| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.7 LAccepted-AOC | ₹10.7 L | 1 | Accepted-AOC k |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | MUHAMMAD AFSAL A L2 | SHAMSEER N L1 |
|---|---|---|---|---|---|
| 1.00Building works | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.48 | cum | 1,828.1 ₹2,698.28 | 1,711.76 ₹2,526.56 Lowest |
| 1.00 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 7.25 | cum | 847 ₹6,139.06 | 793.14 ₹5,748.68 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 66.9 | sqm | 331.4 ₹22,171.65 | 310.35 ₹20,763.35 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.18 | cum | 9,002.7 ₹10,632.19 | 8,429.86 ₹9,955.66 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 123.25 | kilogram | 96.5 ₹11,893.72 | 90.35 ₹11,135.73 Lowest |
| 1.01 | 9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding | 1,506.91 | kg | 194.8 ₹2,93,546.46 | 182.41 ₹2,74,875.82 Lowest |
| 1.01 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 161.59 | sqm | 330.7 ₹53,439.14 | 309.65 ₹50,037.58 Lowest |
| 1.01 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 19.25 | sqm | 630.2 ₹12,131.35 | 590.14 ₹11,360.2 Lowest |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 161.59 | sqm | 69.4 ₹11,214.62 | 64.98 ₹10,500.38 Lowest |
Tender Value
₹12.3 L
EMD Value
₹30,658
Closing Date
16 Feb 2026, 6:00 pmClosed
SUPERINTENDING ENGINEER
O/o SE, Kozhikode Corporation, [email protected]
Please refer Tender document
2026_LSGD_833339_1
PP/EG7/2025-26/SE/525
Open Tender
Civil Works - Others
Item Rate
365 days
Kozhikode Corporation
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹30,658
Yes
31 Aug 2026
9 Feb 2026
18 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building works | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.002 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | - | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 0.2 | sqm | - | - |
| 1.004 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.4 | kilogram | - | - |
| 1.006 | 9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding | 0.8 | kg | - | - |
| 1.007 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 0.6 | sqm | - | - |
| 1.008 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | - | sqm | - | - |
| 1.009 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 0.6 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1404357.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
FIP.pdf
Tender Documents • 0.01 MB
FOT.pdf
Tender Documents • 0.01 MB
PRELIMINARYAGREEMENTCOMMON.pdf
Tender Documents • 0.14 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1404357.xls
BOQ • 0.31 MB
ePay.pdf
Tender Documents • 0.01 MB
Affidavit.pdf
Tender Documents • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .