Loading…
Loading…
Tender Value
₹6250 Cr
Closing Date
28 Jul 2025, 12:00 amClosed
Head Office, Vijayawada
Engineering, Design and Construction of Viaduct Length 46.23 kms (3 corridors) (including 20.16 Kms of Double Decker 4 Lane Flyover cum Metro Viaduct) and 42 Nos. Elevated Metro stations, etc., all as specified on EPC basis for Phase-1 of Visakhapatnam Metro Rail, at Visakhapatnam, Andhra Pradesh, India.
833493
APMRCL/PROC-VSKP/2025/CW/04
Works
Andhra Pradesh
12 Aug 2025
28 Jul 2025
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .