Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | ₹1.9 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.1 Cr+₹13.2 L (6.80%)Rejected-Finance | ₹2.1 Cr+₹13.2 L (6.80%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.1 Cr+₹13.7 L (7.06%)Rejected-Finance RAMPUR UTTAR PRADESH | RAMPUR | UTTAR PRADESH | 244701 | ₹2.1 Cr+₹13.7 L (7.06%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.1 Cr+₹16.1 L (8.29%)Rejected-Finance E 315 1ST FLOOR SECTOR 27 NOIDA G B NAGAR 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹2.1 Cr+₹16.1 L (8.29%) | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.1 Cr
EMD Value
₹5.0 L
Closing Date
11 Jun 2026, 5:00 pmClosed
GM CIVIL
Main Administrative Building Sector-6 Noida
Development of Village ( C/o Shaded Kusti Maidan with Sports Activites Rooms in Vilalge Parthala, Sorkha and Sarfabad), Noida
2026_NOIDA_1157387_1
12/GM/SM-WC-6/2026-27
Open Tender
Civil Works
Fixed-rate
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹5.0 L
20 Jul 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line,water supply line,electric cable,telephone cable,gas pipe line etc,using utility decteting machine before start of excavation and shall start excavation only after getting permission of E/I.All kind of soil | 885 | Cum | 144.93 | ₹1,28,263.05 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 885 | Cum | 93 | ₹82,305 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand(zone-III): 10 graded stone aggregate 20mm nominal size). | 68 | Cum | 5,491.35 | ₹3,73,411.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size) | 31 | Cum | 6,753.45 | ₹2,09,356.95 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III): 3 graded stone aggregate 20mm nominal size). | 180 | Cum | 7,359.68 | ₹13,24,742.4 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III): 3 graded stone aggregate 20mm nominal size). | 41 | Cum | 8,239.9 | ₹3,37,835.9 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand). | 335 | Cum | 5,214.8 | ₹17,46,958 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations,footings,bases of,etc.for mass concrete. | 496 | Sqm | 181.64 | ₹90,093.44 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintel , beams, plinth beams, girders, bressumers and cantilevers | 335 | Sqm | 320.65 | ₹1,07,417.75 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. | 565 | Sqm | 426.85 | ₹2,41,170.25 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_2168756.xls
BOQ • 0.92 MB
Capability.xls
Additional Documents • 0.05 MB
TD.pdf
Tender Documents • 5.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .