Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
29 Jan 2026, 6:00 pmClosed
The Chief Officer, Kapadwanj Nagar Palika, Kapadwanj
Construction Work of C.C Road, Paver Block and Water Borewell Work at Different Location, KAPADWANJ Swarnim Jayanti Mukhyamantri Saheri Vikash yojana (SJMMSVY), Janbhagidari - MLA Grant, Year 2025-26
262208
12 / 2025-26
Open
Civil Works - Roads
Kheda
4 documents required · 4 mandatory
₹3,600
Yes
The Chief Officer, Kapadwanj Nagar Palika
₹1.9 L
Yes
7 Jan 2026
7 Jan 2026
7 Jan 2026
29 Jan 2026
7 Jan 2026
NAME OF WORK: - CONSTRUCTION WORK OF C.C ROAD, PAVER BLOCK
AND WATER BOREWELL WORK AT DIFFERENT LOCATION, KAPADWANJ
UNDER SWARNIM JAYANTI MUKYA MANTRI SAHERI VIKAS YOJANA
(SJMMSVY), JANBHAGIDARI GRANT AND MLA GRANT YEAR 2025-26
Total Volumes: 3 (Three)
Date of Issue: -……………….
Receipt No. of Tender Processing fee paid Amount: Rs. 3600/-
(Three Thousand Six Hundred Rupees only)
NAGAR SEVA SADAN
NAGAR SEVA SADAN
NAME OF WORK: - CONSTRUCTION WORK OF C.C ROAD, PAVER BLOCK
AND WATER BOREWELL WORK AT DIFFERENT LOCATION, KAPADWANJ
UNDER SWARNIM JAYANTI MUKYA MANTRI SAHERI VIKAS YOJANA
(SJMMSVY), JANBHAGIDARI GRANT AND MLA GRANT YEAR 2025-26
MILESTONE DATES
Online Downloading & Online
Submission of Tender:
Pre- Bid Conference Date: 21-01-2026 at 12:00 Hrs.
Due Date Online Tender Bidding: 29-01-2026 at 18:00 Hrs.
Physical Submission of Tender All tender documents, tender fees and EMD scan copies will
Fee, EMD and other Documents: be submitted to the online electronic format only, the
original tender fee, EMD and the signature and stamped
documents in the hard copy will be sent to the office of
Kapadvanj Nagar Seva Sadan by R.P.A.D./Speed Post/
Courier on Dated: - 06-02-2026 Till 18:00 Hrs.
Bid Opening Date: 10-02-2026 at 11.00 Hrs.
NAGAR SEVA SADAN
Name of Work: - Construction Work of C.C Road, Paver Block and Water Borewell Work at Different
Location, KAPADWANJ Swarnim Jayanti Mukhyamantri Saheri Vikash yojana (SJMMSVY),
Janbhagidari - MLA Grant, Year 2025-26
Description Total Amount
Description Total Amount
1.) Construction of C.C Road at Yogi Nagar Society Main Road, Kapadwanj ₹
Construction of C.C Road at Aakash Ganga Society Common Plot,
Construction of C.C Road at Pramukh Swami Society Main Road,
Construction Work of Paver Block at Giriraj Nagar Society Common Plot,
Construction Work of Paver Block at Uma Society Common Plot,
Construction Work of Paver Block at Jinwala Society Common Plot,
Construction Work of Paver Block at Road Side Kotiyark Society,
8.) Construction of C.C Road at Gayatri Nagar Society Main Road, Kapadwanj ₹
Construction Work of Paver Block at Navdurga Society Common Plot,
10.) Construction of C.C Road at Ratnagiri Society Road, Kapadwanj ₹
11.) Construction of C.C Road at Vrundavan Society Road, Kapadwanj ₹
12.) Construction of C.C Road at Jalaram Society Road, Kapadwanj ₹
13.) Construction of C.C Road at Somnath Society, Kapadwanj ₹
Construction Work of Paver Block at Arbuda Society Common Plot,
15.) Construction of C.C Road at Shaktinagr Society Dana Road, Kapadwanj ₹
16.) Construction of C.C Road at Madhavan Park Society Road, Kapadwanj ₹
Provision of Borewell with Pumping Machinery at Triveni Park Society,
18.) Construction of C.C Road at All Line Nirman Society, Kapadwanj ₹
Total Tender Amount = ₹
Name of Work: Construction Work of C.C Road work at Yogi Nagar Society Main Road,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Demolition and disposal of unserviceable materials with
all lead and lift. (i) Lime concrete.
* Lime Concrete 100.00 593.355 Cu.mt ₹
2.) Box cutting the road surface to proper slope and
chamber making base for road work including removing
the excavated stuff and depositing on the road side slope
as directed up to 50 m. lead.
* Box cutting the road 85.00 104.202 Cu.mt ₹
3.) Providing and laying cement concrete 1:3:6 (1-Cement:
3- coarse sand: 6- hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
4.) Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
5.) Providing & Laying M.S. Side rail of road thickness with
necessary nut bolt plates, fixing as per width, applying
plates vibrator, electric or diesel on channel comp. with
V.D. system (trimix) by using the necessary equipment’s
7 material & machinery such as running screed vibretor
on prelaid M.S. channel for levelling vaccum Pumps,
floating etc. complete.
* Trimix Process 680.00 85.000 Sq.mt. ₹
6.) Supplying promoulded bituminous joint filler. (i) 12mm
* Joints Filler 10.20 553.794 Sq.mt ₹
7.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole and
cover curing etc. complete including all carting and
providing of materials which is required for the purpose
(except manhole frame and cover) For All type of
manholes by providing RCC 1:2:4 Partition wall with
required reinforcement 25 cm thick and circular
opening with 500 mm clear Dia and 0.40 mt. av. ht.
* Raising Manholes 8.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
Name of Work: Construction Work of C.C Road work at Aakash Ganga Society Common Plot,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 53.00 104.202 Cu.mt ₹
2.) Providing and laying cement concrete 1:3:6
(1-Cement: 3- coarse sand: 6- hand broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in
(A) Foundation and Plinth
3.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced
concrete work in (A) Foundations, footings, Base of
columns and Mass concrete
4.) Providing & Laying M.S. Side rail of road thickness
with necessary nut bolt plates, fixing as per width,
applying plates vibrator, electric or diesel on
channel comp. with V.D. system (trimix) by using the
necessary equipment’s 7 material & machinery such
as running screed vibretor on prelaid M.S. channel
for levelling vaccum Pumps, floating etc. complete.
* Trimix Process 308.00 85.000 Sq.mt. ₹
5.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 3.00 553.794 Sq.mt ₹
6.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting
and providing of materials which is required for the
purpose (except manhole frame and cover) For All
type of manholes by providing RCC 1:2:4 Partition
wall with required reinforcement 25 cm thick and
circular opening with 500 mm clear Dia and 0.40 mt.
* Raising Manholes 1.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Add GST 18% = ₹
Total Net Amount = ₹
Name of Work: Construction Work of C.C Road work at Pramukh Swami Society Main Road,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Demolition and disposal of unserviceable materials
with all lead and lift.(i) Lime concrete.
* Lime Concrete 165.00 593.355 Cu.mt ₹
2.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base of columns
and Mass concrete
3.) Providing & Laying M.S. Side rail of road thickness
with necessary nut bolt plates, fixing as per width,
applying plates vibrator, electric or diesel on channel
comp. with V.D. system (trimix) by using the
necessary equipment’s 7 material & machinery such
as running screed vibretor on prelaid M.S. channel for
levelling vaccum Pumps, floating etc. complete.
* Trimix Process 1375.00 85.000 Sq.mt. ₹
4.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 20.63 553.794 Sq.mt ₹
5.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting
and providing of materials which is required for the
purpose (except manhole frame and cover) For All
type of manholes by providing RCC 1:2:4 Partition
wall with required reinforcement 25 cm thick and
circular opening with 500 mm clear Dia and 0.40 mt.
* Raising Manholes 5.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
Name of Work: Construction Work of Paver Block at Giriraj Nagar Society Common Plot,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 193.00 104.202 Cu.mt ₹
2.) Providing and laying cement concrete 1:3:6
(1- Cement: 3- Coarse sand: 6- Graded Brick bats
aggregate 40mm normal size) and curing complete
excluding cost of formwork in (A) Foundation and
3.) Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick with grade
of concrete M300 pneumatic compressed / vibrated
mechanically and as per approved design
Confirming to IS 15658: 2006 including 35 mm Sand
layer for levelling and filling the joint with sand in
proper line and level as per guidelines of IRC: SP 63-
2018 etc. Complete.
* Precast Paver Block 770.00 686.901 Sq. Mt. ₹
4.) Providing cement vata (10cm. x 10 cm. size) quarter
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete.
* Cement Vata 114.00 23.685 Rmt ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
Name of Work: Construction Work of Paver Block at Uma Society Common Plot, Kapadwanj
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 126.00 104.202 Cu.mt ₹
2.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- Coarse sand: 6- Graded Brick bats
aggregate 40mm normal size) and curing complete
excluding cost of formwork in (A) Foundation and
3.) Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick with grade
of concrete M300 pneumatic compressed / vibrated
mechanically and as per approved design
Confirming to IS 15658: 2006 including 35 mm Sand
layer for levelling and filling the joint with sand in
proper line and level as per guidelines of IRC: SP 63-
2018 etc. Complete.
* Precast Paver Block 630.00 686.901 Sq.mt. ₹
4.) Providing cement vata (10cm. x 10 cm. size) quarter
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete.
* Cement Vata 102.00 23.685 Rmt ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
Name of Work: Construction Work of Paver Block at Jinwalanagar Society Common Plot,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 60.00 104.202 Cu.mt ₹
2.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- Coarse sand: 6- Graded Brick bats
aggregate 40mm normal size) and curing complete
excluding cost of formwork in (A) Foundation and
3.) Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick with grade
of concrete M300 pneumatic compressed / vibrated
mechanically and as per approved design
Confirming to IS 15658: 2006 including 35 mm Sand
layer for levelling and filling the joint with sand in
proper line and level as per guidelines of IRC: SP 63-
2018 etc. Complete.
* Precast Paver Block 600.00 686.901 Sq.mt. ₹
4.) Providing cement vata (10cm. x 10 cm. size) quarter
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete.
* Cement Vata 100.00 23.685 Rmt ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
Name of Work: Construction Work of Paver Block at Road Side Kotiyark Society,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 78.00 104.202 Cu.mt ₹
2.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- Coarse sand: 6- Graded Brick bats
aggregate 40mm normal size) and curing complete
excluding cost of formwork in (A) Foundation and
3.) Providing and fixing pre-cast Rubber Dye / steel
Dye inter locking concrete block 60mm thick with
grade of concrete M300 pneumatic compressed /
vibrated mechanically and as per approved design
Confirming to IS 15658: 2006 including 35 mm
Sand layer for levelling and filling the joint with
sand in proper line and level as per guidelines of
IRC: SP 63-2018 etc. Complete.
* Precast Paver Block 390.00 686.901 Sq.mt. ₹
4.) Providing cement vata (10cm. x 10 cm. size) quarter
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete.
* Cement Vata 392.00 23.685 Rmt ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
Name of Work: Construction Work of C.C Road work at Gayatri Nagar Society Main Road,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Demolition and disposal of unserviceable materials
with all lead and lift. (i) Lime concrete.
* Lime Concrete 308.00 593.355 Cu.mt ₹
2.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base of columns
and Mass concrete
3.) Providing & Laying M.S. Side rail of road thickness
with necessary nut bolt plates, fixing as per width,
applying plates vibrator, electric or diesel on channel
comp. with V.D. system (trimix) by using the
necessary equipment’s 7 material & machinery such
as running screed vibretor on prelaid M.S. channel for
levelling vaccum Pumps, floating etc. complete.
* Trimix Process 2310.00 85.000 Sq.mt. ₹
4.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 34.65 553.794 Sq.mt ₹
5.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting
and providing of materials which is required for the
purpose (except manhole frame and cover) For All
type of manholes by providing RCC 1:2:4 Partition
wall with required reinforcement 25 cm thick and
circular opening with 500 mm clear Dia and 0.40 mt.
* Raising Manholes 11.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
Name of Work: Construction Work of Paver Block at Navdurga Society Common Plot,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 82.00 104.202 Cu.mt ₹
2.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- Coarse sand: 6- Graded Brick bats
aggregate 40mm normal size) and curing complete
excluding cost of formwork in (A) Foundation and
3.) Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick with grade
of concrete M300 pneumatic compressed / vibrated
mechanically and as per approved design
Confirming to IS 15658: 2006 including 35 mm Sand
layer for levelling and filling the joint with sand in
proper line and level as per guidelines of IRC: SP 63-
2018 etc. Complete.
* Precast Paver Block 406.00 686.901 Sq.mt. ₹
4.) Providing cement vata (10cm. x 10 cm. size) quarter
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete.
* Cement Vata 112.00 23.685 Rmt ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
SCHEDULE: - B10
Name of Work: Construction Work of C.C Road work at Ratnagiri Society Road, Kapadwanj
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Demolition and disposal of unserviceable materials
with all lead and lift. (i) Lime concrete.
* Lime Concrete 288.75 593.355 Cu.mt ₹
2.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 392.00 104.202 Cu.mt ₹
3.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- coarse sand: 6- hand broken stone
aggregates 40 mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and
4.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base of columns
and Mass concrete
5.) Providing & Laying M.S. Side rail of road thickness
with necessary nut bolt plates, fixing as per width,
applying plates vibrator, electric or diesel on channel
comp. with V.D. system (trimix) by using the
necessary equipment’s 7 material & machinery such
as running screed vibretor on prelaid M.S. channel for
levelling vaccum Pumps, floating etc. complete.
* Trimix Process 1680.00 85.000 Sq.mt. ₹
6.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 27.00 553.794 Sq.mt ₹
7.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting
and providing of materials which is required for the
purpose (except manhole frame and cover) For All
type of manholes by providing RCC 1:2:4 Partition
wall with required reinforcement 25 cm thick and
circular opening with 500 mm clear Dia and 0.40 mt.
* Raising Manholes 11.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
SCHEDULE: - B11
Name of Work: Construction Work of C.C Road work at Vrundavan Society Road, Kapadwanj
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 42.00 104.202 Cu.mt ₹
2.) BT Metal 25 to 40 MM & Aggregate 13.2 and down chips
& SD including conveyance
* GSB Work 42.00 885.134 Cu.mt ₹
3.) Spreading the stone aggregate for rolling and W.B.M.
including filling the interstices to required camber and
gradient (excluding spreading of Blindage) (iii) 25mm
to 50mm size crushed stone
* Labour Work for GSB Spreading 42.00 249.753 Cu.mt ₹
4.) Providing and laying cement concrete 1:3:6 (1-Cement:
3- coarse sand: 6- hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth
5.) Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork
and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
6.) Providing & Laying M.S. Side rail of road thickness with
necessary nut bolt plates, fixing as per width, applying
plates vibrator, electric or diesel on channel comp. with
V.D. system (trimix) by using the necessary
equipment’s 7 material & machinery such as running
screed vibretor on prelaid M.S. channel for levelling
vaccum Pumps, floating etc. complete.
* Trimix Process 420.00 85.000 Sq.mt. ₹
7.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 8.00 553.794 Sq.mt ₹
8.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting and
providing of materials which is required for the
purpose (except manhole frame and cover) For All type
of manholes by providing RCC 1:2:4 Partition wall with
required reinforcement 25 cm thick and circular
opening with 500 mm clear Dia and 0.40 mt. av. ht.
* Raising Manholes 3.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
SCHEDULE: - B12
Name of Work: Construction Work of C.C Road work at Jalaram Society Road, Kapadwanj
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 96.00 104.202 Cu.mt ₹
2.) BT Metal 25 to 40 MM & Aggregate 13.2 and down
chips & SD including conveyance
* GSB Work 48.00 885.134 Cu.mt ₹
3.) Spreading the stone aggregate for rolling and W.B.M.
including filling the interstices to required camber and
gradient (excluding spreading of Blindage) (iii) 25mm
to 50mm size crushed stone
* Labour Work for GSB Spreading 48.00 249.753 Cu.mt ₹
4.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- coarse sand: 6- hand broken stone
aggregates 40 mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and
5.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base of columns and
6.) Providing & Laying M.S. Side rail of road thickness with
necessary nut bolt plates, fixing as per width, applying
plates vibrator, electric or diesel on channel comp. with
V.D. system (trimix) by using the necessary
equipment’s 7 material & machinery such as running
screed vibretor on prelaid M.S. channel for levelling
vaccum Pumps, floating etc. complete.
* Trimix Process 480.00 85.000 Sq.mt. ₹
7.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 7.20 553.794 Sq.mt ₹
8.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting and
providing of materials which is required for the
purpose (except manhole frame and cover) For All type
of manholes by providing RCC 1:2:4 Partition wall with
required reinforcement 25 cm thick and circular
opening with 500 mm clear Dia and 0.40 mt. av. ht.
* Raising Manholes 2.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Add GST 18% = ₹
Total Net Amount = ₹
SCHEDULE: - B13
Name of Work: Construction Work of C.C Road work at Somnath Society, Kapadwanj
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Demolition and disposal of unserviceable materials
with all lead and lift. (i) Lime concrete.
* Lime Concrete 92.00 593.355 Cu.mt ₹
2.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 92.00 104.202 Cu.mt ₹
5.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- coarse sand: 6- hand broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth
6.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced
concrete work in (A) Foundations, footings, Base of
columns and Mass concrete
7.) Providing & Laying M.S. Side rail of road thickness
with necessary nut bolt plates, fixing as per width,
applying plates vibrator, electric or diesel on
channel comp. with V.D. system (trimix) by using
the necessary equipment’s 7 material & machinery
such as running screed vibretor on prelaid M.S.
channel for levelling vaccum Pumps, floating etc.
* Trimix Process 460.00 85.000 Sq.mt. ₹
8.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 6.90 553.794 Sq.mt ₹
9.) Renovation of manhole by increasing the hight at
top including cost of excavation, refitting of C.I.
manhole and cover curing etc. complete including
all carting and providing of materials which is
required for the purpose (except manhole frame
and cover) For All type of manholes by providing
RCC 1:2:4 Partition wall with required
reinforcement 25 cm thick and circular opening
with 500 mm clear Dia and 0.40 mt. av. ht.
* Raising Manholes 4.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
SCHEDULE: - B14
Name of Work: Construction Work of Paver Block at Arbuda Society Common Plot,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 68.00 104.202 Cu.mt ₹
2.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- Coarse sand: 6- Graded Brick bats
aggregate 40mm normal size) and curing complete
excluding cost of formwork in (A) Foundation and
3.) Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick with grade
of concrete M300 pneumatic compressed / vibrated
mechanically and as per approved design Confirming
to IS 15658: 2006 including 35 mm Sand layer for
levelling and filling the joint with sand in proper line
and level as per guidelines of IRC: SP 63-2018 etc.
* Precast Paver Block 675.00 686.901 Sq. mt. ₹
4.) Providing cement vata (10cm. x 10 cm. size) quarter
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete.
* Cement Vata 104.00 23.685 Rmt ₹
Total Amount = ₹
Total Amount = ₹
Add GST 18% = ₹
Total Net Amount = ₹
SCHEDULE: - B15
Name of Work: Construction Work of C.C Road work at Shaktinagr Society Dana Road,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Demolition and disposal of unserviceable materials
with all lead and lift. (i) Lime concrete.
* Lime Concrete 178.50 593.355 Cu.mt ₹
2.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 119.00 104.202 Cu.mt ₹
3.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- coarse sand: 6- hand broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth
4.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced
concrete work in (A) Foundations, footings, Base of
columns and Mass concrete
5.) Providing & Laying M.S. Side rail of road thickness
with necessary nut bolt plates, fixing as per width,
applying plates vibrator, electric or diesel on
channel comp. with V.D. system (trimix) by using the
necessary equipment’s 7 material & machinery such
as running screed vibretor on prelaid M.S. channel
for levelling vaccum Pumps, floating etc. complete.
* Trimix Process 1190.00 85.000 Sq.mt. ₹
6.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 28.88 553.794 Sq.mt ₹
7.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting
and providing of materials which is required for the
purpose (except manhole frame and cover) For All
type of manholes by providing RCC 1:2:4 Partition
wall with required reinforcement 25 cm thick and
circular opening with 500 mm clear Dia and 0.40 mt.
* Raising Manholes 5.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Add GST 18% = ₹
Total Net Amount = ₹
SCHEDULE: - B16
Name of Work: Construction Work of C.C Road work at Madhuvan park Society Road,
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) BT Metal 25 to 40 MM & Aggregate 13.2 and down
chips & SD including conveyance
* GSB Work 139.00 885.134 Cu.mt ₹
2.) Spreading the stone aggregate for rolling and W.B.M.
including filling the interstices to required camber
and gradient (excluding spreading of Blindage) (iii)
25mm to 50mm size crushed stone
* Labour Work for GSB Spreading 139.00 249.753 Cu.mt ₹
3.) Providing and laying cement concrete 1:3:6 (1-
Cement: 3- coarse sand: 6- hand broken stone
aggregates 40 mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and
4.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base of columns
and Mass concrete
5.) Providing & Laying M.S. Side rail of road thickness
with necessary nut bolt plates, fixing as per width,
applying plates vibrator, electric or diesel on channel
comp. with V.D. system (trimix) by using the
necessary equipment’s 7 material & machinery such
as running screed vibretor on prelaid M.S. channel for
levelling vaccum Pumps, floating etc. complete.
* Trimix Process 1382.00 85.00 Sq.mt. ₹
6.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 20.00 553.794 Sq.mt ₹
7.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting
and providing of materials which is required for the
purpose (except manhole frame and cover) For All
type of manholes by providing RCC 1:2:4 Partition
wall with required reinforcement 25 cm thick and
circular opening with 500 mm clear Dia and 0.40 mt.
* Raising Manholes 12.00 3880.100 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
SCHEDULE: - B17
Name of Work: Provision of Borewell with Pumping Machinery at Triveni Park
Society, Kapadwanj
Sr. Description Total Amount
No Quantity per
1.) Drilling of pilot bore hole of size 250 / 300 mm by
Mini DR rig including lowering of pipe assembly,
gravel packing, clay packing and development of 50.00 663.00 Rmt ₹
bore hole by washing.
2.) Providing 125 mm Dia UPVC pipes of ISI marked (IS
3.) Manufacture, supply and delivery of Cage type
trapezoidal shape ("V"') wire wound low carbon,
galvanized screen pipe and stainless-steel screen
pipes, confirming to IS: 8110 125 mm dia. LIGHT
(1.00 mm slot size)
4.) Providing clamp of size 450 mm x 65 mm x 10 mm
made from MS plate suitable for 125 mm Dia UPVC
pipes along with bolts & nuts of standard make & 1.00 687.07 No. ₹
5.) Providing UPVC End (Bottom) Cap Suitable to
mm Dia UPVC pipe. 1.00 397.24 No. ₹
6.) Providing well sorted gravel at site of work of size
ranging from 4 mm to 6 mm size. 0.74 2029.00 Rmt ₹
7.) Carrying out development of bore by air compressor
of 600 CFM / 150 PSI capacity till sand free discharge 1.00 3893.00 Hr. ₹
8.) Supply of Single-Phase Submersible Pump Set of
Category Q-3.1 I. e. 60 LPM @ 60 mtr. Head & 2 HP.
(MOC: Casing: CI-FG260, Impeller: Bronze & Shaft: 1.00 11782.00 No. ₹
9.) DOL / Star Delta starter suitable for local & remote
pump control application consisting of MPCB,
overload relay and contactors as per Type II
coordination including digital voltmeter, analogue
ammeter with selector switch, run hour meter, 1.00 6924.00 No. ₹
required protective relays & control
accessories. D. O. L. up to 3 HP
10.) Supply of 1 x 3 x 2.5 mm2 PVC insulated round
submersible cable as per detailed technical
specifications conforming to IS 694, IEC 60227 / 50.00 81.00 Rmt ₹
Sr. Total Amount
Description Quantity per
No Rate (in Rs.)
11.) Providing and supplying in standard length ISI mark
high density Polyethylene H.D.P.E. Pipes suitable for
potable water as per IS specification no. 4984/1995
including all local and central taxes, transportation, 50.00 81.00 Rmt ₹
freight charges, octroi, inspection charges, loading,
unloading, conveyance to the dept. stores etc.
comp.10.0 Kg/cm2 (50mm Dia)
12.) Lowering of single-phase submersible pump set
complete with required length of HDPE pipe & cable
in bore well and fitting of control panel board
including wiring work and satisfactory testing as per 1.00 700.00 Job ₹
instruction of Engineer-in-charge including carting
of material to site. up to 90 mtr.
13.) Lowering, Laying and jointing HDPE Pipe and
specials of following class and diameter (by butt
fusion welding method) including cost of conveyance
from stores to site of works at all level including cost 50.00 4.60 Rmt ₹
of labour, material, giving satisfactory hydraulic
testing etc. complete. (50 mm Dia)
Total Amount = ₹
Total Amount = ₹
Total Net Amount = ₹
SCHEDULE: - B18
Name of Work: Construction Work of C.C Road at All Line Nirman Society, Kapadwanj
Sr. Total Amount
Description Quantity Unit
No Rate (in Rs.)
1.) Demolition and disposal of unserviceable materials
with all lead and lift. (i) Lime concrete.
* Lime Concrete 444.00 593.35 Cu.mt ₹
2.) Box cutting the road surface to proper slope and
chamber making base for road work including
removing the excavated stuff and depositing on the
road side slope as directed up to 50 m. lead.
* Box cutting the road 296.00 104.20 Cu.mt ₹
3.) Providing and laying cement concrete 1:3:6 (1-Cement:
3- coarse sand: 6- hand broken stone aggregates
mm nominal size) and curing complete excluding cost
of formwork in (A) Foundation and Plinth
4.) Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base of columns and
5.) Providing & Laying M.S. Side rail of road thickness with
necessary nut bolt plates, fixing as per width, applying
plates vibrator, electric or diesel on channel comp. with
V.D. system (trimix) by using the necessary
equipment’s 7 material & machinery such as running
screed vibretor on prelaid M.S. channel for levelling
vaccum Pumps, floating etc. complete.
* Trimix Process 2960.00 85.00 Sq.mt. ₹
6.) Supplying promoulded bituminous joint filler. (i)
* Joints Filler 45.00 553.79 Sq.mt ₹
7.) Renovation of manhole by increasing the hight at top
including cost of excavation, refitting of C.I. manhole
and cover curing etc. complete including all carting and
providing of materials which is required for the
purpose (except manhole frame and cover) For All type
of manholes by providing RCC 1:2:4 Partition wall with
required reinforcement 25 cm thick and circular
opening with 500 mm clear Dia and 0.40 mt. av. ht.
* Raising Manholes 10.00 3880.10 Nos. ₹
Total Amount = ₹
Total Amount = ₹
Add GST 18% = ₹
Total Net Amount = ₹
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Volume-I_Technical_Bid.pdf
Volume-II_Specification.pdf
Volume-III_Price Bid.pdf
Download all tender documents and submit your bid