITHOUT REFERENCE TO ACTUAL LOSS.
All sums payable by contractor by way of compensation under any of
these conditions shall be considered as reasonable compensation on
be applied to the use of the VMC without any reference to be actual
loss or damage sustained and whether any damages had not been
CLAUSE 22 : EXECUTION OF WORKS
All works to be executed under the direction and subject to the
approval in all respect of the Executive Engineer for the time being,
who shall be entitled to direct at what point or points and in what
manner they are to be commenced and from time to time carried on.
CLAUSE 23 : DECISION OF THE VMC TO BE FINAL
Except where otherwise specified in the contract and subject to the
powers delegated to the Engineer-in-charge by the VMC, the decision
of the Add. City Engineer for the time being shall be final conclusive
and binding on all parties to the contract upon all question relating to
the meaning of the specifications, designs, drawings and instruction
herein before mentioned and as to the quality of workmanship or
material used on the work or as to any other question, claim, right,
matter or thing whatsoever, in anyway arising out of or relating to the
contract designs, drawings, specifications estimates, instructions,
orders or these conditions or otherwise concerning the works or the
execution of failure to execute the same, whether arising during the
progress of the work or after completion of abandonment thereof.
CLAUSE 24 : WORK ON SUNDAY
No work shall be done on Sunday or Holiday without written
permission of Executive Engineer.
CLAUSE 25 : LUMP SUMS IN TENDER
When the estimate on which a tender is made includes lump sums in
respect of parts of the work, the contractor shall be entitled to payment
in respect of the items of work involved or the part of the work in
question is not in the opinion of the Executive Engineer capable of
measurement, the Executive Engineer may at his discretion pay the
lump sum amount entered in the contract and the certificate in writing
of the Executive Engineer shall be final and conclusive against the
contract with regard to any sum or sums payable to him under the
provisions of this clause.
CLAUSE 26 : ACTION WHERE NO SPECIFICATIONS ARE
In the case of work for which there is no such specification, work shall
be carried out in accordance with the P.W.D. or I.S.I. specifications
and in the event of there being no P.W.D. or I.S.I. specifications the
work shall be carried out in all respects in accordance with the
instructions and requirements of the Executive Engineer.
CLAUSE 27 : DEFINITION OF WORK
The expressions “Work” or “Works” whenever used in these conditions
shall unless, there be something in the subject or context repugnant to
such construction be constructed to mean the work or the works
contracted to the executed under or by virtue of the contract, where
temporary or permanent and whether original altered substituted or
CLAUE 28 : QUERRY FEES AND ROYALTIES, ETC.
All query fee, royalties, octroi dues and ground rent for stacking
materials, if any should be paid by the contractor.
CLAUSE 29 {A}: ACCIDENT OR INJURY TO WORKMAN
1. The contractor to Indemnify the VMC :
The VMC shall not be liable for or in respect of any damages or
compensation payable by law in respect or in consequence of
any accident of injury to any workman or other person in the
employment of the contractor or his any sub-contractor and
contractor shall indemnify the VMC against such damages and
compensation and against all claims, demands, proceedings,
costs, charges, expenses whatsoever in respect thereof or in
relation thereto.
2. Payments of Claims and Damages :
VMC have to pay any money in respect of such claims or
demands as aforesaid the amount so paid and the costs incurred
by the VMC shall be charged to and paid by the contractor and
the contractor shall not be at liberty to dispute or question the
right of the VMC to make such payments not with standing the
same may have been made without his consent or authority or in
law or otherwise to the contrary.
CLAUSE 29 {B} COMPENSATION UNDER WORKMAN’S
COMPENSATION ACT.
The contractor shall be responsible for and shall pay any
compensation to his workers payable under the Workman’s
compensation Act 1923, VII of 1923. herein after called the said
Act for injuries caused to the workers. If such compensation is
paid by the VMC as principle under sub – section (I) of section
12 of the said Act on behalf of the contractor, it shall be
recoverable by the VMC from the contractor under sub – section
(2) of the section. Such compensation shall be recovered in the
manner laid down in the Clause I above.
CLAUSE 30 : MEDICAL AID TO LABOUR
The contractor shall be responsible for and shall pay the
expenses of providing medical aid to any workman who may
suffer a bodily injury as a result of an accident. If such expenses
are incurred by the VMC the same shall be recoverable from the
contractor forthwith and be deducted without prejudiced to any
other remedy of the VMC from any amount due or that may
become due to the contractor.
CLAUSE 31 : SAFETY MEASURES
The contractor shall provide all necessary personal safety equipment
and first aid apparatus available for the use of the persons employed
on the site, shall maintain the following regulations in connection
a. The workers shall be required to use the equipment so provided by
the contractor and the contractor shall take adequate steps to
ensure proper use of the equipment by those concerned.
b. When work is carried on in proximity to any place where there is a
risk of drawing all necessary equipment shall be provided and kept
ready for use and all necessary steps shall be taken for the prompt
rescue of any person in danger.
c. Adequate provision shall be made for prompt first aid treatment of
all injuries likely to be sustained during the course of the work.
CLAUSE 32 : CLAIM FOR QUANTITIES OF WORK ENTERED IN THE
Quantity shown in the tender are approximate and no claim shall be
entertained for quantity of work executed being either more or less
than those entered in the tender or estimate.
CLAUSE 33 : NO CLAIM FOR COMPENSATION FOR DELAY IN
STARTING THE WORK
No compensation shall be allowed for any delay caused in the starting
of the work on account of any problem related to acquisition of land
delay in administrative clearance of work. And for any delay in
according sanction to estimates.
CLAUSE 34 : CLAIM FOR COMPENSATION FOR DELAYING THE
EXECUTION OF WORK
No compensation shall be allowed for any delay in execution of the
work on account of water standing in borrow pits or compartments.
The rates ate inclusive for hard or cracked soil excavation in mud sub-
soil water, or water standing in borrow pits and no claim for an extra
rate shall be entertained unless otherwise specified.
CLAUSE 35 : ENTERING UPON OR COMMENCING ANY PORTION OF
The contractor shall not enter upon or commence any portion of work
except with the written authority and instruction of the Executive
Engineer or of his sub ordinate in charge of the work. Failing such
authority the contractor shall have no claim to ask measurements or
payment for work.
CLAUSE 36 : LABOUR LAWS AND SAFETY REGULATIONS
i. No contractors shall employ any person who is under the age of
ii. No contractor shall employ donkeys or other animals with breaching of
string or thin rope. The breaching must be at least three inches wide
and should be of tape (Nawar).
iii. No animal suffering from sores, lameness or emaciation or which
immature shall be employed on the work.
iv. The Executive Engineer or his agent is authorized to remove any
person or animal found working which does not satisfy those
conditions and no responsibility shall be accepted by the VMC for any
delay caused in the completion of the work by such removal.
iv. The contractor shall pay fair and reasonable wages to the workmen
employed by him in the contract undertaken by him. In the event of
any dispute arising between the contractor and his workmen on the
grounds that the wages paid are not fair and reasonable the dispute
shall be referred without delay to the Executive Engineer, who shall
decide the same. The decision of the Executive Engineer shall be
conclusive and binding on the contractor, but such decision shall not in
any way affect the condition in the contract regarding the payment to
be made by the VMC at the sanctioned tender rates.
CLAUSE 37 : ACCEPTANCE OF CONDITIONS BEFORE TENDERING
Any contractor who does not accept these conditions shall not be
allowed to tender for works.
CLAUSE 38 : ACTS FOR CONTROLLED PRICE
The price quoted by the contractor shall not in any case exceed the
control price if any fixed by government or reasonable price. Which it
is permissible for him to charge a private purchase for the same class
and description of goods under the provisions of Hoarding or
Profiteering prevention ordinance 1943 as amended from time to time
if the price quoted exceed the controlled price permissible under
Hoarding and profiteering prevention ordinance the contractor shall
specifically mention this fact in his tender along with the reasons for
quoting such higher price. The purchase at his discretion will in such
case exercise the right of revising the price at any stage so as to
confirm with the controlled price of the permissible under the Hoarding
and Profiteering Prevention ordinance. This discretion will be exercise
with out prejudice to any other action that may be taken against the
contractor. This condition applies to all rules or act for controlled
CLAUSE 39 : Taxes, Duties, Octroi, etc.
The rates to be quoted by the contractor must be inclusive of
excise, sales tax and all other taxes, octroi ,Vat, etc, present &
future taxes be included but excluding GST. No extra payments
on this account will be made to the contractor. The contractor
has to quote the rates without GST( 18% prevailing GST rate is
considered). If the government might increase or decrease GST
rates ( i.e..18% or <18%) then recovery or reimburse effect will
applicable on prevailing tenure
CLAUSE 40 : Defect Liability Period
The defect liability period shall be 12 calendar months from the date
of final completion and acceptance of work by VMC. Contractor shall
submit performance guarantee {only for labor work} bond of 5%
amount of total work for period of One Years in prescribed format by
VMC. The bank guarantee of Nationalized bank shall be given for full
defect liability period at a time. During defect liability period,
contractor shall make good any defect whatsoever nature observed in
different works equipment, or in part of plant or equipment by
modifying/replacing/repairing of such defective units or parts there at
his own cost within a period of ten days on hearing from owner about
such defect during liability period. In case if contractor’s failure to do
so, it will be got done by owner and entire cost shall be recovered from
contractor’s performance guarantee bond in the form of bank
guarantee or other dues with the company
CLAUSE 41 : ERRORS AND OMMISSIONS
The contractor should take no advantage of any apparent error or
omission in drawings or specifications and the Add. City Engineer
should be permitted to make such corrections and interpretations as
necessary to fulfill the intent of the plans and specifications.
Alterations, omissions or correction in the drawings, diagrams or
sketches or specifications shall not constitute a case for a claim of
extra payment or extension of time by the contractor.
CLAUSE 42: INSURANCE AGAINST ACCIDENT ETC. TO WORKMEN
The contractor shall at his own expense carry and maintain insurance
with reputable Insurance Companies to his satisfaction but in no case
VMC will be responsible for any claim arise due to inadequate amount
and or improper provisions of insurance by the contractor under the
employees State Insurance Act, 1949. Workmen’s compensation and
Employer’s liability insurance, Contractor’s protective liability
insurance and any other insurance required under law or regulations
from time to time for this contract.
CLAUSE 43 : ADDITIONAL SAFETY CODE
The contractor shall provide all necessary safety provisions as
indicated in safety code given along with this tender.
CLAUSE 44 : FOSSILS ETC.
All fossils, coins, articles or value of antiquity and structure and other
remains or things of geological or archeological interest discovered on
the site shall as between the VMC and the contractor be deemed to be
absolute property of the VMC.
CLAUSE 45 : PROGRAMME
The time allowed for execution of works shall be the essence of the
contract. The contract period shall commence from date of notice of
intimation to proceed. The tenderer at the time of submitting his
tender shall indicate to the construction schedule his program of
execution of work commensurate with the total time specified. The
contractor shall provide the Engineer-in-charge a detailed program of
the time schedule for execution of the works in accordance with the
specifications and the completion date, the entire program to be
finalized by the contractor, has to confirm the execution period
mentioned along with the bill of quantities in the tender documents.
The Engineer-in-charge upon scrutiny of such submitted program by
contractor, shall examine suitability of it to the requirement of contract
and suggest modifications, if found necessary.
CLAUSE 46 : ALTERATION IN SPECIFICATION AND DESIGN AND
A) The Engineer-in-charge shall have power to make any alteration
in, omission from, addition to, substitution for, the schedule of rates,
the original specifications, drawings, designs and instructions that may
appear to him to be necessary or advisable during the progress of
work and the contractor shall be bound to carry out such
altered/extra/new items of work in accordance with any instructions
which may be given to him in writing signed by Engineer-in-charge
and such alteration omission, additions or substitution shall not
invalidate contract and any altered, addition or substituted work shall
be carried out by the contractor on the same conditions of contract.
The time for completion may be extended by Engineer-in-charge as
may be considered just and reasonable by him. The rates for such
addition, altered or substituted work shall be worked out as under
a) If the rates for addition, altered or substituted work are specified in the
contract for work, the contractor is bound to carry out such work at the
same rates as specified in the contract.
b) If the rates for additional, altered or substituted work are not
specifically provided in the contract for the work, the rates will be
derived from the rates of similar items or works in the contract of work.
The opinion of Engineer-in-charge as to whether the rates can be
reasonably so derived from the item of contract will be final and
binding to the contractor.
c) If the rates of altered, addition or substituted work can not be
determined as specified in (a) or (b) above, the rates shall be paid as
per S.O.R. of VMC/GWSSB/PWD in the same of order preference. In
absence of S.O.R., rate analysis approved by the Add. City Engineer
shall be final.
d) If the rates of altered, addition or substituted work can not be
determined as specified in (a) or (b) or (c) above, the contractor shall
within seven days of the receipt of order to carry out the work inform
the Engineer-in-charge of the rate which he intends to charge for such
work supported by rate analysis and the Engineer-in-charge will
determine the rate on the basis of prevailing market rates of materials,
labour cost at schedule of labour plus 15% thereon as contractor’s
supervision overhead and profits. The opinion of Engineer-in-charge
as to market rate of materials and the quantity of labour involved per
unit of measurement will be final and binding on contractor. But
under no circumstances, the contractor suspends work on the plea of
non settlement of items falling under this clause.
CLAUSE 47 : TESTS FOR QUALITY OF WORK
1. The contractor shall be required to give satisfactory hydraulic test
wherever required and shall rectify the defects, if any free of cost. The
necessary water, power, labour etc. required for the hydraulic test
shall also be arranged by the contractor at his own cost.
2. All workmanship shall be of the best kind described in the contract
documents and in accordance with the instructions of Engineer-in-
charge and shall be subjected from time to time to such tests at
contractor cost as the Engineer-in-charge may direct at the place of
manufacture or fabrication or on the site or at any such place.
Contractor shall provide assistance, instruments, labour and materials
as are normally required for examining, measuring and testing of any
work or workmanship as may be selected and required by Engineer-
3. All tests necessary in connection with the execution of work as
decided by Engineer-in-charge shall be carried out at an approval
laboratory at contractor’s cost.
4. Contractor shall furnish the Engineer-in-charge for approval when
requested or if required by the specification, adequate samples of all
materials and furnished goods to be used in work sufficiently in
advance to permit tests and examination thereof. All materials
furnished and finished goods applied in work shall be exactly as per
approved samples.
Pl add one comment in all Tenders General Specifications
Must include this clause in all tender documents
1. All Tools, Equipments, Parts, Machinery, matrials, items should have IS
standard, Without IS standard products shall be prohibited for
purchase & use on site.
2. After purchasing or during execution of work If EIC willing to test sample
of materials, products, tools & machinery etc, according to BIS codes
then Bidder shall make arrangements for the same.
3. If any sample of any products fail in BIS standard code so bidder should
have stop the work & removes all failed materials from site within
days & keep new IS standard items on site according to vender list.
CLAUSE 48 : PROCEDURE FOR MEASUREMENT OF WORK IN
1. All measurements shall be in metric system. All the work in progress
will be jointly measured by the representative of Engineer-in-charge
and contractor’s authorized agent. Such arrangements will be got
recorder in the measurements book by the Engineer-in-charge or his
authorized representative and signed by the contractor or his
authorized representative and signed by the contractor or his
authorized agent in token of acceptance. If the contractor or his
authorized agent fails to be present whenever required by the
Engineer-in-charge for taking measurements for any reasons
whatsoever, the measurement will be taken by the Engineer-in-charge
or his authorized representative not withstanding the absence of
contractor and these measurements will be deemed to be correct and
binding on the contractor.
2. Contractor will submit a bill in approved proforma in duplicate to the
Engineer-in-charge of the work giving abstract and detail
measurements of various items executed during a months as mutually
agreed. The Engineer-in-charge shall verify the bill and the claim, as
far as admissible.
3. Payment Condition :- The payment of work through running
account bills for the work done. The full deductions being made when
the items of work in which they are used are billed when the mode of
measurement is not covered by contractor for any item of work it shall
be as per the prevailing practice of CPWD manual
4. CLAUSE 49 : TAXES, DUTIES, OCTROI ETC.
a. Contractor agrees to and does hereby accept full and exclusive
liability for the payment of any and all taxes including sales-tax, duties,
octroi, vat or entry tax etc. not or herein after imposed, increased or
modified from time to time in respect of work and materials and all
contributions and taxes for unemployment, compensation, insurance
and old age pension or annuities now or hereinafter imposed by the
central or State Government authorities with respect to or covered by
the wages, salaries or other compensation paid to the persons
employed by contractor.
b. Contractor shall be responsible for compliance with all obligations and
restrictions imposed by the labour law or any other law affecting
employed-employee relationship.
3. Contractor further agree to comply and to secure the compliance of all
sub-contractor with applicable central, state, municipal and local laws
and regulations and requirement. Contractor also agrees to depend
indemnify and hold harmless the owner from any liability or penalty
which may be imposed by central, state or local authority by reasons
any violation by contractor or subcontractor of such laws, regulations
or requirements and also from all claims, suits or proceedings that
may be brought against owner arising under growing out of or by
reasons of work provided for by this contract by third parties or by
central or State Government authority or any administrative sub-
division thereof.
4. At present there is no sales tax on work contract. Even if at later
stage same is imposed by Govt. the sales tax on work contract shall
be borne by contractor.
5. The contractor shall pay octroi as per the rate decided by octroi
department of VMC.
6. The contractor shall pay all taxes like sales, income tax, VAT, Service
tax or any other tax which are in force time to time. VMC may not be
any way hold responsible for any such taxes. However VMC can ask
to produce the tax payment on the request from detail concern
departments of Govt. or VMC.
(A) In respect of all labour, directly or indirectly employed in the work for
the performance of contractor’s part of this agreement, the contractor
shall at his own expense arrange for all the safety provision as per
safety code of IRC:SP:55 (Latest:2014) ,C.P.W.D. and hand book on
construction safety practice SP-70-2001 and building & other
construction workers
(Regulation of Employment & Condition of Services) Act 1996. The
contractor shall serve and abide by all fire and Newly Implemented
safety security rules and regulations of the VMC.
(B) First Aid and Injuries
1. Contractor shall maintain first aid facilities to his employees and those
of his sub-contractors.
2. Contractor shall make outside arrangement for ambulance service and
for the treatment of injuries. Names of those providing these services
shall be furnished to VMC prior to start of construction and their
telephone numbers shall be prominently displayed in contractor’s field
3. All critical injuries shall be reported promptly to VMC and copy of
contractors report covering each personal injury requiring the attention
of a physician shall be furnished to VMC.
( C ) Contractor’s Barricades
1. Contractor shall erect and maintain barricades required in connection
with his operation to guard or protect.
b) Hoisting Areas
c) Areas adjudged hazardous by contractor’s or VMC’s inspectors.
1. VMC’s existing property subjected to damage by
contractor’s operations.
2. Rail road unloading spot.
3. Contractor’s employees and those of his sub-contractors shall
become acquainted with VMC’s barricading practice and shall
respect the provisions thereof.
5. Barricades and hazardous areas adjacent to but not located in
normal routes of travel shall be marked by red lanterns.
6. Contractor shall have to make all the arrangement to cover and
protect the equipments and panels stored at work site or installed
and which are likely to be damaged due to this work.
The contractor shall provide suitable scaffolds and working platforms,
gangways and stairways as per the conditions laid down in clause no.
16(a) of the general conditions of the contract.
(e) Excavation and Trenching
1. All trenches 1.25 m or more in depth, shall at all times be supplied with
at least one ladder for each 30 m length or fraction thereof. The
ladder shall be extended from the bottom of the trench to at least
meter above the surface of the ground. The side of the trench which
are 1.5 meter or more in depth shall be stepped back to give suitable
slope, or securely held by timer bracing, so as to avoid the danger of
sides to collapse.
2. The trenches which are 1.5 meters or more in depth shall be provided
with necessary shoring and strutting or timber bracing, so as avoid the
danger of sides to collapse and to withhold the face of earth.
3. The excavated material shall not be placed within 1.5 meter of the
edge of the trench or half of the trench whichever is more.
4. Cutting shall be done from top to bottom. Under no circumstances
undermining or undercutting be done.
Before any demolition work is commenced also during the process of
1. All roads and open areas adjacent to the work site shall either be
closed or suitably protected.
2. No roads cable or apparatus which is liable to be a source of danger
over a cable or apparatus used by the operator shall remain
electrically charged.
3. All practical steps shall be taken to prevent danger to persons
employed from risk of fire or explosion or flooding. No floor, roof or
other part of the building shall be so overloaded with debris or
materials as to render it unsafe.
All necessary personal safety equipments as considered adequate by
the Executive Engineer should be kept available for the use of persons
employed on the site and maintained in a condition suitable for
immediate use and the contractor should take adequate steps to
ensure proper use of equipment by those concerned as per the clause
(30) of General Conditions of the Contract. To ensure effectively
enforcement of the rules and regulations relating to safety precautions,
the arrangements made by the contractor shall be opened to
inspection by the welfare officer, Safety Engineer or Executive
Engineer of the VMC or their representatives.
4. No roads cable or apparatus which is liable to be a source of danger
over a cable or apparatus used by the operator shall remain
electrically charged.
5. All practical steps shall be taken to prevent danger to persons
employed from risk of fire or explosion or flooding. No floor, roof or
other part of the building shall be so overloaded with debris or
materials as to render it unsafe.
All necessary personal safety equipments as considered adequate by
the Executive Engineer should be kept available for the use of persons
employed on the site and maintained in a condition suitable for
immediate use and the contractor should take adequate steps to
ensure proper use of equipment by those concerned as per the clause
(30) of General Conditions of the Contract. To ensure effectively
enforcement of the rules and regulations relating to safety precautions,
the arrangements made by the contractor shall be opened to
inspection by the welfare officer, Safety Engineer or Executive
Engineer of the VMC or their representative
Special Conditions
VADODARA MUNICIPAL CORPORATION
SPECIAL CONDITIONS OF CONTRACT
(A) Special conditions of contract shall be read in conjunction with
General Conditions of Contract Material and job Specifications,
Drawings and other documents forming part of this contract.
(B) Now withstanding the sub-division of the documents into the separate
sections and volumes every part of each shall be deemed to be
supplementary to the complementary of every other part and shall be
read and into the contract so far as it may be practicable to do so.
1. All the materials required for the contract should be brought and
well preserved well in advance. Samples of the same should be
shown and got approved in the very beginning. As soon as
material are brought they should be examined, if material is not
as per specifications it should be removed from site.
2. EXTRA ITEMS : This specified in clause no. (14) of General
Conditions of Contract :
No extra items be paid within the present scope of work with
drawings or details,. If however, the tenderer feels that there is
any extra item, he may write in his forwarding letter each item, its
quantities and cost. For the purpose of comparison and
evaluation, this will be considered and award of work may be
made or not made considering these. Later on if any change is
required by the VMC before executing the items, a claim be
made by the contractor pointing out the exact extra item as
desired by them, total quantity and amount. This item be
executed only after written sanction of the VMC, if the contractor
still claims it as extra item in absence of any such written claims
before execution of that item or if such claim is rejected, it will be
deemed to be contained in regular items of tender and not an
extra one. Rate of extra item, if any, will be settled on the basis
of rates tendered by the contractor and VMC schedule of rates.
Rate analysis will be prepared and after inquiry of labour and
materials, the rate shall be decided. This calculated rate will be
arrived after due rate analysis by considering market rates of the
labour and material with contractor’s profit added to such cost
thus arrived at Contractor shall have to produce vouchers to
support the rate analysis.
3. Every tender should be accompanied with a time schedule of
progress of work at various stages. In case these stages are not
followed up, actions as stated in the contract will have to be
taken to bring the progress of work as scheduled.
4. The tendered shall have to work as per the time schedule
enclosed in the tender. The progress of work will be required
every month against target set in time schedule. If it is found
inadequate or falling behind, contract shall take all the necessary
actions as suggested by the “Executive Engineer” to accelerate
the speed of work and again back the lost time. In case of
contractor not complying suggestions and instructions of
Executive Engineer to speed up the work, the VMC will have a
right to take action as per General Conditions of Contract Clause
5. SUB-LETTING:
(1) No sub-letting of work
i) No part of the contract nor any share of interest there in shall in
any manner or degree be transferred, assigned or sub-let by the
contract directly or indirectly to any person, firm or corporation
whomsoever except as provided for in the succeeding sub-
clause without the consent in writing of the Add. City Engineer .
ii) Sub-contract for Temporary Works Etc.
The Add. City Engineer may give written consent to sub-contract
for the execution of any part of the works at the site, being
entered into by the contractor provided each individual sub
contract is submitted to the Add. City Engineer or his
subordinates before being entered into and approved by him.
iii) List of sub-contractors to be supplied::
At the commencement of every month the contractor shall supply
to the Executive Engineer list of sub-contractors or other persons
or firms engaged by the contractor and working at the site during
the previous month with particulars of the general nature of the
sub-contracts of works.
iv) Contractor’s Liability not Limited by Sub- Contractors :
Not withstanding any sub-letting with such approval as aforesaid
and not withstanding that the Executive Engineer shall have
received copies of any sub-contracts, the contractor shall be and
shall remain solely responsible for the quality and proper and
expeditious execution of the works and the performance of all the
conditions of the contract in all respect as if such sub-letting had
not taken place and as if such work had been done directly by
the contractor.
v) VMC may terminate sub-contracts :
If any sub-contractor engaged upon the works at the site
executes any work which in the opinion of the Executive
Engineer is not in accordance with the contract documents, the
VMC may be written notice to the contractor require him to
terminate such sub-contract and the contractor upon the receipt
of such notice shall terminate such sub-contract and dismiss the
sub-contractors sub the letters shall forthwith leave the works.,
failing which the VMC shall have the right to remove such sub-
contractors from the site.
vi) No remedy for action taken under this clause :
No action taken by the VMC under the clause shall receive the
contractor or any of his liabilities under the contractor or give rise
to any right to compensation, extension of time or otherwise,
failing which the owner shall have the right to remove such sub-
contactors from the site.
6. Inconvenience to the Public :
The contractor shall not deposit materials on any site which will
cause seriously inconvenience to the public. The Executive
Engineer may require the contractor to remove any material
which are considered by him to be a danger or inconvenience to
the public or cause them to be removed at the Contractor’s cost.
7. Approach Roads :
Contractors will be permitted to use the existing roads in the
areas for the purpose of transporting labourers and materials etc.
The VMC, however, will not undertake to provide any approach
road to the site of works. It shall be entirely the responsibility of
the contractor to provide and maintain such temporary roads at
his own cost for the purpose of movement of men, materials, and
equipment. Layout of such approach roads shall be submitted to
the Executive Engineer for his approval before undertaking the
construction of the same.
8. Supply of Materials :
The contractor is required to keep himself in touch with the
Executive Engineer for the day-to-day position of supply of
materials to be supplied by owner, so as to adjust the program of
work accordingly in advance to avoid his labour remaining idle on
account of non-receipt of materials. No claim of extra payment
due to or arising form delay in supplying the materials by the
Owner shall be entertained, but a reasonable extension of period
of contractor may be considered if found justified. This is
specified in clause no. (14) of General Conditions.
9. Water Supply to Contractors:
The contractors shall make his own arrangement of water
required for construction, site office and labour camp. Contractor
shall make arrangement for receiving, storage and distribution of
water as per established norms and practice. VMC shall not
entertain any claim of contractor for delays resulting on account
of inadequate or irregular water supply.
Certified plumbers should be employed by the contractor on the
work for all the temporary sanitary and plumbing works.
10. Contractors Stores and Site Office :
Suitable area near the site of work shall be allocated free of rent
to the contractor for storing his equipment plant, materials, etc.
and for his site office. If suitable site near site of work is not
available, the contractor should prepare its site office away from
the site of the work as per the direction of the Executive
11. Rates to Include Everything :
The rates quoted in the tender should include all charges for
hired, if necessary, of any tools, and plant, temporary plumbing,
water connection, maintenance of sanitary and water connection,
supply of water, cost of cisterns, overhead storage tanks, sheds
for materials, his labour and plant office and staff, charges for
getting electric connections and maintaining the same, clearing
the site, watering rolling etc. as specified. The rates shall be
inclusive of octroi duty and any other duties and / or levied, by
the Government or public body or body corporate.
12. Supply of Plant and Equipment Materials and Labour
The contractor shall make his own arrangements to produce all
construction plant and equipment for his work. He shall also
forward along with tender a list of type and number of the
equipment with their capacities in good working condition which
he will use at site to ensure completion of the work in specified
All materials, construction plants and equipments, etc. once
brought by the contractor on the site are not to be removed from
there without the written authority from the Executive Engineer.
Also, the contractor shall have adequate stock of spare parts for
the equipment on the site and work shall not be delayed on this
account. Similarly all enabling work built by the contractor for the
main construction undertaken by him are not be dismantled and
removed without the written authority from the Executive
Engineer. Thus contractor shall at his own expenses supply and
provide all the construction plant, temporary works materials both
for temporary and for permanent works, labour (including the
supervision thereof), transport to or from the site and in and
about the works and other things of every kind required for the
construction, completion and maintenance of the works.
13. Rubbish and Clearance of Site :
The contractor shall clean away all rubbish, vegetation, roots,
sods etc. and dump them in the area indicated by the Executive
Engineer and to his satisfaction. No separate rate shall be
allowed for the above. After the work is completed and a group
of structures handed over, the contractor shall clear the area
surrounding the work of all hutments, temporary structure and
excess stores and remnants of building materials such as
brickbats, sand, kapachi, timber, steel etc. at no extra cost the
VMC and land brought to its original conditions.
14. Bench Marks
The contractor shall protect surveyor’s bench marks line marks
and base line marks from damage of movement during the work.
The contractors shall inspect the site of work and ascertain site
conditions and the nature of soil to be excavated.
16. Execution of Works :
The contractor is responsible for the correct execution of his
work in accordance with the drawings provided to him and for all
mistakes due to working to wrong levels or center lines. When
levels, center lines and bench marks of reference have been
once given to him by the Executive Engineer in writing, it is his
responsibility to record, protect and maintain the said marks, and
to work to the same, and no complains can afterwards be
attended to for excess work done inconsequence of such levels
not having been kept up and maintained by the Contractor.
17. The contractor shall obtain the permission of the Executive
Engineer before installation of fixed construction machineries,
connections from pipelines, locations of temporary buildings
including labour camps and storage materials, points of tapping
electricity supply of connection. Also the contractor shall not
energize any approval of the Executive Engineer.
18. The work shall be carried out in such a manner as not to interfere
with or affect, retard or disturb the progress of other works being
executes by other agencies.
19. The contractor shall submit to the Executive Engineer
periodically as required, information regarding the progress of
work being carried out by him.
20. The contractor shall provide at his own cost adequate closets
and sanitary accommodation for all his workman employed on
the site. These shall be in accordance with the rules and
regulations of the owner. The lavatories and sanitary
accommodation shall be maintained in good sanitary, working
and disinfected conditions.
21. The contractor shall not allow any visitors on the works except
with the approval of the owner.
22. If the headquarters of the tenderer are elsewhere than in Baroda,
he shall have a duly authorized agent at site from the
commencement of work until completion of the building work as
specified. Such agent shall be authorized to act on behalf of the
contractor, to accept services of notices under the contract and
agree to extra, omissions and varied items of work and rates for
the same. Such agent shall maintain on his staff a qualified
engineer and such other personnel as may be required for the
efficient execution of the work. Any notice under the contract
shall be deemed to have been serviced on the contractor is
served upon such agent. The contractor to carry out any
rectification under the terms of the contractor after the work is
completed. The contractor shall have the same or another duly
authorized are using carried out. This is specified in clause no.
(15) of General Conditions.
23. The successful tenderer shall send a duly authorized competent
representative at his expenses to meet the Add. City Engineer at
his office whenever called upon in writing to do so by the Add.
City Engineer and any instructions, directions or explanations
given by the Add. City Engineer to such representatives shall be
held to have been given to the successful tenderer.
24. The contractor shall afford facilities to the Executive Engineer for
a physical check of such materials in stock in his godowns or at
the site of work, as and when desired by doing so the Executive
25. During the progress of the construction work, if in the drawings,
diagrams and the sketches issued if any to the contractor for the
purpose of execution of work any omissions or inaccuracies are
found by the contractor, he shall bring the same forthwith to the
notice of the Executive Engineer and get them clarified
26. Cement, Steel, Water-power and other material required for
construction shall be produced by contractor from open market.
Contractor shall identify potential sources of material and shall
make arrangements for adequate and time bound supply of
these items. Contractor shall have to get the supply sources and
material approved by Executive Engineer before bringing
material to site. No extension of time shall be granted for
completion of work on account of delays resulting due to non-
availability of material, work, electricity etc. at site.
27. Use of animals is prohibited.
28. Contractor must keep a competent and experienced and
qualified Civil Engineer with experience or as directed by the
Add. City Engineer to get best workmanship and day-to-day
29. All the materials and the workmanship shall be the respective
kind described in the contract and in accordance with the
Executive Engineer instructions and shall be subjected from time
to time, such tests as the Executive Engineer may direct. The
costs of such tests shall be borne by the contractor. No extra
claim will be entertained for the materials, transport, labour,
curing, preservation and supply of test samples of interests and
size and shape as directed by the Executive Engineer.
30. The contractor shall maintain an uptodate record register of the
materials issued to him, if any. One other register may also be
kept showing the quantum of work executed day-to-day together
with materials particularly cement used against each item.
31. A work order register which will also be called site instruction
book will be kept as site by contractor wherein the day-to-day
instruction will be noted down by the Executive Engineer or his
subordinate in charge of work. The violation of the instructions
written by the Executive Engineer or his subordinate in charge of
the work will be severely viewed. The obedience and strictly
followed up of the instructions will be obligatory on the part of the
32. The VMC shall also deduct from running bills submitted by the
contractor an amount equivalent to 2% or as applicable from time
to time of the total amount of each of such running bills towards
to time of the total amount of each of such running bills towards
income tax at source under the relevant provisions of Income
33. The contractor shall indemnify the VMC and every member and
officer and employees of the VMC against all the actions, claims,
demands, costs and expenses whatsoever arising out of or in
connection with the matter referred to in the above clause. The
contractor shall be liable to reimburse the VMC and keep
indemnify the employer in respect of all actions, claims,
procedures, demands, cost expenses which the VMC may have
to incure on account of default of the contractor under the above
34. The VMC will be entitled to deduct from the bills to be paid to the
contractor any sum or sums payable by the contractors and
which sum the VMC in required to pay as a principle employer on
account of default of the contractor in respect of all liabilities
referred to in above clause.
35. Force Majure
If the performance of the agreement arising out of the
acceptance of the tenderer, quotation of the tenderer by the
VMC, is prevented or delayed or interfered with by any act of
nature, wars, act of enemy, blockades, embargo, insurrections,
riots, political or commotions, strikes, lockouts, acts of
Government or other industrial disturbance, explosions or any
other cause whether enumerated or otherwise not within the
reasonable control of the tenderer or VMC, all of which by the
exercise of due diligence is unable to foresee or overcome the
Tenderer or the VMC shall not be held responsible for the non-
performance of such agreement or prevention, delay interference
or suspension in the performance of such agreement any thereof
should bone or both the parties to such agreement be prevented
from fulfilling the contractual obligation by a state of force Majure
lasting continuously for a period of three months, both the parties
shall consult with other regarding the future implementation of
such agreement.
For the force Majure that lasts for less than three months, the
agreement shall remain as it is and suitable period equipment to
time of force Majure shall be added in to total time limit for
performance of the contract.
36. Defect Liability Period
Form the date of issue of completion and acceptance certificate
a period of Twelve calendar months shall be consider as
Defect Liability period. Contractors Liability for this period shall
be described in Clause 40 of General Conditions of Contract.
37. Sole Arbitrator
Municipal Commissioner, VMC shall be the sole Arbitrator. For
any disputes & differences of any kind arising out of or in
connection with the contractor or the carrying out of the works
during the progress of the works or after their completion shall be
referred to & settled by Municipal Commissioner, VMC. The
decision of the Municipal Commissioner shall be final & binding
to both parties.
The contractor shall take full responsibility for loss damages and
the care plant and works until it is delivered to site, erected,
commissioned and taken over by the owner. Without limiting
such responsibility, the contractor shall, in the joint names of the
contractor and the owner, to protect himself and the interest of
the owner, insure the plant and each part thereof for their full
value for the period of 365 days or until they have been taken
over whichever is higher. The contractor alone has to bear the
premium / other expenditure for such insurance. Such insurance
shall cover the equipment against loss, damages or destruction
by fire, lighting, earthquake, thefts, perils of the sea of by any
cause whatsoever, throughout the duration of the contract. The
contractor shall deposit the policy or policies and receipts for the
premium paid with the owner. All money received under any
policy shall be applied in or towards the replacement and repair
of the loss or damage. The insurance must include provision for
payment of foreign currency as may be necessary in respect of
The work specified in the Tender for works expires taking into
consideration the extension of time, if any, for completion of the
work, granted under the relevant clause of the conditions of the
contract in cases other than those where such extension as
necessitated on account of default of the contractor. The
decision of the Add.City Engineer as regards the Operative
period of the contract, shall be final and binding on the
39. Special Condition
Incase if the place of construction and/or alignment of pipe line is
required to be change by Corporation, the successful tenderer
shall have to execute these works at new place at the same
rates and conditions without any cost to corporation.
40. Contractor shall liable to T.P.I. / P.M.C. agency appointed by VMC &
comply all queries raised by them for good quality and better progress
of work. Contractor shall inform T.P.I. and / or P.M.C. agency Before
starting the work all time.
41. D.I pipes is provided by vmc central store department.
GENERAL CONDITIONS
1. The entire job is to be carried out as per the latest relevant I.S.I. and
code of practice.
2. Earnest Money Deposit.
Rs.25981/- (Rupees twenty Five thousand nine hundred eighty one
only) shall be paid as (Earnest Money Deposit along with the tender)
the earnest money shall be accepted in the form of cash/demand draft
of any Nationalized bank in favour of Municipal Commissioner.
3. Time Limit – The time limit shall be 180 days.
4. Electric Power – The contractor shall have to make his own
Arrangements for electric power supply for all the works at his own
5. Penalty – Penalty for delay in works shall be at the rate of ½% of the
contract value per week, and maximum up to 10% of the contract
6. A full time qualified, experienced, Diploma civil engineer shall be
remaining present by the contractor on site of work till the completion
7. Taxes – The price bid is considered inclusive of octroi, sales tax,
excise duty, turn over tax and other taxes levied by the Government
on materials and finished goods purchased for the works. After
opening the price bid any taxes levied by the Government other than
the present tax structure, shall be borne by the contractor.
8. Bank guarantee for security Deposit – Full amount of S.D. shall be
paid by the successful tenderer in the form of bank guarantee of any
nationalized bank in favour of Municipal Commissioner, Municipal
Corporation, Khanderao Market Building, Vadodara for a period of one
years from the date of issue of letter of acceptance.
10. No octroi free passes shall be issued to the contractor.
11. No machinery advance shall be given.
12. All the valves shall be subjected to third party inspection from TATA,
RITES or CEIL only with their test certificates satisfying the IS
13. As built drawing (plan & L.S.) of pipe line shall be supplied in three
copy showing each & every detail position horizontal, vertical all
important ground reference point. The same drawing shall be
given on compact disc in autocad 2000 or latest version.
14. Contractor shall give minimum wages as per Govt. Norms to labour
and workmen employed by him. If there is any dispute it is
contractor’s own responsibility.
15. During the laying of CI & DI line, dewatering shall be done by the
contractor at his own cost.
16. Contractor shall use only ISI marked material.
17. The successful bidder shall have to get register as contractor
in appropriate class with VMC, within 1 month from date of
issue of work order, in case the bidder is not registered with
VADODARA MUNICIPAL CORPORATION
DETAILED SPECIFICATIONS FOR DI DELIVERY PIPE LINE
Item No. 1 : Excavation:
Excavation in all types of soils, soft and hard soil up to 1.5 m depth
and from 1.5 m to 4.5 m depth (keeping the clear cover of soil on the
top of the pipe 1.0 m)
Line out along the alignment of the pipe using lime getting it approved
from Dy. Executive Engineer (WW), breaking the surface and
excavating up to the required depth. The contractor shall provide at his
own cost, red light and a watchman during the night hours, and
provide fencing using ropes on both the edges of the trench before
starting of work. The contractor shall keep a sign board with “Road
Closed – Work in Progress” written on it.
Along the alignment of pipe, the excavated material shall be kept
mtr. away from the trench and protecting the excavated material till the
work is complete.
Excavation will be allowed to be carried out up to maximum 100 m
length at a time. Further excavation shall be permitted only after laying
of the pipe line is complete in the excavated trench.
The work shall be executed in such a way that the water connections,
drainage connection, telephone, electric cables, gas line / water line /
chamber / manhole etc. met during excavation are not damaged. If
required, these cables and poles shall be supported properly, even
then these lines and cables are damaged, and the contractor shall be
held responsible. In case of damage to the water and drainage lines,
electric poles etc. during the excavation the contractor shall repair the
same at his own cost immediately. In case such repair work is not
attend immediately, it will be executed through other agency or
department at the risk and cost of contractor and the entire repair
expenditure shall be deducted from his running bill or from the amount
payable to him.
Any diversion required in existing service lines / house connections
coming in the line of work shall have to be diverted by the contractor at
his cost & risk, as per the instructions and directions of Engineer-in-
Excavation shall be carried out in all types of soil, dry, moist or water
logged. If required the contractor shall procure his own pump and
carry out the de-watering. The places where the soil is soft or made-up
(refilled) the contractor shall provide wooden planks and supporting
structure to the trench, to avoid any mishap or accident.
The excavated stuff shall be dumped at about 1 m away from the
trench (within 90 meter lead), properly in the line and approach shall
be provided across the trench at a suitable interval for the public to
cross over. The contractor’s rate shall including breaking brickwork,
concrete etc. No extra rate shall be payable for this work. The rate
shall be per cubic meter.
Item No. 2 Lowering, Laying, Jointing & Testing of D.I. / C.I. Pipes &
1. Laying of Pipes
Laying of pipe shall be done as per IS 12288-1987
1.1 Laying Underground – Pipes should be lowered into the trench with
tackle suitable for the weight of pipes, for smaller sizes, up to 250 mm
nominal bore, the pipe may be lowered by the use of ropes but for
heavier pipe, either a well designed set of shear legs or mobile crane
should be used. When lifting gear is used, the positioning of the sling
to ensure a proper balance, should be checked when the pipes is just
clear of the ground, if sheathed pipes are being laid, suitable wide
slings or scissor dogs should be used.
All construction debris should be cleared from the inside of the pipe
either before or just after a joint is made. This is done by passing a
pull through in the pipe or by hand, depending on the size of the pipe,
when laying is not in progress, a temporary end closure should be
securely fitted to the open end of the pipeline. This may make the pipe
buoyant in the event of the trench becoming flooded, in which case the
pipes should be held down either by partial refilling of the trench or by
temporary strutting. All persons should vacate any section of trench
into which the pipe is being lowered.
1.2 On gradients of 1:15 or steeper, precautions should be taken to
ensure that the spigot of the pipe being laid does not move into or out
of the socket of the laid pipe during the jointing operations. As soon as
the joint assembly has been completed, the pipe should be held firmly
in position while the trench is backfilled over the barrel of the pipe. The
backfill should be well compacted.
2 Cutting of Pipes – The cutting of pipe if necessary shall be done in
neat and workman like manner without damage to the pipe or lining so
as to leave a smooth end at right angles to the axis of the pipe,
methods of cutting ductile iron pipes are given in 2.1 to 2.3.
2.1 By Hacksaw – Hand or power operated hacksaw should be used with
blades having teeth at a pitch of 1mm.
2.2 By Manually Operated Wheel Cutter – The type of cutting wheel
used for cast iron pipes is not suitable for ductile iron pipe. special
wheels, as used for Cutting steel pipes shall be used and cut ends
are trimmed with a file.
2.3 By Pipe Cutting Machine – Machines with cutter heads or abrasive
wheels shall be used. Cutter head should have a front rake angle of
degree as used for steel pipes.
3 End Preparation of Cut Pipes for Jointing-
The burr left after cutting should be trimmed off by light grinding or by
4 Wrapping - When ductile iron pipes are to be laid in aggressive soils
the pipes should be wrapped externally with protective coatings, such
as bitumen or coal tar sheathing, or in certain bends and valves,
precautions should be taken to provide sufficient overlap of the
wrapping sleeve so that no pipeline is exposed to the aggressive soil.
5 Pipeline Anchorage - All pipelines having unanchored flexible joints
require anchorage at changes of direction and at dead ends to resist
the static thrusts developed by internal pressure. Dynamic thrusts
caused bogy flowing water act in the same direction as flowing water
act in is of sufficient magnitude at high velocities of the surrounding
Anchorages to resist the thrust should be designed taking into account
the maximum pressure the main is to carry, in service or on test, and
the safe bearing pressure of the surrounding soil.
Where possible, concrete anchor blocks should be of such a shape as
to allow sufficient space for the remaking of the joints.
Pipeline should be securely anchored at dead ends, tees, bends,
tapers and salver to resist thrust arising from internal pressure
anchors and thrust blocks should be deigned in accordance with IS :
6 Joints and Jointing
6.0 Two main types of joints are used with ductile iron pipes and fittings.
a) Socket and spigot flexible joints :
1) Push on joints and
2) Mechanical joints.
b) Rigid Flanged joint.
6.1 Flexible Joint : - The spigot and socket flexible joint should be
designed to permit angular deflection in direction and axial movement
to compensate for ground movement and thermal expansion and
contraction. They incorporate gasket of elastometric materials and the
joints may be of the simple push – on - type or the type where the seal
is effected by the compression of a rubber gasket between a seating
on the inside of the socket and the external surface of spigot. Joints
of the latter type are referred to as mechanical joints. Both push in and
mechanical joints are flexible joints . Flexible joints require to be
externally anchored at all changes in direction such as at bends, etc.
and at blank end to resist the thrust created by internal pressure and
to prevent the withdrawal of spigots.
6.2 Flanged joint – Flanged joints are made on pipes having a machined
flexible at each end of the pipe. The seal is usually effected by
means of a flat rubber gasket compressed between two flanges by
means of bolts which also serve to connect the pipe rigidly. Gaskets of
other materials, both metallic and non metallic, are used for special
6.3 Jointing Procedure – Procedure for jointing will vary according to the
type of joint being used. Basic requirements for all type are:
a) Cleanliness of all parts,
b) Correct location of components,
c) Centralization of spigot within socket, and
d) Strict compliance with manufacture’s jointing instructions.
The inside of sockets and the out side of spigots should be cleaned
and wire brushed for a distance 150 to 225 mm. Glands and Gaskets
should be wiped clean and inspected for damage. When lifting gear is
used to place the pipe in the trench, it should also be used to assist
in centralizing the spigot in the socket.
When the pipeline is likely to be subjected to movement due to
subsidence or temperature variations, the use of flexible joints is
recommended. A gap should be left between the end of the spigot and
the back of the socket to accommodate such movement.
7 Transportation, Handling and Inspection
7.1 General - Ductile iron pipes are less Susceptible to cracking or
breaking on impact but the precaution set out should be taken to
prevent damage to the protective coating and brushing or damage of
the jointing surfaces.
7.2 Transportation - Pipes should be loaded in such a way that they are
secured and that no movement should take place on the vehicle
during transit.
The Pipes should be loaded on vehicles in pyramid or straight sided
formation. In case of pyramid loading, the pipes in the bottom layer
should be restrained by the use of broad wooden wedges secured to
the vehicle being loaded. . The pyramid is to be formed by resting
pipes between the pairs of pieces in the preceding layer with the
sockets in layers reversed. Straight sided loading may be used with
supports along the sides of the vehicles. The use of straight side
loading is advantageous for utilizing full capacity of the vehicle.
7.3 Off –Loading – Cranes should be preferred for off loading. However
for pipes up to 400 mm nominal bore, skid timbers and ropes may be
When using mechanical handling equipment, it is necessary to employ
sufficient personnel to carry out the operation efficiently with safety.
The pipes should be lifted smoothly without any jerking motion and
pipe movement should be controlled by the use of guide ropes in order
to prevent damage caused by pipes bumping together or against
surrounding objects.
Where the crane operator does not have a clear view, he should be
guided by the personnel supervising the operation. When cranes are
used, the whole sequence of operation should be carried out smoothly
and without snatch. Properly designed hooks and adequate stead
ropes are essential. The hooks should be of suitable shape, to ensure
positive engagement when entered into the ends of the pipes and then
should pass over any protective packing fitted around the pipe ends.
The use of slings passed around bundles of pipes is not
recommended because bundles become unstable as the sling is
drown tight or released. However, when it is necessary to use the
central slinging method for lifting single pipe, a board webbing sling is
recommended which minimizes the risk of the pipe slipping. Chain
slings may slip and are dangerous.
7.4 Stacking - Pipes being taken to a stock ground for storage and held
pending further distribution should be arranged into stacks. The first
layer of pipes should be laid on a firm foundation level on the ground.
Subsequent layers should be plased according to the method of
stacking adopted. Care should be taken so that the pipes do not rest
on their sockets. The height of any stack should not exceed 2 m.
7.5 Stringing - Stringing consists of placing pipes on the ground in line
ready for laying. Care should be taken to prevent damage during this
8 Hydraulic Testing
8.1 After a new pipe line is laid and jointed, testing shall be done for:
a) Mechanical soundness and leak tightness of pipes and fittings;
b) leak tightness of joints; and
c) Soundness of any construction work in particular that of the anchorages.
8.2 Hydrostatic Testing - The completed pipe line may be tested either
in one length or in sections. The length of section depending upon :
1) availability of suitable water,
2) number of joints to be inspected, and
3) difference in elevation between one part of the pipeline and
Where the joints are left uncovered until after testing, sufficient
material should be back filled over the center of each pipe to prevent
movement under the test pressure.
It is prudent to begin testing in comparatively short length of test
section. Progressively as experience is gained, lengths of about
km or more, are tested in one section, subject to consideration of
length of trench which can be left open in particular circumstances.
Each section should be properly sealed off, preferably with special
stop ends secured by adequate temporary anchors. The thrust on the
stop ends should be calculated and the anchors designed to resist it.
All permanent anchors should be in position and, if of concrete, should
have developed adequate strength before testing begins. The section
under test should be filled with water, talking care that all the air is
displaced either through vents at the high points or by sing a pig or a
A test shall not be more than 1000m. initially on straight or curved line.
All air shall be expelled from the test segment by making air vents at
the highest point of test section and or both of testing segment.
The first part of the testing shall be stabilize the section at a lower
pressure of 1-2 kg/sq. cm at the highest point for a duration of at least
4 hours. On satisfactory completion of this joints shall be tested
against leakage by increasing the test pressure to 5.50 Kg/Cm2 and
holding it for 15 minutes.
If the pressure drop is less than 0.2 kg/sq. cm. over this period, the
test shall be deemed satisfactory.
For the purpose of the test, either power-driven or manual
reciprocating pumps shall be used with clean water. The contractor
has to arrange water for testing.
The pressure gauges shall be in good condition and of suitable ranges
and least count of atleast 0.2 kg/cm2.
The air vent holes shall be properly plugged and sealed with
coupling/nut on completion of the test. The suitable water sealing
chemical shall be used in case of any leakage.
At the end of testing section temporary concrete thrust block shall be
casted of sufficient size and strength to resist the testing pressure.
The cost of such thrust block, jacks, wedge etc are inclusive in the
A pipe segment once tested shall not be used as a support to anchor
the end blocks used for testing the next segment.
The length of this period of time depends on many factors such as
slight movement of the pipeline under pressure whether air is trapped
in the pipeline has concrete lining which absorbs water.
The pipeline is then pressurized up to the full test pressure and the
section under test completely closed off. The test should be
maintained for a period of not less than 15 minutes to reveal any
defects in the pipes, joints or anchorages.
The test pressure should be measured at the lowest point of the
section under test or alternatively, an allowance should be made for
the static head between the lowest point and the point of
measurement, to ensure that the required test pressure is not
exceeded at the lowest point.
For the test section required end cap at both the end for testing
purpose shall be arranged by the contractor at his own cost. It
includes jointing & removing after testing, including all cost of jointing
materials & labour etc comp.
8.4 If the test is not satisfactory the fault should be found and rectified.
Where there is difficulty in locating a fault, the section under test
should be sub divided and each part tested separately.
Methods employed for finding leaks include:
a) Visual inspection of each joint if not covered by the backfill;
b) Use of a bar probe to detect signs of water in the vicinity of joints, if
c) Aural inspection using a stethoscope of listening stick in contact with
d) Use of electronic listening device which detects and amplifies the
sound or vibration due to escaping of water, actual contact between
the probe and the pipe is not essential.
e) Injection of a dye into the test water particularly suitable in water
f) Introduction of nitrous oxide in solution into the test water and using an
infra-red gas concentration indicator to detect the presence of any
nitrous oxide that has escaped through the leak.
8.5 After all sections have been joined together on completion of section
lasting a test on the complete pipe line should be carried out. This
test should be carried out at a pressure not less than the maximum
sustained operating pressure or the maximum static pressure of the
pipeline and during the test , inspection made of all work which has
not been subject to section tests. During the test, the pressure at the
lowest point in the pipeline should not exceed the maximum given
8.6 It is important to ensure that proper arrangement is made for the
disposal of water from the pipeline after completion of hydrostatic
testing and that all consents which may be required from authorities
have been obtained. In some cases, for example, heavily chlorinated
water some treatment may be necessary before final disposal.
9 FLUSHING MAINS BEFORE COMMISSIONING
9.1 The main intend of flushing the pipe line is to remove any foreign
material before commissioning them for use.
After pressure testing the main, it should be flushed with water of
sufficient velocity to remove all dirt and other foreign materials.
a) Flushing of all lines shall be done after pressure testing
b) Flushing of all lines shall be done in the presence and as per
directions of Engineer-in-charge or his representative.
c) Flushing of pipe lines will be done by fresh potable water, to clean
the pipe of all dirt, debris and foreign materials.
d) It will be contractor’s responsibility to provide all necessary
equipment, materials and consumables required for completing the
flushing as per directions of the Engineer-in-charge.
e) Water passing will be continued till the inside of the pipe is fully
a) During flushing discharged water shall be drained to nearby
storm water drain or the place directed by the Engineer-in-
charge. Necessary arrangement should be done without any
extra cost for the same. Care shall be taken during flushing so as
not to damage/spoil other agencies work proper temporary drainage
for flushing water shall be taken to prevent entry of water, foreign
particles, into equipments, electric motors, instruments, electrical
installations etc. in the vicinity of line being flushed.
10 REMOVAL, RESTORATION AND MAINTENANCE OF PAVED
FOOTPATHS, ETC, AFTER LAYING OF PIPE
10.1 Allowable Removal of Pavement – Pavement and road surfaces may
be removed as a part of the trench excavation , and the amount
removed shall depend upon the width of trench specified for the
installation of the pipe and the width and length of the pavement area
required to be removed for the installation of gets valves, specials
manholes or other structures. The width of pavement removed along
the normal trench for the installation of the pipe shall not exceed the
width of the trench specified by more than 150 mm on each side of
trench. The width and the lengths of the area of pavement removed
from the installation of gate valves, specials, manholes or other
structures should not exceed the maximum linear dimensions of such
structures by more than 150 mm on each side, wherever, in the
opinion of the authority, existing conditions make it necessary or
advisable to remove additional pavement, it shall be removed as
directed by the Engineer-in-charge.
10.2 Restoration of Damaged Surface and Property :
Where any pavement, shrubbery, fences poles or other property and
surface structures have been damaged, removed or disturbed during
the course of work such property and surface structures shall be
replaced or repaired after completion of work. All pavements, paved
footpaths, curbing gutters, shrubbery fences, poles, sod or other
property and surface structures removed or disturbed as a part of the
work shall be restored to a condition equal to that before the work
began, furnishing all labor and materials incidental there to, in
restoring the pavement, sound stone blocks, sound bricks, Paver
Block or asphalt paving blocks may be re-used. No permanent
pavement shall be restored unless and until, in the opinion of the
authority, the condition of the back fill is such as to properly support
10.3 Cleaning Up – All surplus materials, and all tools and temporary
structures shall be removed from the site as directed by the authority.
All dirt, rubbish and excess earth from the excavation shall be halved
to a dump and the construction site left clean to the satisfaction of the
engineer-in-charge.
The rate shall be per running meter including loading, unloading &
transportation of pipe from store to site.
Item No. 3 : Refilling:
Refilling the pipe line trenches incl. ramming, watering, consolidation,
disposal of surplus stuff as directed within radius of 3 km. After the
pipe line is laid, jointed and tested and proved to be water tight the
trenches shall be refilled in the manner described below:
The first foot of filling material immediately above and around every
pipe shall consist of finest selected earth been protected in the
manner described above. After the first foot of material has been
placed in position the remainder of the material is to be filled up to 9”
below surrounding ground level at a time and sufficient water i.e. min.
150 lit./m3 of excavation shall be used and flooded the trench in
addition to aid consolidation of filling material. After this having been
done, the trenches or the excavation shall be left for one day to allow
consolidation and on the next day it should be restored to its original
condition and opened to use. Contractors have to produce evidence
for using water for consolidation.
After trenches having been filled to their original surface all surplus
material shall be removed by contractor. Some of the earth may be
kept for use to restore and subsequent settlements but it shall be
stacked properly and protected at convenient points so as not to
cause any interference to traffic or nuisance to the public. Before the
final bill is paid, the contractor shall make good promptly at his
expense any settlement that have occurred even in the vicinity of
excavation. He shall also repair and set right at his own expense any
damage caused to property and such works shall be carried out to the
full satisfaction in all respects of the owner thereof.
Restoration of Surfaces
All berms and other paved surfaces shall be restored in as good
condition as before disturbance or the execution of work and any
deficiency in the filling material resulting from theft or any other case
what so ever shall be made good by the contractor at his own cost.
In case of roads the operation may be done in the two portions to
facilitate the traffic.
The rate shall be per Cu. Mtr.
Item 4 (C) : Fixing of Valve :
The valve shall be fixed with pipe line as per the instruction of
engineer-in-charge.
The valve and the tail pieces will be jointed using rubber packing, nuts,
bolts, washers etc. after properly cleaning the tail pieces & the flanges
of valve. The valve shall be lowered using the chain pulley block and
fixed keeping vertical axis perfectly vertical and placed on cement
concrete block at bottom for proper leveling. The contractor shall be
responsible for protecting the valve, tail piece etc. The contractor will
be responsible for protecting the sluice valve spindle, cap till the pipe
line is handed over to the corporation.
The rate shall per Number.
Item No. 6 (B) : Lowering & Laying of C.I. Pipe & Specials with Lead
The C.I. Pipes and specials are laid in line and level in the trench. The
spigot shall be properly fixed in the socket in line & level using chain pulley
block or such approved method. If required the pipes shall be cut using
appropriate equipment before laying.
The required jute, lead tools etc. shall be supplied by the contractor.
To make the lead joint and to facilitate the cocking the area around the
joint shall be excavated to 0.5 m as directed by the corporation’s
engineer to make available the working space. No payment shall be
made for such excavation. The socket and spigot shall be properly
cleaned using wire brush. The contractor shall supply the approved
quality of jute and inserting it with required tools and filling the joint
with lead as per the details given below or as per PWD HBA-2, Table
– CC (VII). The joint shall be kept open from all the sides and got
checked from the site overseer.
Details required Lead Joint Remark
1 100 mm C.I.Pipe 2.50 5.0 As per
2 150 mm C.I.Pipe 3.62 6.0 HBA –
3 250 mm C.I.Pipe 6.12 7.75 Table-
4 300 mm C.I.Pipe 7.70
5 375 mm C.I.Pipe 10.45
6 450 mm C.I.Pipe 14.30
7 525 mm C.I.Pipe 16.25
8 600 mm C.I.Pipe 19.00
9 700 mm C.I.Pipe 21.00
10 750 mm C.I.Pipe 25.00
Maintaining the gaps as mentioned above, pouring lead into the joints
using lead, wool, etc. at site and after heating the lead making the joint
in presence of the corporation’s engineer. The joint made in absence
of the engineer shall not be considered and the contractor shall
remove the joints and the lead at his own expense and re do the joint
in presence of the engineer. The Contractor shall see that in no case
the lead come out of the joint and in no circumstances he would be
allowed to cut the same.
The Contractor has to give Hydraulic Pressure test as per hydraulic
testing described in pipe laying work. If leakage is found, it must be
repaired by contractor at his own cost.
The item shall be paid per number.
ITEM NO.8 : Transporting of pipe
Transporting of pipe of all type and size including loading, unloading
and stacking as directed.(Wt. more then 200kg.),Article having weight
up to 1 MT. Pipe should be transporting from source of supply to
Km. and Beyond 5 km. to 50 km. as per requirement.
The rates shall be paid on M.T. basis.
Item No. 17 : Providing, supplying & fixing at site of work, CI
The contractor shall supply the standard road box @ 13.5 kg per
number with ‘VMC’ marked on the cover of road box only ±2%
tolerance in weight shall be permissible. The road box shall be fixed
on cap of sluice valve with necessary C.I. pipe between valve cap &
road box as per instruction of engineer-in-charge.
The rate shall be paid per number basis.
The rate shall be as per Rmt.
Item No. – 23 Providing & Laying Stoneware Pipe :
Providing and laying 150mm stoneware pipe of approved make
including excavation, laying & jointing earthen stoneware pipe with
necessary TS, bends etc. complete with neat cement. Curing shall be
done as per direction and watering in trenches and joints etc
complete. The work in general shall be carried as per instruction of
the Engineer-in-charge of the work.
This item will payable only when it is necessary to shift or
relay the existing pipeline in unavoidable site situation. The prior
approval/ permission from Dy. Ex. Engineer is necessary for the work.
This item will not payable for restoration or to repair existing pipeline
damaged by contractor during excavation or laying work.
The rate shall be paid on Rmt. basis.
Item No. – 24 Removal of Existing Tiled / Stone Pavement
The tile /stone /paver block flooring removed only manually to prevent
the Breaking of tile /stone /paver block & stacking the same within
mtr. range as per instruction of Engineer-in-charge.
The rate shall be paid on Sq. Mtr. basis.
Item No. – 26 Repairing of Stone Pavement
Laying and fixing of 50mm thick interlocking paver block as per design
given by Engineer Incharge with 50mm thick sand bed layer, watering,
compacting paving with compacter by mechanical compacter etc.
complete as per specification & instruction of Engineer-in-charge.
The rate shall be paid on Sq. Mtr. basis.
Box cutting the Road surface to proper slope and camber for making a
base for road work incl. removing the excavated stuff and depositing
on the road side slope us directed upto 50 Mt.lead.
The rate shall be on cumt. basis
Carting of excavated excess soil at proper place with in municipal
limit as per instruction given by engineer incharge.
The rate shall be on cumt. basis
Providing & laying compacted machine crushed black stone aggregate
250mm thick wet mix macadam in two layers in the material with
water to OMC in mechanically mix (pug mill) carriage of mix material
by tipper to site laying, spreading and compacting in sub base of
compacting power vibratory roller to achieve the desired density
(mechanically laid) etc.complete.as per technical specification MORTH
After laying the pipes watering shall be done in the trench, the
watering in all layers shall be done. It shall be rolled by 10 tones wt.
roller, rolling up to satisfaction. Removing excess soil from the trench
making proper sub base, using 45 to 90 mm thick machine cut metal
from black trap rock kapacha soling with spreading of good quality of
sand as specified shall be done in 11 cm. compacted layer including
rolling watering etc. comp. After completion of Kapacha soling using
22.4 mm to 53 mm thick machine cut metal from black trap rock of
Timba, Sevaliya make metal grouting shall be done in 10 cm.
compacted layer in two layer each of 5 cm th. by using VG-10 grade
bitumen @ of 0.5kg/sq.mt as tack coat on existing surface and
1.5kg/sq.mt on each layer of metal and spreading B.T. grit
@1.3CM/100sqmt and including necessary cleaning of existing
surface, rolling in each layer etc. complete with good quality of
material as per specification and instruction by Engineer In charge.
Also providing and laying 65 mm thick compacted asphalt
macadam carpet using coarse aggregate, fine aggregate, filler as per
required gradation, applying tack coat at the rate of 5 kg./ 10 sq. mt.
and using asphalt (VG-30 grade) 4% by wt. of mix and mixing by drum
mix process spreading by paver finish and flushing quarry dust/Goma
sand on B.T. surface at the rate of 0.75 CM./100 sq. mt. including
consolidation etc. complete by using Sevaliya Quarry material.
Whenever necessary, at crossing of main road and approach
reinstatement of road shall be done immediately after laying the pipe.
All material, labour, machinery and equipment shall be brought
by contractor at his own cost.
The rate shall be on sq. mt. basis
Item 4 A : Providing & Supplying Ductile Iron Resilient Seated Sluice valve :
Features required for Sluice valves suitable to water work application for continuous operation up to
70 degree Celsius are as follows or otherwise the standard BS 5163/EN 1074-1&2 Ductile Iron /
Spheroidal Graphite (S.G.) Iron Double flanged resilient seated Sluice Valves Full bore in
accordance with BS 5163/EN 1074-1&2 of PN-10 /16 rated, with Body and Bonnet of Ductile Iron
confirming to GGG-50/40 or IS 1865 Gr. (SG 500/7 or SG 400/15), Wedge of WRAS or DVGW
approved EPDM rubber (approved for drinking water), Integral Wedge nut, Shaft of S.S. AISI
O rings of NBR. Body & Bonnet coated with electro statically applied epoxy powder coating to
DIN 30677-2 & GSK guidelines or equivalent to GSK Guide line. Blue colour RAL 5005/5017
with a coating thickness of 250 microns both inside & outside. Sluice valve shall be compatible for
buried applications without valve chamber. Face-to-face dimensions as per BS 5163/EN558 and
Flange drilling as per IS 1538. 100% tight shut-off. Manual operation by Hand wheel at present
but it should be upgradable for Motorized operation by Electrical Actuator suitable for
All Sluice valves must undergo hydraulic testing to BS 5163/EN 1074-1&2
- Seat test 1.1 x PN rating
- Body test 1.5 x PN rating
Summary of materials used are as follows:
ITEM COMPONENT MATERIAL GRADE Standarad
1 Body, Bonnet Ductile Iron 500-7 or 400-15 BS EN5163/
2 Wedge core Ductile Iron 500-7 or 400-15 BS EN5163/
3 Wedge nut Brass CZ 132 BS 2872/4
4 Rubber EPDM EUW 70 WRASor DVGW
(vulcanised on Approved
5 Stem Stainless steel A276-420 EN 10088-1
6 Stem collar Dezincif. res. CZ 132 BS 2872/4
7 Bonnet bolts Stainless steel A2 ISO
8 Bonnet gasket EPDM EUW 70 WRAS or DVGW
9 O-ring NBR - -
1 Dust seal ring NBR - -
1 Hand wheel Grey cast iron 250 EN
1 Actuator Mfg. Std. - -
2 (Rotork/Auma)
4.0 Markings and labelling
Valves shall have the following marking in raised letters: -
a. The nominal size (i.e. DN)
b. The nominal pressure designation (i.e.PN)
c. The body material identification (i.e. GGG)
d. The manufactures name/trademark
e. Year of manufacturing
f. Direction of closing markings (i.e. in cast direction arrow)
g. Traceable serial number for each valve, - either as engraved tag plate or bar code labelling of
aluminium or equivalent durable material.
5) The contractor shall provide manufacturer’s test certificate fulfilling quality of valves as per
relevant Indian standard.
6) The contractor shall also produce third party inspection test certificate of ‘TATA’, EIL or CEIL.
The third party inspection charge will be borne by the contractor.
7) Sluice valve shall be provided with double flanged ends for connections. The flanges and their
dimensions of drilling shall be in accordance with I.S. 1538/1993 or its latest revision.
6) The valve shall be provided with cap as per I.S. with a removal key for valve operation.
7) The valve spindle shall be of S.S. Non Magnetic type and Four T.P.I. for up to 300mm. dia. &
Two T.P.I. for 350mm. & above size. The valve shall be of R.S. (Clock wise opening).
8) The valve shall be of Non rising type.
9.0 Certification
a. Manufacture or supplier is requested to provide a copy of the certificate and testing report from
recognized certification body.
b. The Manufacture’s quality system ISO 9001:2008 certified by authorized body and copy of
certification submitted on request.
c. Manufacture should give minimum 10 Years of Warranty.
The rate of item covers cost of supply of valves with I.S.I. mark inclusive of all taxes,
duties insurance, loading, unloading, carting etc. complete.
The rate shall be on number basis.
Item 4(B) (2) Supply of CI Tail Pieces
Supplying Flange / Spigot – Socket type Tail Pieces of required dia. to
suit the site conditions and as required on the site or store. C.I.Tail
Pieces shall be as per IS 1538-1993 specifications and with ISI mark,
along with test certificate. The rates shall include loading, unloading,
carting, stacking, insurance, taxes, octroi, freight, weighing etc.
The rate shall be per kilogram weighing as per actual weight. The
contractor shall produce weight slip of approved weighing balance for
Item No. 5(B) : Providing and supplying of C.I. Specials :
Supplying Flange / Spigot – Socket type specials of required dia, to
suit the site conditions and as required on the site or store, specials
viz; bends of any degree, tail piece, reducer, collars, cap, tees,
puddles etc. C.I. fitting shall be as per IS 1538-1993 specifications
and with ISI mark, along with test certificate. The rates shall include
loading, unloading, carting, stacking, insurance, taxes, octroi, freight,
weighing etc. complete.
The rate shall be per kilogram weighing as per actual weight. The
contractor shall produce weight slip of approved weighing balance for
Valves for pipe Kirloskar, Upadhyay, IVC, IVR, Jupitor or
line Durga make with ISI Mark.
Pipe manufactured from M.S Plate & M.S.
Coil supplied by TISCO/ SAIL/ ESSAR/
JINDAL and manufactured and tested as per
relevant Indian Standards with ISI Mark.
Steel SAIL, Vizag steel, Tata, Well spun, Electro
Reinforcement therm, Punjab, Hytuff,
Sail, Tata iron steel Co. Ltd, Jindal, Essar
Structural Steel Steel Ltd, Ispat Ltd, Electrotherm. as per
relevant Indian Standards with ISI Mark.
Ultratech / JK Laxmi / Ambuja / Binani /
Siddhi / Kamal/ wander/ Hibond.
DI pipes Electro steel, Lanco, Jindal, Electrotherm.
RMC Ultratech, JK Lakshmi, Lafarge.
CI Pipe Electrosteel, Kapilance, Truform.
Sign & Seal of Contractor
(WORK - WISE DETAILS OF WORK COMPLETED OR IN PROGRESS BY THE
1. Name of Contractor
2. Name of work
3. Estimated cost of work put to tender
4 Tender Amount
5 Date of starting the work
6 Date of completion of the work.
(As per contract agreement).
7 Actual date of completion
8 Amount of work done up to final bill RS.
Signature of contractor
9. Are the details given by the contractor
. as above correct. If not what are the
correct information
10 Had the contractor executec the work
in progress/completed the work
satisfactory as per specification. If not
give the correct situation of the work.
11 Any other remarks.
12 Major Qty. Executed under this
(i) Earth Work in Excavation
(ii) Concrete work
(iii) DI/CI & M.S. pipe line work
(iv) Brick Masonery & concrete for
P.House, T.S.room compoundwall
Laying of New DI water Pipe line in hare
Krishna township society ( 80/20 scheme of
government) , in Ward No. 4 East zone
EXECUTIVE ENGINEER
VADODARA MUNICIPAL CORPORATION
Name of Work:- Laying of New DI water Pipe line in hare
Krishna township( 80/20 scheme of government) , in Ward
Item Unit Quantity Rate Amount Amount
Sr no Item description Unit Quantity Rate Amount
Excavation for pipeline trenche including all cum 1300 102.35
safety provisions using side rails and
stacking excavated stuff upto a lead of
mt. cleaing the site etc. complete for lifts and
strata as specified in all sorts of soil and
soft murrum. (1) O.O TO 1.5 Mt. Depth
Lowering, laying and jointing C.I. rmt 950 87.40
S & S Spun pipes suitable for Tyton joints/
Mortar lined D.I. K-7 pipes of various classes
with C.I./D.I./M.S. specials of following
diameters in proper position, grade and
alignment as directed by Engineer-in-charge
labour, including transportation, loading,
unloading & giving hydraulic testing
(GWSSB SOR. 22-23, Sec B, I.no.6., P.no.
Refilling the pipeline trenches including Cum 1300 25.30
ramming, watering, consolidation, disposal of
surplus stuff as directed within a radious of
3kms. (GWSSB SOR.22-23, Sec.B, I.
Lowering, Laying, Jointing in position No 10 672.25
following C.I./DI Double Flanged Sluice
valve including transportation from store
to siteof work, loading, unloading
including cost of all labour jointing
material, including nut, bolts and giving
satisfactory hydraulic testing etc.
(GWSSBSOR.22-23, Sec.B, I.no.15.(a),
Lowering, laying and jointing cast iron No 130 310.71
pipe line by lead joint with specials
such as tees, bends, reducers, valves
including lighting, guarding, barricading,
testing etc. complete including cost of
jointing materials, such as lead, hemp
yarn etc. complete. but excluding
excavation and refilling.
Transporting of pipe of all type and size
including loading, unloading and
stacking as directed.(Wt.more then
200kg.), Article having weight up to1 MT
(GWSSB SOR.13-14, Sec.F, P.No.120,
A) From source of supply to 5 km. MT 25 707.46
B) Beyond 5 km.to 50 km. for each MT 25 7.19
Providing & laying C.I. Rod box of No 10 620.54
approximate weight of 13.5 kg. As per
drawing (VMC S.O.R. 06-07, Page No-
Providing and supplying ISI mark
stoneware Pipes of class-A and
following diameter including all taxes,
insurance, loading, unloading,
tansportation to site of work, including
lowering, laying and jointing with cement
joint in C.C(1:1) in proper position, grade
and alignment etc.complete
(GWSSB SOR.22-23, Sec.A, I.No.11.1,
P.No.17 + Sec.B, I.No.12, P.No.40)
Removing tiled or stone/paver block floor Sq.m 700 47.25
laid in mortar including stacking of
serviceble material and disposal of
unserviceble material with all lead and
lift. (R&B SOR 2023-24 P NO. 158 I.No
Laying and fixing of 50mm thick Sqm 700 125.49
interlocking paver block as per design
given by Engineer Incharge with 50mm
thick sand bed layer, watering,
compacting paving with compacter by
mechanical compacter etc. complete as
per specification .( Approved Rate)
Box cutting the Road surface to proper Cum 422.40 103.170
slope and camber for making a base for
road work incl. removing the excavated
stuff and depositing on the road side
slope us directed upto 50 Mt.lead. ( R &
B SOR 2023-24, Page No - 192, It code
Carting of excavated excess soil at Cum 422.40 128
proper place with in municipal limit as
per instruction given by engineer
incharge.( R & B SOR 2023-24, Page No -
193, It code.-26010C)
Providing and laying of good quality Cum 210 690.180
material of GSB in proper line,level and
camber (compacted thickness suggested
by engineer incharge) with roller 8-10MT
capacity on GSB as per specification and
instruction by engineer
incharge.(Approved Rate)
Providing & laying compacted machine Cum 140 1103.57
crushed black stone aggregate 250mm
thick wet mix macadam in two layers in
the material with water to OMC in
mecanically mix (pug mill) carriage of
mix material by tipper to site
laying,spreading and compacting in sub
base of compacting power vibrater roller
to achive the desired density
(mechanically laid) etc.complete.as per
technical specification MORTH clause-
406(Approved Rate)
PART - B (Valves & Specials)
Providing & supplying of Following Slucie Valve
Ductile Iron/Spheroidal Graphite (S.G.) Iron Double
flanged resilient seated Sluice Valves Full bore in
accordance with BS 5163/EN 1074-1&2 of PN-
10/16 rated, with Body and Bonnet of Ductile Iron
confirming to GGG-50/40 or IS 1865 Gr. (SG 500/7
or SG 400/15), Wedge of WRAS or
DVGWapproved EPDM rubber (approved for
drinking water), Integral Wedge nut, Shaft of S.S.
AISI 420, O rings of NBR. Body & Bonnet coated
with electrostatically applied epoxy powder coating
to DIN 30677-2 & GSK guidelines or equivalent to
GSK Guideline.Blue colour RAL 5005/5017 with a
coating thickness of 250 microns both inside &
outside. Sluice valve shall be compatible for buried
applications without valve chamber. Face-to-face
dimensions as per BS 5163/EN558 and Flange
drilling as per IS 1538. 100% tight shut-off. Manual
operation by Hand wheel at present but it should
be upgrdabale and suitable for motorized operation
by Electrical Actuator suitable for SCADA system.
(Rate from quatation of JUPITER Engineering
P & S CI tail pieces. (GWSSB SOR 22-
23,Sec.A ,I.no.19.1.B, P.no.29)
1) 80 to 300 mm Dia. Kg 500 58
Providing and supplying at store or site of
work C.I. special's like tees, bends, reducers,
caps etc. as per IS 1538-1993 with ISI mark,
inclusive of transporting, all taxes, Insurance,
Inspection charges, octroi, loading and
Unloading etc. complete.
(GWSSB SOR 22-23,Sec.A ,I.no.19.1.A,
1 1) Up to 300 mm Dia. kg 3500 58
I/We am/are willing to carry out the work at… ....................... % above /below percent
(Should be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct ………% below Add ………% Above
In words In words
Name of Tenderer : ___________________________
Address of Tenderer : ___________________________
Executive Engineer (E.Z.)
Vadodara Municipal Corporation
Signature of Tenderer : ____________________
Signature of the Officer issuing
the Tender documents : ____________________
Signature of the Officer
opening the Tender : ____________________
VADODARA MUNICIPAL CORPORATION
Name of Work:- Laying of New DI water Pipe line hare
Krishna township ( 80/20 scheme of government) , in Ward
No. 4 East zone
1) For all items (i.e. Part A + B)
Estimated Cost Tender cost in Rs.
In Figures In Words
Laying of New DI
water Pipe line in
township society (
80/20 scheme of
government) , in
Ward No. 4 East zone
Total Rs.12,99,046 Rs 12,99,046 Twelve lakh
Rs.12,99,046 ninty nine
Signature of the Tender with seal
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
harekrishana tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .