Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39,991.16Admitted-Fee/PreQual/Technical/Finance | -5.55% | ₹39,991.16 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹41,494.27+₹1,503.11 (3.76%)Admitted-Fee/PreQual/Technical/Finance 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | -2.00% | ₹41,494.27+₹1,503.11 (3.76%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹42,341
EMD Value
₹1,059
Closing Date
15 Sept 2026, 10:00 amClosed
GIREESH A
OFFICE OF ASSISTANT ENGINEER OFFICE CHEACODE GP
Annual PlanCheacode GP 2026 27 Project No321 27Thondipparamp Public Well Renovation Ward 04General Civil Work
2026_LSGD_867713_23
TN1AELIDEWCHEACODE26 27
Open Tender
Civil Works - Roads
Percentage
CHEACODE GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹335
Yes
₹1,059
Yes
17 Sept 2026
8 Sept 2026
17 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Well Protection | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 7.41 | cum | 330.41 | ₹2,447.02 |
| 1.002 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.58 | cum | 8,483.41 | ₹21,895.68 |
| 1.003 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.33 | cum | 7,870.91 | ₹2,597.4 |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 9.61 | sqm | 354.69 | ₹3,407.86 |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 116.15 | kilogram | 103.26 | ₹11,993.13 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.24 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_1470105.xls
BOQ • 0.31 MB
AFDVT.pdf
Tender Documents • 0.23 MB
PAG.pdf
Tender Documents • 0.25 MB
FOT.pdf
Tender Documents • 0.24 MB
SBD.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .