Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance MAIN ROAD RAMGARH CANTT 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 L+₹84,550 (29.6%)Admitted-Finance | ₹3.7 L+₹84,550 (29.6%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 L+₹1.5 L (51.1%)Admitted-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹4.3 L+₹1.5 L (51.1%) | L3 | Admitted-Finance |
| 4 | L4₹4.5 L+₹1.6 L (57.0%)Admitted-Finance 521 UBI ROAD SINGRAULI SINGRAULI SINGRAULI MADHYA PRADESH 486889 | SINGRAULI | MADHYA PRADESH | 486889 | ₹4.5 L+₹1.6 L (57.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Maa Chhinnamasta Electrical Works L2 | Rajneesh Electricals L3 | M.k. Traders L1 | Sandeep and Co. L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cost of copper strip DGC(SWG-8) | 260 | KG | 1,500 ₹3,90,000 | 1,350 ₹3,51,000 | 1,200 ₹3,12,000 Lowest | 1,400 ₹3,64,000 |
| 2.00 | Cost of insulating material | 1 | No. | 58,500 ₹58,500 | 52,650 ₹52,650 | 30,000 ₹30,000 Lowest | 54,600 ₹54,600 |
| 3.00 | Cost of Labour charge | 1 | No. | 58,500 ₹58,500 | 52,650 ₹52,650 | 20,000 ₹20,000 Lowest | 54,600 ₹54,600 |
| 4.00 | Less scrap value(60% of cost of SE copper wire) | 1 | No. | 2,34,000 ₹-2,34,000 | 2,10,600 ₹-2,10,600 | 2,02,800 ₹-2,02,800 Lowest | 2,18,400 ₹-2,18,400 |
| 5.00 | Profit | 1 | No. | 40,950 ₹40,950 | 24,570 ₹24,570 | 10,000 ₹10,000 Lowest | 25,480 ₹25,480 |
| 6.00 | Cost of Molding of coil | 72 | Coil | 600 ₹43,200 Lowest | 1,700 ₹1,22,400 | 1,325 ₹95,400 | 1,750 ₹1,26,000 |
| 7.00 | Cover Housing work with men power and materials for welding and turning to bearing size with CI rod | 2 | No. | 6,500 ₹13,000 Lowest | 19,500 ₹39,000 | 10,500 ₹21,000 | 21,000 ₹42,000 |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - |
Tender Value
₹4.8 L
EMD Value
₹6,100
Closing Date
12 Jun 2026, 9:00 amClosed
Project Engineer EnM Bhurkunda Colliery
Office Of Project Engineer EnM Bhurkunda Colliery
Rewinding and repairing of 325 KW/435HP, 3.3KV 1490 RPM Induction motor make GEC Sl no-183002/3 of Bhurkunda Colliery under Barka-Sayal Area.
2026_CCL_360361_1
PE(EnM)/BHK/e Tender/26-27/07
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Office Of Project Engineer EnM Bhurkunda Colliery
Please refer tender documents.
2 documents required · 2 mandatory
₹6,100
2 Sept 2026
27 May 2026
13 Jun 2026
28 May 2026
12 Jun 2026
28 May 2026
28 May 2026 - 3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of copper strip DGC(SWG-8) | 260 | KG | 1,239.9 | ₹3,22,374 |
| 2 | Cost of insulating material | 1 | No. | 48,356.1 | ₹48,356.1 |
| 3 | Cost of Labour charge | 1 | No. | 48,356.1 | ₹48,356.1 |
| 4 | Less scrap value(60% of cost of SE copper wire) | 1 | No. | 1,93,424.4 | ₹1,93,424.4 |
| 5 | Profit | 1 | No. | 22,566.18 | ₹22,566.18 |
| 6 | Cost of Molding of coil | 72 | Coil | 1,661.7 | ₹1,19,642.4 |
| 7 | Cover Housing work with men power and materials for welding and turning to bearing size with CI rod | 2 | No. | 21,029.1 | ₹42,058.2 |
| 8 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_373229.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .