| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -0.65% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 L+₹3,754.84 (2.11%)Admitted-Finance NAZRUL SARANI ASHRAMPARA SILIGURI | SILIGURI | COOCH BEHAR | WEST BENGAL | +1.45% | ₹1.8 L+₹3,754.84 (2.11%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 L+₹6,436.88 (3.62%)Admitted-Finance | +2.95% | ₹1.8 L+₹6,436.88 (3.62%) | L3 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹4,000
Closing Date
2 Mar 2026, 12:00 pmClosed
D.G (UTTARAN)
4, DIAMOND PARK, KOLKATA-700104
CONSTRUCTION OF COVER SLAB OVER SURFACE DRAIN AT DHALIPARA NAZRUL SARANI BYE LANE NEAR PRE. NO.-3/3 IN WARD NO.-143.
2026_KMC_1012385_1
KMC/E.E.(C)/XVI/ 143/058/25-26
Open Tender
CIVIL WORKS
Percentage
30 days
WARD-143
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹4,000
30 Jun 2026
21 Feb 2026
5 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 11.2 | M3 | 6,047 | ₹67,726.4 |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 92.8 | SQM | 335 | ₹31,088 |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. | 0.88 | MT | 58,249 | ₹51,212.52 |
| 4 | Sub Total | - | - | - | - |
| 5 | GST 18% | - | Nos. | - | - |
| 6 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
TENDER_FORM.pdf
Tender Documents • 0.61 MB
BOQ_2486153.xls
BOQ • 0.24 MB
CIVIL_new.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .