| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 244 22 ONKAR NAGAR B TRI NAGAR TRI NAGAR NEW DELHI 110035 NORTH WEST DELHI DELHI 110035 INDIA | NORTH WEST DELHI | DELHI | 110035 | ₹1.5 Cr | L1 | Accepted-AOC Being lowest bonafide bid and reasonable |
| 2 | L2₹1.6 Cr+₹13.6 L (9.26%)Rejected-Finance | ₹1.6 Cr+₹13.6 L (9.26%) | L2 | Rejected-Finance Being not lowest |
| 3 | L3₹1.7 Cr+₹18.5 L (12.6%)Rejected-Finance 81 SAHAPUR MAIN ROAD PS BEHALA KOLKATA WB PIN 700038 | KOLKATA | WEST BENGAL | 700038 | ₹1.7 Cr+₹18.5 L (12.6%) | L3 | Rejected-Finance Being not lowest |
| 4 | Rejected-Technical 44B CIRCULAR GARDEN REACH ROAD KOLKATA 700 023 | KOLKATA | WEST BENGAL | 700023 | - | - | Rejected-Technical As mention in Technical Evaluation Report |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
2 Dec 2020, 6:00 pmClosed
CWE KOLKATA
HQ Commander Works Engineers Military Engineer Services National Library Avenue Alipore, Kolkata - 700 027
OUTSOURCING SERVICES FOR OPERATION OF VARIOUS LIFT INSTALLATIONS AT BMC CAMP AND HASTINGS AREA UNDER GE(C) KOLKATA
2020_MES_393013_1
8072/E8(E-17)/20-21
Open Tender
Electrical Maintenance Service
Item Rate
334 days
Kolkata-27
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
GE (C) KOLKATA
₹2.4 L
Yes
23 Dec 2020
6 Nov 2020
4 Dec 2020
6 Nov 2020
2 Dec 2020
20 Nov 2020
6 Nov 2020 - 12 Nov 2020
Amount
NOTE :The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. In case the overall quoted rates are less than to the overall minimum wages as mention in SCh 'A' notes and such quoted bid shall be consider as a non-bonafide bids and same shall be rejected during financial evaluation. The tenderers should keep in mind while quoting their offer. However contractor/bidder shall not be entitled to any compensation whatsoever for rejection of financial bids.
Outsourcing services for rescue to the trapped person( in case any failure of lift or in emerggency) from group of ectrically operated automatic passengers/ goods lift of building including reliever on Sundays & holidays by one Lift Operator Mate(Semi Skiled) per shift required for for servicing of rescue to the trapped personand icluding taking care form any pilfrerage/theft or damage to lift, daily cleaning and daily maintenance necessary of records & documents complete all as specified and directed. Qty Details :- Qty Details:- 01 no lift operator x 02 shifts ( Morning shift & Evening Shift) x15 nos Building x11 Month + 01 no lift operator x 01 shifts ( Night Shift) x 7 Nos Group Building x11 Month = 407 Each calendar month per 08 hours service(per Shift).
Wages including Variable Dearness Allowance
EPF Contribution of employer
ESIC Contribution of employer
Bonus Contribution of employer
Labous Welfare cess
Contractors overhead & profit
Total quoted unit rate of above item.
Note for item no 2 (including sub items): Details of tentative Group of Lift Installations in Building wise:- (A)Morning & Evening:-MD ACCN at BCM Camp (i) Building No –HV(Hooghly View), (ii) Building No - P1, (iii) Building No -P2, (iv) Building No -P3, (v) Building No -P 127, (vi) Building No -P-161, (vii) Building No -P-158, (viii) Building No - P-138 & P-160, (ix) Building No -P-173, (x) Building No -NP-1, (xi) Building No -NP-2, (xii) Building No -NP-3, (xiii) Building No - NP-4, (xiv) Building No -P-197 & (xv) Building No -P-198 & (B) Group of bldgs 07 Nos for Night shift:- (a) Group No.1 :-– HV(Hooghly View), (b) Group No.2 :-- P-1, P-2, P-3, (c) Group No.3:- P-127, P-161, (d) Group No 4:- P-158, P-138 & P-160, (e)Group No.5:- P-173, NP-1, (f)Group No.6:- NP-2, NP3 , NP-4 & P-197 (g) Group no -7 :- P-198 or as per direction of GE/Engg-in-charge
Outsourcing services for rescue to the trapped person( in case any failure of lift or in emerggency) from group of ectrically operated automatic passengers/ goods lift of building excluding on Sundays & holidays by one Lift Operator Mate(Semi Skiled) per shift required for for servicing of rescue to the trapped personand icluding taking care form any pilfrerage/theft or damage to lift, daily cleaning and daily maintenance necessary of records & documents complete all as specified and directed. Qty Details:- 01 no lift operator x 02 shifts ( Morning shift & Evening Shift) x3 Building x11 Month = 66 Each calendar month per 08 hours service(per Shift).
Wages including Variable Dearness Allowance
EPF Contribution of employer
ESIC Contribution of employer
Bonus Contribution of employer
Labous Welfare cess
Contractors overhead & profit
Total quoted unit rate of above item.
Details of tentative Group of Lift Installations in Building wise:- Note:-3 bldgs x 2 shift (morning & evening ) (excluding Sunday and Holiday for office bldgs ) shifts for OTM ACCN Bldg No. IGS, AFT, P-62
Note for item no 2 &3 (including sub items)::- (a) All above Group of group shall be operated in three shift per dayby Lift operator Mate or as directed by GE/Engg-in-Charge as per requirement of site requirement. (b) Irrespective of quoted rate against wage here-in-above , the tenderer/bidder shall be liable to pay unit quoted wage or minimum wages (as mention in Sch ‘A’note) whichever is higher to employee. Similarly the tenderer/bidder shall be liable to deposite/pay employer contribution towards EPF , employer contribution towards ESIC & Bonus quoted rate or liable amount as per Govt notification whichever is higher.
(c) DUTY TIME :- A normal working time of 08 hour shift as mentioned in PS. However, GE/Engg-in-Charge at his discretion may change the shift timings as per requirements and 1 shift or 2 shift installation may be late-night hours. The shift of 08 hours shall be continuous. The quoted rate shall be deemed to take into account such situations. (d) Operator will take all preventive measures as per code of practise of EI Rules as well as they should be insured for accident as per labour laws. The Department will not be responsible for any type of incident. (e) All the safety equipments and tools related to workmanship shall be provided by contractor without any extra cost. Contractor shall be provide T & P such as (Pipe wrench, pliers, line tester, test lamp, clamp meter) two set of uniforms to every operator, one No first aid box, cotton waste, wipping cloths to each installation under contract schedule, required log sheets of pumping sets and DG sets of all installations and sweeping instruments and the cost thereof deemed to be included in above quoted rate. (f) Lift operator mate shall be Semi Skilled. (g) The term & condition as specified in Sch 'A' Note & PS of tender document. Accordingly bidder should quoting their offer. (h) Unit rate shall be quoted one Lift operator mate per 08 hour service per Day for one calendar month. (i)The operator should have own conveyance and communication system like mobile etc. (j) Amount of bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, i.e proof of account payment. Similarly items/sub-items of ‘contribution towards EPF’ and ‘contribution towards ESIC’ shall also be payable after submission of valid & authentic document in support of proof of payment.
M/S SANKAR CONSTRUCTION
BKGL CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .