| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.7 LAccepted-Finance | ₹68.7 L | L1 | Accepted-Finance Being L1 bidder |
| 2 | L2₹85.8 L+₹17.1 L (24.9%)Accepted-Finance | ₹85.8 L+₹17.1 L (24.9%) | L2 | Accepted-Finance Being L2 bidder |
| Sl No | Description | Qty | Unit | BIJU P.N L1 | ASOKKUMAR SOMAN L2 |
|---|---|---|---|---|---|
| 1.00Boat Jetty | |||||
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 44.9 | cum | 11,579.61 ₹5,19,912.91 Lowest | 14,463.79 ₹6,49,409.71 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.8 | cum | 14,100.49 ₹1,38,184.8 Lowest | 17,612.56 ₹1,72,603.09 |
| 1.00 | OD22674/2023-2024:Driving down RCC piles of 300mm square in size to the required depth in line and levels and shifting the casted piles to the driving spot without damaging the pile with necessary lifting equipments placing in correct position to line and driving down to required depth with the help of driving equipment including hire charges for driving equipment, machinery,planks, fuels, labour charges etc complete as per the direction of the departmental officers at site | 168 | metre | 1,007.47 ₹1,69,254.96 Lowest | 1,258.4 ₹2,11,411.2 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 6,526.28 | kilogram | 124.11 ₹8,09,976.11 Lowest | 155.03 ₹10,11,768.57 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 42.45 | sqm | 1,061.21 ₹45,048.36 Lowest | 1,325.53 ₹56,268.75 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 153.3 | sqm | 426.32 ₹65,354.86 Lowest | 532.5 ₹81,632.25 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 190.68 | sqm | 842.23 ₹1,60,599.79 Lowest | 1,052 ₹2,00,599.57 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 39.47 | sqm | 1,113.44 ₹43,948.59 Lowest | 1,390.77 ₹54,895.08 |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 99.88 | kg | 155.01 ₹15,482.4 Lowest | 193.62 ₹19,338.77 |
Tender Value
₹63.6 L
EMD Value
₹50,000
Closing Date
20 Aug 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer Inland Navigation Division Kollam
GENERAL Infrastructure Facilities Reconstruction of boat jetty along TS canal at Veli in Thiruvananthapuram District - Reconstruction of boat jetty along TS canal at Veli in Thiruvananthapuram District - General Civil Work
2026_Irrig_856338_3
IRR/KP/TR/6764/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
270 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
7 Sept 2026
6 Aug 2026
22 Aug 2026
6 Aug 2026
20 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Boat Jetty | |||||
| 1.001 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.002 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | OD22674/2023-2024:Driving down RCC piles of 300mm square in size to the required depth in line and levels and shifting the casted piles to the driving spot without damaging the pile with necessary lifting equipments placing in correct position to line and driving down to required depth with the help of driving equipment including hire charges for driving equipment, machinery,planks, fuels, labour charges etc complete as per the direction of the departmental officers at site | - | metre | - | - |
| 1.004 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.4 | kilogram | - | - |
| 1.005 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.006 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.6 | sqm | - | - |
| 1.008 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - |
| 1.009 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1 | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1462386.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
NIT.pdf
Tender Documents • 0.05 MB
BIDDOC.pdf
Tender Documents • 7.80 MB
BOQ_1462386.xls
BOQ • 0.33 MB
CORRGENDMDATE.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .