| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-AOC | L1 | Accepted-AOC Lowest 1st | |
| 2 | L2₹18.9 L+₹1.8 L (10.2%)Rejected-AOC | L2 | Rejected-AOC Lowest 2nd |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
7 Dec 2023, 11:00 amClosed
SE EDC PILIBHIT
Near Roadways Pilibhit
Replacement of damage LT AB cable at different sites under EDC-Pilibhit in additional business Plan 2023-24.
2023_MVVNL_838235_2
T-36/EDCP/2023-24
Open Tender
Miscellaneous Works
Item Rate
90 days
Pilibhit/Puranpur
As per tender form
3 documents required · 3 mandatory
₹3,540
SE EDC
₹18,000
3 Apr 2024
25 Nov 2023
7 Dec 2023
25 Nov 2023
7 Dec 2023
25 Nov 2023
Amount
Safe carriage of following material from store centre-Pilibhit to different sites including loading unloading at both end under EDD-Puranpur distance up to 0-60 Km.
PCC Pole 11 Mtr.
AB Cable 3x120+1x95+1x16
LT Distribution Box 3 Phase
Other line material as stay set complete-53 set, Earthing complete-204 Nos. etc.
Erection of single PCC pole including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, I hook, nut, bolt washers would be provided by the contractor.
Erection of double Pole structure of 11 Mtr. PCC fitting of accessories and all required decentralized material shall be provided by the contractor at his own cost.
Concreting of PCC pole at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. brick, ballast, sand etc would be provided by the contractor.
Earthing of pole, (earthing rod provided by department and other required nut and bolts etc. provided by firm by at his on cost.
Opening, descend of damage LT AB cable from old pole and carriage of received back damage cable from site to store centre-Pilibhit
Laying of LT AB Cable of size 3x120+1x95+1x16 complete work in all respect.
Fixing of LT distribution box 3 Phase complete work in all respect.
Providing and fixing of suspension clamp with I hook complete work in all respect.
Providing and fixing I hook with Clamp complete work in all respect.
Providing and fixing of IPC complete work in all respect.
Carriage of received back dismantal damage cable from site to store-pilibhit
Safe carriage of following material from store centre-Pilibhit to different sites including loading unloading at both end under EDD-Pilibhit distance up to 0-35 Km.
AB Cable 3x120+1x95+1x16
Opening of damaged cable from Pole and laying AB Cable 3x120+1x95+1x16
Opening, descend of damage LT AB cable of pole and carriage of received back damage cable from site to store centre-Pilibhit
Laying of LT AB Cable 3x120+1x95+1x16 complete work in all respect.
M/S HINA ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .