| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.0 L+₹4,235.64 (1.42%)Admitted-Fee/PreQual/Technical/Finance | ₹3.0 L+₹4,235.64 (1.42%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.0 L+₹7,321.71 (2.46%)Admitted-Fee/PreQual/Technical/Finance KOTTAVILA PUTHUVAL PUTHENVEEDU PARASALA P O PAVATHIYANVILA | THIRUVANANTHAPURAM | KERALA | 695001 | ₹3.0 L+₹7,321.71 (2.46%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.1 L+₹16,802.25 (5.64%)Admitted-Fee/PreQual/Technical/Finance | ₹3.1 L+₹16,802.25 (5.64%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.2 L+₹19,483.04 (6.55%)Admitted-Fee/PreQual/Technical/Finance | ₹3.2 L+₹19,483.04 (6.55%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S.REGHU L5 | JIJIL KUMAR R L6 | S. RAJENDRAN L4 | Babu Wills J W L8 | SAJU K L3 | Jeethesh S Nair L1 | SURESHKUMAR K L9 | CHANDRA MOHANAN R L7 | K MURUKAN L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Building maintenance | ||||||||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 4.28 | cum | 1,632 ₹6,989.86 | 1,698 ₹7,272.53 | 1,959.45 ₹8,392.32 | 1,500 ₹6,424.5 Lowest | 1,568.21 ₹6,716.64 | 2,101 ₹8,998.58 | 1,785.28 ₹7,646.35 | 1,698.19 ₹7,273.35 | 1,552.32 ₹6,648.59 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.2 | cum | 2,814 ₹3,376.8 | 2,927 ₹3,512.4 | 3,378.14 ₹4,053.77 | 2,650 ₹3,180 Lowest | 2,703.63 ₹3,244.36 | 3,333 ₹3,999.6 | 3,077.86 ₹3,693.43 | 2,927.72 ₹3,513.26 | 2,676.24 ₹3,211.49 |
| 1.00 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 4.2 | sqm | 306 ₹1,285.2 | 319 ₹1,339.8 | 409.37 ₹1,719.35 | 220 ₹924 Lowest | 294.86 ₹1,238.41 | 357 ₹1,499.4 | 335.68 ₹1,409.86 | 319.3 ₹1,341.06 | 291.88 ₹1,225.9 |
| 1.00 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 97 | sqm | 104 ₹10,088 | 108.4 ₹10,514.8 | 139.26 ₹13,508.22 | 98 ₹9,506 | 100.3 ₹9,729.1 | 21 ₹2,037 Lowest | 114.19 ₹11,076.43 | 108.62 ₹10,536.14 | 99.29 ₹9,631.13 |
| 1.00 | 16.84:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.) | 97 | sqm | 348 ₹33,756 | 361 ₹35,017 | 464.46 ₹45,052.62 | 350 ₹33,950 | 334.55 ₹32,451.35 | 412 ₹39,964 | 380.86 ₹36,943.42 | 362.27 ₹35,140.19 | 331.16 ₹32,122.52 Lowest |
| 1.01 | 16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 10.8 | sqm | 914 ₹9,871.2 | 950 ₹10,260 | 1,219.1 ₹13,166.28 | 1,100 ₹11,880 | 878.11 ₹9,483.59 | 1,204 ₹13,003.2 | 999.66 ₹10,796.33 | 950.89 ₹10,269.61 | 869.22 ₹9,387.58 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | 7,080 ₹4,248 | 7,363 ₹4,417.8 | 9,441.22 ₹5,664.73 | 6,394 ₹3,836.4 Lowest | 6,800.51 ₹4,080.31 | 8,333 ₹4,999.8 | 7,741.8 ₹4,645.08 | 7,364.15 ₹4,418.49 | 6,731.59 ₹4,038.95 |
| 1.01 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 57.6 | sqm | 43.3 ₹2,494.08 | 45 ₹2,592 | 57.76 ₹3,326.98 | 40 ₹2,304 | 41.6 ₹2,396.16 | 26 ₹1,497.6 Lowest | 47.36 ₹2,727.94 | 45.05 ₹2,594.88 | 41.18 ₹2,371.97 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 57.6 | sqm | 263.5 ₹15,177.6 | 273 ₹15,724.8 | 351.43 ₹20,242.37 | 250 ₹14,400 | 253.13 ₹14,580.29 | 226 ₹13,017.6 Lowest | 288.17 ₹16,598.59 | 274.11 ₹15,788.74 | 250.57 ₹14,432.83 |
Tender Value
₹4.2 L
EMD Value
₹10,586
Closing Date
11 Sept 2026, 5:00 pmClosed
Assistant Engineer
O/o the AEE,Athiyannoor BP
Rennovation of Vizhinjam CHC
2026_LSGD_867236_4
01/AE/LSGD/ATR/26-27
Open Tender
Civil Works - Buildings
Item Rate
120 days
Athiyannoor BP
Please refer Tender documents.
8 documents required · 8 mandatory
₹935
Yes
₹10,586
Yes
16 Sept 2026
3 Sept 2026
15 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building maintenance | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.002 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.003 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | - | sqm | - | - |
| 1.004 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | sqm | - | - |
| 1.005 | 16.84:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.) | - | sqm | - | - |
| 1.006 | 16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | - | sqm | - | - |
| 1.007 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.008 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | - | - |
| 1.009 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | - | sqm | - | - |
stage.html
html • 0.03 MB
finance_1468485.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.03 MB
BOQ_1468485.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .