Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 CrAccepted-AOC | ₹16.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹17.3 CrRejected-AOC | ₹17.3 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not prequalified |
Tender Value
₹16.2 Cr
EMD Value
₹5 L
Closing Date
22 Sept 2020, 3:00 pmClosed
Superintending Engineer
Kerala Water Authority, PH Circle Kalmandapam Palakkad
Providing FHTCs (6898 Nos) and laying balance distribution system in Koppam Gramapanchayath.
2020_KWA_381287_1
25/20-21/SE/PHC/PKD
Open Tender
Civil Works - Others
300 days
Koppam
As per NIT
3 documents required · 3 mandatory
₹16,800
online
₹5 L
PH Circle Palakkad
4 Nov 2020
27 Aug 2020
24 Sept 2020
27 Aug 2020
22 Sept 2020
27 Aug 2020
27 Aug 2020 - 3 Sept 2020
4 Sept 2020
Amount
JJM 2020-21- Providing FHTCs (6898 Nos) and laying balance distribution system in Koppam Gramapanchayath.
Supplying ,laying ,testing,commissioning and maintenance of distribution system using 250mm to 200mm DI K9 pipe 160mm to 90mm PVC pipe, 150mm to 80mm GI pipes in koppam panchayath including all types of specials for laying, taking branch lines, providing control valves, scour valves, air valves, supplying and fixing of Electro magnetic flow meters, required type of joints possible in DI/PVC/GI/MS, providing MS fabricated pipe for road crossing through the casing pipe and providingFHTCs (6898Nos) including geotagging and construction of RCC pillar for supporting pipes at Erayur Koppam Thodu and all other works mentioned in NIT volume 2.(Scope of work). (It is the responsibility of the contractor to complete all works in the scope of work, successfully, trial run and commissioning and maintain the entire work done by him for the maintenance period of 12 months after commissioning and handing over the scheme to KWA. The defect liability period (guarantee period) is 24 months for electro mechanichal and electrical works from date of commissioning. The quoted amount shall be inclusive of all incidental charges, etc. for completion of all works in scope of work as per site conditions)
JB Engineering and construction company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid