| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹5.0 L+₹5,084.72 (1.01%)Accepted-AOC | ₹5.0 L+₹5,084.72 (1.01%) Quoted ₹5.1 L | L2 | Accepted-AOC Won the bid in lottery process |
| 2 | L1₹5.0 LRejected-AOC | ₹5.0 L | L1 | Rejected-AOC Not win in lottery process |
| 3 | L1₹5.0 LRejected-AOC ODISHA OB | BALESHWAR | ODISHA | 756001 | ₹5.0 L | L1 | Rejected-AOC Not win in lottery process |
| 4 | L1₹5.0 LRejected-AOC | ₹5.0 L | L1 | Rejected-AOC Not win in lottery process |
| 5 | L1₹5.0 LRejected-AOC AT DHATIADIHA PO SALACHUA PS MAHULADIHA DIST MAYURBHANJ PIN 757038 | DHATIADIHA | MAYURBHANJ | ODISHA | 757038 | ₹5.0 L | L1 | Rejected-AOC Not win in lottery process |
Tender Value
₹5.1 L
EMD Value
₹5,085
Closing Date
30 May 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, ANANDPUR
Annual maintenance of Firm office Building at Gohira for the year 2026-27
2026_CERWI_129750_1
03/EE/RW/AND/2026-27
Open Tender
Civil Works - Buildings
Percentage
30 days
Salapada
Please refer tender documents
2 documents required · 2 mandatory
₹4,000
₹5,085
Yes
23 Aug 2026
25 May 2026
1 Jun 2026
25 May 2026
30 May 2026
25 May 2026
25 May 2026 - 29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing 2.5 cm thick AS flooring including stacking the useful materials for reuse and removing the debris within 50 m lead etc complete | 107.03 | sqm | 117.9 | ₹12,618.84 |
| 2 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and stacking the useful materials for reuse and removing the debris within 50m lead. | 14.63 | sqm | 58.95 | ₹862.44 |
| 3 | Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50 m lead etc complete | 90.39 | sqm | 132.65 | ₹11,990.23 |
| 4 | Earthwork in excavation of foundation in all kinds of soil including dressing and levelling the bed to required depth and width and deposting the excavated materials away from work site as directed by Engineer in charge. | 21.02 | cum | 282.89 | ₹5,946.35 |
| 5 | Filling in foundation and plinth with sand well watered and rammed including cost conveyance and royalty etc. complete. | 10.9 | cum | 579.18 | ₹6,313.06 |
| 6 | Cement Concrete (1:3:6) with 4cm size hard granite metal in Foundation and Plinth. | 23.6 | cum | 6,771.21 | ₹1,59,800.56 |
| 7 | Cement Concrete (1:2:4) with 12mm size hard granite chips | 13.49 | cum | 8,376.46 | ₹1,12,998.45 |
| 8 | 2.5cm thick grading concrete (1:2:2) on roof slab using 6mm size hard granite chips on new work including providing chicken mesh. etc complete as per direction of the Engineer-in-Charge | 90.39 | sqm | 454.09 | ₹41,045.2 |
| 9 | 16mm thick cement plaster (1: 6) for brick work etc complete as per direction of the Engineer-in-Charge | 14.63 | sqm | 278.39 | ₹4,072.85 |
| 10 | Fixing chequred tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. | 39.28 | sqm | 1,060.87 | ₹41,670.97 |
stage.html
html • 0.22 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592471.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.07 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_592471.xls
BOQ • 0.26 MB
Corrigendum.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .