Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAccepted-AOC KERALA KL KERALA | PALAKKAD | KERALA | 678621 | ₹5.7 Cr | L1 | Accepted-AOC Agreement executed by L1 |
| 2 | L2₹6.2 Cr+₹50.2 L (8.78%)Rejected-AOC | ₹6.2 Cr+₹50.2 L (8.78%) | L2 | Rejected-AOC Agreement executed by L1 |
| 3 | L3₹6.4 Cr+₹69.8 L (12.2%)Rejected-Finance | ₹6.4 Cr+₹69.8 L (12.2%) | L3 | Rejected-Finance L1 L2 admitted |
| 4 | L4₹6.5 Cr+₹74.8 L (13.1%)Rejected-Finance | ₹6.5 Cr+₹74.8 L (13.1%) | L4 | Rejected-Finance L1 L2 admitted |
| 5 | L5₹6.5 Cr+₹81.0 L (14.2%)Rejected-Finance KANNUR | KERALA | 670001 | ₹6.5 Cr+₹81.0 L (14.2%) | L5 | Rejected-Finance L1 L2 admitted |
Tender Value
₹6.2 Cr
EMD Value
₹2 L
Closing Date
28 Jan 2023, 5:00 pmClosed
Superintending Engineer, PWD Bridges, North Circle
Office of the Superintending Engineer, PWD Bridges , North Circle, Thondayad,Kozhikode 673017
DEPOSIT-Construction of Subway across Calicut Mukkam road for NIT calicut- Construction of Subway across Calicut Mukkam road for NIT calicut-DPR Preparation Work
2023_PWD_549412_1
PWD/BR/TR/17332/2022_12_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
540 days
NIT Calicut
Please refer Tender documents.
8 documents required · 8 mandatory
₹13,010
Yes
₹2 L
Yes
6 May 2023
13 Jan 2023
30 Jan 2023
13 Jan 2023
28 Jan 2023
13 Jan 2023
Amount
Construction of Subway
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Rubble stone masonry in cement mortar.<br>
2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately<br> Bituminous course - By Mechanical Means<br>
2.3.2.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of thorny jungle - By Mechanical Means<br>
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
3.7:Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
3.9:Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
12.8.2.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump <br>
12.8.H.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M35 - Using Batching Plant, Transit Mixer and Concrete Pump <br>
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
14.16:Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
8.20:Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
OD127495/2022-2023:PVC WHEEP HOLES- Providing wheep holes using 75mm dia PVC pipes working pressure 4kg/sqcm including cost of materials,conveyance,labour charges etc
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
Service road
OD128465/2022-2023:Dry rubble without concrete levelling course masonry with good quality blastered rubble including packing to compactness to lines and levels cost and conveyance of all materialslabour charges etc.complete asper direction of departmental officers at site.
OD202894/2022-2023:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Madathil Constructions
V ABDUL AZEEZ
PTS HITECH PROJECTS INDIA PRIVATE LIMITED
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
PTS HITECH PROJECTS INDIA PRIVATE LIMITED
V ABDUL AZEEZ
Madathil Constructions
MALABAR PLUS CONSTRUCTIONS PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .