Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.8 L+₹9,623.78 (2.07%)Rejected-Finance | L2 | Rejected-Finance Out of two bidders heigher rate quoted by Sri.ANEES K | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
Tender Value
₹4.7 L
EMD Value
₹11,642
Closing Date
15 Nov 2022, 11:00 amClosed
O/o Office of the Assistant Executive Engineer, Bu
O/o Office of the Assistant Executive Engineer, Buildings Sub Division Thalashery
GENERAL-Chirakkara School(Balance work)- Construction of Chirakkara Govt.HSS(Balance work)-General Civil Work
2022_PWD_526968_1
PWD/BLDG/TR/17768/2022_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thalassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,030
Yes
₹11,642
Yes
27 Feb 2023
9 Nov 2022
17 Nov 2022
9 Nov 2022
15 Nov 2022
9 Nov 2022
Amount
Construction of Building
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
OD147589/2022-2023:Laterite masonry with neatly dressed laterite stone of size 35x20x20 cm or nearest in size in cement mortar 1:6 for foundation and basement including all cost of materials,labour charges etc.
OD132477/2022-2023:Laterate masonry with neatly dressed laterate stone of size 35X20X20 cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
ANEES K
Bidder Name
ANEES K
JAVIS N H
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_760085.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .