Tender Value
₹48.7 L
EMD Value
₹50,000
Closing Date
7 Sept 2026, 5:00 pmClosed
Manager (PED)
STEEL INDUSTRIALS KERALA LTD.ATHANI P.O,THRISSUR- 680 581
NABARD-KFD- Achenkovil Division-Construction of Integrated Check Post at Kottavasal
2026_SILK_856106_5
SILK/PED/S-021/2026-27/551
Open Tender
Miscellaneous Works
Item Rate
540 days
Achenkovil
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
31 Aug 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
31 Aug 2026 - 7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.01 | 15.12.1
Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50
metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.02 | 15.17.2
Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats | - | kg | - | - |
| 1.03 | 15.2.1
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal
concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.04 | 15.23.1
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 1.05 | 15.3
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per
direction of Engineer -in-Charge | - | cum | - | - |
| 1.06 | 15.7.4
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as
per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.07 | 15.9.2 Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50
metres lead as per direction of Engineer -in- Charges:In cement mortar | 1 | cum | - | - |
| 1.08 | 15.60
Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | - | cum | - | - |
| 1.09 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
PROFILE.pdf
Additional Documents • 0.03 MB
BOQ_1467790.xls
BOQ • 0.39 MB
GCC.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .