| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC | ₹4.5 Cr Quoted ₹4.6 Cr | L1 | Accepted-AOC First Lowest |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹9.7 L
Closing Date
8 Apr 2025, 2:00 pmClosed
SE Irrigation Works Circle Varanasi
SE Irrigation Works Circle Varanasi
Upstream and Downstream treatment of Masonry joints, Drilling and Grouting of Masonry Dam structure of Chandraprabha Dam.
2025_UPIDC_1021774_3
10/SE/2024-25
Open Tender
Civil Works
Item Rate
210 days
Hinautghat Chandraprabha Dam Chandauli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹9.7 L
6 May 2025
3 Apr 2025
8 Apr 2025
3 Apr 2025
8 Apr 2025
3 Apr 2025
Amount
Desiltation by mechanical/ manual means, including engaging Divers ,equipments and disposal of silt to other upstream part of dam as directed by Engineer- in-charge. (Under Water Works)
Flush Pointing on upstream face : Raking, cleaning and pointing of Masonry joints with anti-shrink materials using high strength cementitious materials conforming to BIS/ EN-1504-3, Class R4 standard for masonry joint filling to a depth of 5 cm including preparing of flush joint of masonry by removing of existing loose portion of masonry by breaking (using manual /mechanical mix), cleaning with water jet under pressure for removing algae/ fungi, applying bond coat before repair material application and top coat after finishing, complete as per specification including cost of divers and diving equipments, cement materials, machinery, labour, under water divers,working platform,scaffolding, with all leads and lifts as directed by the Engineer-in-Charge. (Under Water Works)
Filling the deeper cavities or loose material area inside the masonry joints of upstream face which are beyond 5cm and upto 30cm using cementitious 1:2 (1 of OPC 53 grade cement, 2 of coarse sand) cement mortar mixed with admixture (10% by weight of Cement) wherever required using racking tools, complete as per specification including cost of divers and diving equipments, cement materials, machinery, labour, under water divers,working platform,scaffolding, with all leads and lifts as directed by the Engineer-in-Charge. (Under Water Works)
Fixing of G.I. grout nozzles of 12.5 mm dia and 300 mm length by drilling holes of dia 16 mm,cutting and sealing (after grouting) 3 Nos. per sqm. in spillway portion and 2 Nos. in wing wall portion in triangular pattern as per requirement on upstream face Including cost of all materials, machinery, curing, labour, scaffolding, with all leads and lifts as directed by Engineer in charge. (Under Water Works)
Pack grout filling the internal porous cavities greater than a depth of 30cm and upto 1 metre deep in the RR masonry of upstream face using micro concrete of 45 MPa strength under specified grout pressure of 4.00-6.00 kg/cm2 as directed through nozzles fixed as per requirement to reduce the porosity and to increase strength of masonry structure using grouting machine, mixer with all materials, machinery, labour etc. complete as per specification including cost of divers and diving equipments, cement materials, machinery, labour, under water divers, working platform, scaffolding, with all leads and lifts as directed by the Engineer-in-Charge. (Under Water Works)
T-Pointing on upstream face(including piers) above water level upto the top of spillway flood gates of Masonry dam with UV resistant and low shrink cementetious materials using crystalline technology (CT) conforming to BIS/ EN-1504-3, Class R4 standard for masonry joint filling to a depth of 5 cm including preparing of 'T' joint of masonry by raking out the stone masonry joints (using manual & mechanical means), cleaning with water jet under pressure for removing algae/ fungi, applying bond coat before repair material application and top coat after finishing, complete as per specification including cost of all materials, machinery, labour, scaffolding, transportation with all leads and lift and lifts as directed by the Engineer-in-Charge. (Above Water Works)
T-Pointing on upstream piers of Masonry dam above top of spillway flood gates to top level of Piers with cementitious 1:2 (1 of OPC 53 grade cement, 2 of coarse sand) cement mortar mixed with admixture (10% by weight of Cement) for masonry joint filling to a depth of 5 cm including preparing of 'T' joint of masonry by raking out the stone masonry joints (using manual/ mechanical means),cleaning with water jet under pressure for removing algae/ fungi, applying bond coat before repair material application and top coat after finishing, complete as per specification including cost of all materials, machinery, labour, scaffolding with all leads and lifts as directed by the Engineer-in-Charge. (Above Water Works)
Flush pointing on downstream face(including piers) of Masonry dam with cementitious 1:2 (1 of OPC 53 grade cement, 2 of coarse sand) cement mortar mixed with admixture (10% by weight of Cement) for masonry joint filling to a depth upto 5 cm,cleaning with water jet under pressure for removing algae/ fungi, applying bond coat before repair material application and top coat after finishing, complete as per specification including cost of all materials, machinery, labour, scaffolding, with all leads and lifts as directed by the Engineer-in-Charge. (Above Water Works)
Filling the deeper cavities or loose material area inside the masonry joints of upstream face which are beyond 5cm and upto 30cm using cementitious 1:2 (1 of OPC 53 grade cement, 2 of coarse sand) cement mortar mixed with admixture (10% by weight of Cement) wherever required using racking tools, complete as per specification including cost of divers and diving equipments, cement materials, machinery, labour, under water divers,working platform,scaffolding, with all leads and lifts as directed by the Engineer-in-Charge. (Above Water Works)
Fixing of G.I. grout nozzles of 12.5 mm dia and 300 mm length by drilling holes of dia 16 mm ,cutting and sealing (after grouting) 3 Nos. per sqm. in spillway portion and 2 Nos. in wing wall portion in triangular pattern on upstream face and downstream face including cost of all materials, machinery, curing, labour, scaffolding, with all leads and lifts as directed by Engineer in charge. (Above Water Works)
Pack grout filling the internal porous cavities greater than a depth of 30cm and upto 1 metre deep in the RR masonry of upstream face using micro concrete of 45 MPa strength under specified grout pressure of 4.00-6.00 kg/cm2 as directed as per requirement to reduce the porosity and to increase strength of masonry structure using grouting machine, mixer with all materials, machinery,labour etc. complete as per specification with all leads and lifts as per direction of Engineer in charge. (Above Water Works)
Drilling vertical and inclined holes in Masonry Dam body (main Dam) from top of the dam with diamond drills, at distance of 3 meter c/c staggered of dia 75 mm in triangular pattern and re-drilling wherever required, including cost of all materials, labour charges, hire charges of machinery etc. complete as directed by the Engineer-in-charge.
Cement grouting with stage grouting at 3m Intervals or as directed in the vertical and inclined drilled holes in the main dam starting from the bottom of drill hole using packers with (Cement, micro fine cement, silica, non shrink additives, water) mix under a pressure as per specification/ codes/ direction of the Engineer-in-charge and thickening the grout mix as required (as per specification/ appropriate methods by using admixture for increasing workability, including cost of all materials, hire charges of machinery, labour, platforms, scaffolding costs etc., complete and as directed by the Engineer-in-charge.(Measured in dry weight of mix)
Conducting field permeability tests in exploratory bore holes (through 07 Nos. of Bore holes before grouting and through 03 Nos. of bore holes after grouting) of various depths at different elevations of average 3m Interval, applying pressure as decided by the Engineer-in-charge. (both ascending and descending)
Engaging divers for indentifying the source of entry of water into upstream face of the dam with ROV and colour dye test etc. (Under Water Works)
Submission of inspection report of dam along with the live videography of under water works, photographs, videographs and with programme & methodology to carry out repair and rehabilitation work for stoppage of leakage through gate or structure.
Fixing & removal of stop log gates arrangement for removal of Irrigation sluice & scouring sluice gates including cost of all materials, machinery, labours etc. to complete the job as per direction of Engineer-in-charge.
Hiring of Diesel jeep/car with its driver and maintenance but excluding cost of diesel ( which is to be paid @1litre/10kms) for 24 hours and 1litre lubricant for 400 km. Vehicle shall be hired only after permission granted by EE’s to his junior officer.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ.xls
BOQ • 0.24 MB
Tenderdocument.pdf
Tender Documents • 2.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .