Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 CrAccepted-AOC ETTUMANOOR | ETTUMANOOR | KOTTAYAM | KERALA | L1 | Accepted-AOC First lowest | |
| 2 | L2₹17.1 Cr+₹1.1 Cr (6.68%)Accepted-AOC 3RD FLOOR 33 509 A KURIEKKAL TOWER EDAPPALLY TOLL PARUTHELIPALAM KOCHI 6820204 | KOCHI | ERNAKULAM | KERALA | 682020 | L2 | Accepted-AOC Second lowest | |
| 3 | L3₹19.2 Cr+₹3.2 Cr (20.0%)Accepted-AOC KANNUR | KERALA | 670001 | L3 | Accepted-AOC Third lowest | |
| 4 | L4₹19.3 Cr+₹3.4 Cr (21.0%)Accepted-AOC ANUGRAHA T C 9 1775 2 PATTANIKUNNU LANE SASTHAMANGALAM TRIVANDRUM 10 | TRIVANDRUM | THIRUVANANTHAPURAM | KERALA | 695010 | L4 | Accepted-AOC Fourth lowest |
Tender Value
₹17.8 Cr
EMD Value
₹5 L
Closing Date
20 May 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
O/o SE PWD Buildings South Circle TVPM
GENERAL-Mini Civil Station Annexe Chengannur-Construction of Mini Civil Station Annexe at Chengannur-Composite Work
2025_PWD_763450_1
TR/BL/2021/326_23_3_2/1
Open Tender
Civil Works - Buildings
Percentage
540 days
Alappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹19,518
Yes
₹5 L
Yes
31 Jul 2025
8 May 2025
23 May 2025
8 May 2025
20 May 2025
8 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A -Building Proper(Civil work) | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,260 | sqm | 15.4 | ₹19,404 |
| 1.002 | OD253668/2024-2025:Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured up to bottom of pile cap).Usage of cement-340kg/m3.Excess or less cement used as per design mix is not payable or recoverable separately. 700 mm dia piles | 1,965 | metre | 4,469.31 | ₹87,82,194.15 |
| 1.003 | OD309083/2024-2025:Vertical load testing (INITIAL) of piles in accordance with IS : 2911(Part -IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. compete as per specification & above 100MT and up to 200 MT-700mm dia. pile. | 3 | per test | 82,104.69 | ₹2,46,314.07 |
| 1.004 | OD311173/2024-2025:Vertical load testing (ROUTINE) of piles in accordance with IS 2911 (Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc, complete as per specification and the direction of engineer-in-Charge. The single pile above 100 MT and up to 300 MT capacity for the routine test, for 700 mm dia pile | 1 | per test | 48,262.53 | ₹48,262.53 |
| 1.005 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 794.91 | cum | 309.99 | ₹2,46,414.77 |
| 1.006 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 137.47 | cum | 111.04 | ₹15,265.11 |
| 1.007 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 556.44 | cum | 269.88 | ₹1,50,172.3 |
| 1.008 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 81.39 | cum | 548.87 | ₹44,671.98 |
| 1.009 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 128.03 | cum | 7,113.43 | ₹9,10,711.1 |
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
recovered-award.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tenderdocument.pdf
Tender Documents • 0.20 MB
Tenderdocument_2.pdf
Tender Documents • 0.17 MB
BOQ.xls
BOQ • 0.98 MB
Tenderdocument_3.pdf
Tender Documents • 0.17 MB
Tenderdocument_4.pdf
Tender Documents • 0.01 MB
Tenderdocument_5.pdf
Tender Documents • 0.01 MB
Tenderdocument_6.pdf
Tender Documents • 4.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .