Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 LAccepted-AOC | 1 | Accepted-AOC Agreement executed on 18.06.2025 | |
| 2 | 2₹1.7 L+₹3,034.51 (1.85%)Rejected-Finance | 2 | Rejected-Finance Higher rate. Hence rejected |
| Sl No | Description | Qty | Unit | B UDAYAKUMAR L1 | SHIBU S V L2 |
|---|---|---|---|---|---|
| 1.00side protection | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6 | sqm | 15.93 ₹95.58 Lowest | 16.23 ₹97.38 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 0.8 | cum | 664.37 ₹531.5 Lowest | 676.68 ₹541.34 |
| 1.00 | OD25506/2023-2024:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | 3 | each | 949.09 ₹2,847.27 Lowest | 966.67 ₹2,900.01 |
| 1.00 | OD37337/2024-2025:DR packing with Departmental. Stone - Dry stone packing under foundation using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 0.56 | cum | 736.39 ₹412.38 Lowest | 750.02 ₹420.01 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 7.51 | cum | 231.15 ₹1,737.09 Lowest | 235.43 ₹1,769.26 |
| 1.01 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 3.73 | cum | 2,814.99 ₹10,511.17 Lowest | 2,867.12 ₹10,705.83 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 3.22 | cum | 7,360.07 ₹23,706.79 Lowest | 7,496.37 ₹24,145.81 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 41.36 | sqm | 774.58 ₹32,035.08 Lowest | 788.92 ₹32,628.15 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 10.68 | cum | 7,788.03 ₹83,168.37 Lowest | 7,932.25 ₹84,708.5 |
Tender Value
₹1.5 L
EMD Value
₹3,793
Closing Date
25 Apr 2025, 4:00 pmClosed
Assistant Executive Engineer, Minor Irrigation Sub
Office of the Assistant Executive Engineer, Minor Irrigation Sub Division, Attingal Pin 695101
DEPOSIT-Civil work-Side protection work of Vettoor ela thodu near Manikandan chira in Madannada road in ward IV of Vettoor panchayath in Varkala constituency
2025_Irrig_760268_1
IRR/IA/TR/7238/2023_5_1_1/1
Open Tender
Civil Works - Water Works
Item Rate
180 days
Thazhe Vettoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,793
Yes
31 Aug 2026
16 Apr 2025
28 Apr 2025
16 Apr 2025
25 Apr 2025
16 Apr 2025
Amount
side protection
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
OD25506/2023-2024:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible
OD37337/2024-2025:DR packing with Departmental. Stone - Dry stone packing under foundation using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
SHIBU S V (BID ID -2200246)
Bidder Name
B UDAYAKUMAR
SHIBU S V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1235899.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .