Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 CrAccepted-AOC | L1 | Accepted-AOC OK | |
| 2 | L2₹13.9 Cr+₹1.2 Cr (9.71%)Rejected-AOC AT AT VILL POST MIRPUR PATADH P S SARAI DIST VAISHALI BIHAR PIN 844116 | VAISHALI | BIHAR | 844116 | L2 | Rejected-AOC OK | |
| 3 | L3₹14.3 Cr+₹1.6 Cr (12.9%)Rejected-AOC H NO 73 OLD A G CO OPERATIVE SOCIETY KADRU RANCHI JHARKHAND 834002 | RANCHI | RANCHI | JHARKHAND | 834002 | L3 | Rejected-AOC OK | |
| 4 | L4₹14.4 Cr+₹1.7 Cr (13.6%)Rejected-AOC | L4 | Rejected-AOC OK | |
| 5 | L5₹14.5 Cr+₹1.8 Cr (14.1%)Rejected-AOC H O COLLEGE ROAD JASHPUR NAGAR CHHATISHGARH 496331 | JASHPUR | CHHATTISGARH | 496331 | L5 | Rejected-AOC OK |
| Sl No | Description | Qty | Unit | M/S MANTASHA CONSTRUCTION L8 | Shyam Bihari Yadav L1 | RNS CONSTRUCTION PRIVATE LIMITED L6 | BHARDWAJ TECHNOINFRA PRIVATE LIMITED L3 | MAHESH PRASAD GUPTA L7 | M/s Vinod Kumar Jain L5 | RAJAN SINGH L4 | GITA DEVI L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.001. Construction and Maintenance of Road L028-Serka to Jalim via Hanrup , Length-9.110 Km. Package no JH10MARS21 | |||||||||||
| 2.00 | Setting Out Pillars Providing & Fixing of Bench Mark Pillars @ four nos per km as per drawings given and direction of E/I | 9 | Per/Km | 4,400 ₹39,600 | 3,416 ₹30,744 Lowest | 4,000 ₹36,000 | 4,000 ₹36,000 | 4,343.6 ₹39,092.4 | 3,900 ₹35,100 | 3,910 ₹35,190 | 3,769.2 ₹33,922.8 |
| 3.00 | Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I | 8.2 | Ha | 63,469 ₹5,20,445.8 | 49,275.02 ₹4,04,055.16 Lowest | 57,699 ₹4,73,131.8 | 53,568 ₹4,39,257.6 | 62,655.44 ₹5,13,774.61 | 57,000 ₹4,67,400 | 56,400.86 ₹4,62,487.05 | 54,369.85 ₹4,45,832.77 |
| 4.00 | Compacting Original Ground :-- Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 10,932 | cum | 21.01 ₹2,29,681.32 | 16.31 ₹1,78,300.92 Lowest | 19.1 ₹2,08,801.2 | 19.1 ₹2,08,801.2 | 20.74 ₹2,26,729.68 | 18 ₹1,96,776 | 18.67 ₹2,04,100.44 | 18 ₹1,96,776 |
| 5.00 | Construction of subgrade and earthen shoulders with lead 250m to 500 m:-- Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with free lead as per Technical Specification Clause 303.1. Avg width = (10.20 +7.50/2) | 23,729.25 | cum | 108.27 ₹25,69,165.9 | 84.06 ₹19,94,680.76 Lowest | 98.43 ₹23,35,670.08 | 92 ₹21,83,091 | 106.89 ₹25,36,419.53 | 95 ₹22,54,278.75 | 96.22 ₹22,83,228.44 | 92.75 ₹22,00,887.94 |
| 6.00 | Excavation in Cutting in Soil by manual means with lead upto 50 m:-- Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 8,019.85 | cum | 158.04 ₹12,67,457.09 | 122.69 ₹9,83,955.4 Lowest | 143 ₹11,46,838.55 | 133 ₹10,66,640.05 | 156.01 ₹12,51,176.8 | 140 ₹11,22,779 | 140.44 ₹11,26,307.73 | 135.38 ₹10,85,727.29 |
| 7.00 | Construction of embankment with material obtained from road way cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 6,415.88 | Cum | 47.65 ₹3,05,716.68 | 37 ₹2,37,387.56 Lowest | 43 ₹2,75,882.84 | 41.11 ₹2,63,756.83 | 47.04 ₹3,01,803 | 40 ₹2,56,635.2 | 42.35 ₹2,71,712.52 | 40.82 ₹2,61,896.22 |
| 8.00 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a free lead as per Technical Specification Clause 301.5 | 24,407.81 | cum | 106.82 ₹26,07,242.26 | 82.93 ₹20,24,139.68 Lowest | 97 ₹23,67,557.57 | 89.11 ₹21,74,979.95 | 105.45 ₹25,73,803.56 | 95 ₹23,18,741.95 | 94.93 ₹23,17,033.4 | 91.51 ₹22,33,558.69 |
| 9.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250 m as per Technical Specification Clause 301.5 | 7,705.92 | Cum | 157.37 ₹12,12,680.63 | 122.17 ₹9,41,432.25 Lowest | 143 ₹11,01,946.56 | 132 ₹10,17,181.44 | 155.35 ₹11,97,114.67 | 140 ₹10,78,828.8 | 139.84 ₹10,77,595.85 | 134.81 ₹10,38,835.08 |
| 10.00 | Granular Sub-base with Well Graded Material (Table 400.1) By Mix in Place Method (Grading-II) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 5,480.19 | Cum | 2,234.09 ₹1,22,43,237.68 | 1,734.47 ₹95,05,225.15 Lowest | 2,030.99 ₹1,11,30,211.09 | 2,030.99 ₹1,11,30,211.09 | 2,205.45 ₹1,20,86,285.04 | 2,000 ₹1,09,60,380 | 1,985.29 ₹1,08,79,766.41 | 1,913.8 ₹1,04,87,987.62 |
Tender Value
₹14.7 Cr
EMD Value
₹29.6 L
Closing Date
28 Nov 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ENGINEER IN CHIEF
3RD FLOOR FFP BUILDING, DHURWA, RANCHI, JHARKHAND, 834004
Construction and Maintenance of Road and Bridges
2025_CEJHR_145492_57
NIT-02 2025-26 PMJANMAN
Open Tender
Civil - Roads and Bridges
Item Rate
545 days
GUMLA
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹29.6 L
2 Jun 2026
6 Nov 2025
28 Nov 2025
6 Nov 2025
28 Nov 2025
6 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Construction and Maintenance of Road L028-Serka to Jalim via Hanrup , Length-9.110 Km. Package no JH10MARS21 | - | - | - | - |
| 2 | Setting Out Pillars Providing & Fixing of Bench Mark Pillars @ four nos per km as per drawings given and direction of E/I | 9 | Per/Km | 4,000 | ₹36,000 |
| 3 | Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I | 8.2 | Ha | 57,699.09 | ₹4,73,132.54 |
| 4 | Compacting Original Ground :-- Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 10,932 | cum | 19.1 | ₹2,08,801.2 |
| 5 | Construction of subgrade and earthen shoulders with lead 250m to 500 m:-- Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with free lead as per Technical Specification Clause 303.1. Avg width = (10.20 +7.50/2) | 23,729.25 | cum | 98.43 | ₹23,35,670.08 |
| 6 | Excavation in Cutting in Soil by manual means with lead upto 50 m:-- Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 8,019.85 | cum | 143.67 | ₹11,52,211.85 |
| 7 | Construction of embankment with material obtained from road way cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 6,415.88 | Cum | 43.32 | ₹2,77,935.92 |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a free lead as per Technical Specification Clause 301.5 | 24,407.81 | cum | 97.11 | ₹23,70,242.43 |
| 9 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250 m as per Technical Specification Clause 301.5 | 7,705.92 | Cum | 143.06 | ₹11,02,408.92 |
| 10 | Granular Sub-base with Well Graded Material (Table 400.1) By Mix in Place Method (Grading-II) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 5,480.19 | Cum | 2,030.99 | ₹1,11,30,211.09 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.45 MB
BOQ_225750.xls
BOQ • 0.37 MB
JH-10-PMJANMAN-GUM-02-2025-26.pdf
Tender Documents • 12.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .