Tender Value
₹1.2 L
EMD Value
₹1,200
Closing Date
26 Dec 2024, 5:00 pmClosed
SE EUDC
35-B RAMPUR GARDEN BAREILLY
ELECTRICAL WORK UNDER DEPOSIT SCHEME UNDER EUDD-I BAREILLY
2024_MVVNL_981009_1
T-57/EUDCB/2024-25
Open Tender
Electrical Works
60 days
EE EUDD-I BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹1,200
6 Feb 2026
7 Dec 2024
27 Dec 2024
7 Dec 2024
26 Dec 2024
7 Dec 2024
Amount
For the work of Giving new 67 KVA Multi Point Electric Connection to J.D. City Colony Budaun Road, Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
PCC Pole (8.5 Mtr. Long)
A.B. Cable (3X120 sqmm)
L.T Distrubution Box
Stay Set Complete
ACSR Weasal Conductor
ST Pole (11 Mtr.)
New 100 KVA T/F
Top Channel
S/s Base Angle
11 KV Disc Insulator With Fiting
11 KV Pin Insulator with Pin
M.S Erathing Rod
Erection Work
Erection of ST D/ Pole Structure (11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
Erection of PCC Pole (8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of A.B. Cable (3X120 sqmm)
Fixing of L.T. Distrubution Box alongwith making all connections.
Erection of Stay Set Complete alongwith grouting .
Mounting of New 100 KVA T/F on Newly Erected D/ Pole Struture alongwith making all coonections .
Chemical Erathing of 100 KVA T/F Body & Neautral ( All Materails shall be provide by Contractor.)
Erthing of Poles by MS Earhing Rod .
Laying of ACSR Weasal Conductor
Fixing of Top Channel
Fixing of 11 KV Pin Insulator With Pin
Fixing of 11 KV Disc Insulator With Fiting
Fixing of S/Station Base Angle .
Supply of Following Materials
LT Shakle Insulator with nut & Bolts .
Holding clamps with nut & Bolts
Al Lug (120 Sqmm)
Piercing Connector
Stone Pad
For the work giving 02 KW LMV-I Connction to Shri Dhrmendra Singh, City Enclave Colony, South City Road, Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
PCC Pole (8.5 Mtr. Long)
A.B. Cable (3X50 sqmm)
M.S Erathing Rod
Stay Set Complete
Erection Work
Erection of PCC Pole (8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of A.B. Cable (3X50 sqmm)
Erection of Stay Set Complete alongwith grouting .
Erthing of Poles by MS Earhing Rod .
Supply of Following Materials
LT Shakle Insulator with Clamps, Nut & Bolts .
Piercing Connector
For the work replecemnet of Damaged PCC Pole of Shri Rahul, at Ganesh nagar, Gali No. 09, Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
PCC Pole (8.5 Mtr. Long)
Erection Work
Erection of PCC Pole (8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
Supply & Fixing of Stone Pad
For the work of Shifting of LT Pole at Biharipur Civil Lines , By honorable MLA Cantt ,Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
PCC Pole (8.5 Mtr. Long)
A.B. Cable (3X120 sqmm)
M.S Erathing Rod
Erection Work
Erection of PCC Pole (8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
Laying A.B. Cable (3X120 sqmm)
Erthing of Poles by MS Earhing Rod .
Supply & Fixing of Piercing Connector
For the work of Shifting of LT Pole at Choupla Chouraha Near Pili Kothi ,Bareilly on request of Dy. Project Manager , U.P State Bridge Corporation Ltd. under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
ST . Pole (11 Mtr.)
M.S Erathing Rod
Stay Set Complete
Erection Work
Erection of ST Pole (11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
Erthing of Poles by MS Earhing Rod .
Erection of Stay Set Complete alongwith grouting .
LT Shakle Insulator with Clamps, Nut & Bolts .
PL ENTERPRISES (BID ID -4803470)
M/S HINA ELECTRICALS (BID ID -4815342)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid