| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC 1 C NEPAL BHATTACHARJEE STREET KALIGHAT KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | ₹2.0 Cr | L1 | Accepted-AOC LI Bidder |
| 2 | L2₹2.0 Cr+₹2.0 L (1.00%)Rejected-Finance 17 23 K P ROY LANE KOLKATA 700 031 | KOLKATA | KOLKATA | WEST BENGAL | 700031 | ₹2.0 Cr+₹2.0 L (1.00%) | L2 | Rejected-Finance Higher Quoted Rate. |
| 3 | L3₹2.0 Cr+₹3.2 L (1.65%)Rejected-Finance IC 2 ASWANI NAGAR BAGUIHATI KOLKATA 700059 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700059 | ₹2.0 Cr+₹3.2 L (1.65%) | L3 | Rejected-Finance Highest Quoted Rate. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Inappropriate credential, credential value not supported and justified by the BOQ amount or Work Order value. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Insufficient Credential. |
Tender Value
Refer Docs
EMD Value
₹4 L
Closing Date
5 Apr 2025, 12:00 pmClosed
SE, PWD, Kolkata Electrical Circle
P-16, India Exchange Place Extn. KIT Building, 2nd Floor, Kolkata-700073
Temporary Electrical Installation and allied works at Madinat-Ul-Hujjaj Compound-Hajj House, Rajarhat, New Town, Kolkata in connection with the Haj Yatra-2025.
2025_WBPWD_827154_1
PWD/SE/KEC/NIT-23/24-25
Open Tender
ELECTRICAL WORKS ORG
Item Rate
7 days
Rajarhat, Newtown
Please refer Tender documents.
8 documents required · 8 mandatory
₹4 L
Office of the SE, PWD, Kolkata Electrical Circle
5 May 2025
13 Mar 2025
7 Apr 2025
13 Mar 2025
5 Apr 2025
17 Mar 2025
17 Mar 2025
Amount
TEMPORARY ELECTRICAL INSTALLATIONS: (Madinat-Ul-Hujjaj, Auditorium, Masjid to be considered as accommodation of Temporary Electrical installation as INSIDE and OUTSIDE including Air-conditioning. 38 days/ may change as per actual demand) Providing on hire basis following switches etc on wooden plank board or suitable angle iron frame incl. providing interconnection wiring with socketing earthing attachment etc & dismantling at the end of the function (with PWD approved materials). 500V, 300 amp TPNIC switch with re-wirable type main switch (for 3days)
500V, 300 amp TPNIC switch with re-wirable type main switch for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3 Nos. x 35 No of Days = 105 Nos)
500V, 200 amp TPNIC switch with re-wirable type main switch (for 3days)
500V, 200 amp TPNIC switch with re-wirable type main switch for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3 Nos. x 35 No of Days = 105 Nos)
500V, 100 amp TPNIC switch with re-wirable type main switch (for 3days)
500V, 100 amp TPNIC switch with re-wirable type main switch for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3 Nos. x 35 No of Days = 105 Nos)
500V, 15/30 amp TPNIC switch with re-wirable type main switch (for 3days)
500V, 15/30 amp TPNIC switch with re-wirable type main switch for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3 Nos. x 35 No of Days = 105 Nos)
250V, 15/30 amp DPIC switch with re-wirable type main switch (for 3days)
250V, 15/30 amp DPIC switch with re-wirable type main switch for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3 Nos. x 35 No of Days = 105 Nos)
Providing on hire basis following change over switches etc on wooden plank board or suitable angle iron frame incl. providing interconnection wiring with socketing earthing attachment etc & dismantling at the end of the function (with PWD approved materials). 500V, 200 amp 4P C/O switch. (3 Days)
500V, 200 amp 4P C/O switch for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 6 Nos. x 35 No of Days = 210 Nos)
Providing on hire basis following bus bar on wooden plank board or suitable angle iron frame incl. providing interconnection wiring with socketing earthing attachment etc & dismantling at the end of the function (with PWD approved materials). 500V, 150 - 400 amp TPN Bus bar Chamber with 4 (four) bars (3 Days)
500V, 150 - 400 amp TPN Bus bar Chamber with 4 (four) bars for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 5 Nos x 35 No of Days = 175 Nos)
Providing on hire basis 500V power BDB with isolating switch of following sizes on wooden plank board or suitable angle iron frame incl. providing interconnection wiring with socketing earthing attachment etc and dismantling at the end of function (with PWD approved materials) 250A control switch with 32A MCB switch per way for outgoings of 12way TPNDB (3 days)
250A control switch with 32A MCB switch per way for outgoings of 12way TPNDB for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 6 Nos. x 35 No of Days = 210 Nos)
62A control switch with 32A MCB switch per way for outgoings of 6way SPNDB (3 days)
62A control switch with 32A MCB switch per way for outgoings of 6way SPNDB for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 6 Nos. x 35 No of Days = 210 Nos)
Providing on hire basis 1.1 kV grade Aluminum conductor PVC armoured cable of following sizes incl. laying in trench (at least 230 mm below ground) incl. dismantling the same at the end of the function & mending good the damages. 3½ / 4 core 120 sqmm PVC armoured cable (3 Days)
3½ / 4 core 120 sqmm PVC armoured cable for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =95 mtr x 35 No of Days = 3325 Mtr)
3½ / 4 core 95 sqmm PVC armoured cable (3 Days)
3½ / 4 core 95 sqmm PVC armoured cable for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =150 mtr x 35 No of Days = 5250 Mtr)
3½ / 4 core 50 sqmm PVC armoured cable (3 Days)
3½ / 4 core 50 sqmm PVC armoured cable for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =250 mtr x 35 No of Days = 8750 Mtr)
3½ / 4 core 35 sqmm PVC armoured cable (3 Days)
3½ / 4 core 35 sqmm PVC armoured cable for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =1150 mtr x 35 No of Days = 40250 Mtr)
3½ / 4 core 25 sqmm PVC armoured cable (3 Days)
3½ / 4 core 25 sqmm PVC armoured cable for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =1050 mtr x 35 No of Days = 36750 Mtr)
4 core 16 sqmm PVC armoured cable (3 Days)
4 core 16 sqmm PVC armoured cable for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =1150 mtr x 35 No of Days = 40250 Mtr)
Finishing the end of following PVC armoured cable by crimping method incl. supplying & fixing solderless socket (dowels make), tape, anticorrosive paste & jointing materials and making connection 3-1/2 / 4 core 120 sqmm PVC armoured cable
3½ / 4 core 95 sqmm PVC armoured cable
3½ / 4 core 50 sqmm PVC armoured cable
3½ / 4 core 35 sqmm PVC armoured cable
3½ / 4 core 25 sqmm PVC armoured cable
4 core 16 sqmm PVC armoured cable
Providing on hire basis & fixing following single core PVC copper wire incl. dismantling the same per meter at the end of function (2X1.5/2.5/ 4sq mm + 1X1/ 1.5/2.5.5sq mm) (3 Days)
(2X1.5/2.5/ 4sq mm + 1X1/ 1.5/2.5.sq mm) wire for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =5000 mtr x 35 No of Days = 175000 Mtr)
(4X1.5/2.5/ 4 + 2 X1.5/2.5/4 sq mm) (3 Days)
Wire (4X1.5/2.5/ 4 + 2 X1.5/2.5/4 sq mm) for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =1500 mtr x 35 No of Days = 52500 Mtr)
Distribution wiring in 2x3/0.036 single core PVC copper wire with 5 A plug points. (Ave. run 3 mtr.) (3 Days)
Distribution wiring in 2x3/0.036 single core PVC copper wire with 5 A plug points for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =450 point x 35 No of Days = 15750 Point)
.-Do- 15 A -do-. (3 Days)
.-Do- 15 A -do- for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =150 point x 35 No of Days = 5250 Point)
S & providing on hire basis following light fitting complete with bracket & clamp on the pole incl. replacement of fused lamp (PWD approved) and dismantling at the end of function 200W LED/ Metal Halide Flood light fittings (3 Days)
200W LED/ Metal Halide Flood light fittings for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =415 nos x 35 No of Days = 14525 nos)
S & F 4'-0" LED tube fitting complete with tube on hire basis & dismantling (3 Days)
S & F 4'-0" LED tube fitting complete with tube on hire basis & dismantling for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =850 nos x 35 No of Days = 29750 nos)
S & F of 45W 230V LED bulb -do- (3 days)
S & F of 45W 230V LED bulb for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =320 nos x 35 No of Days = 11200 nos)
.Do- erection on hire basis 50mm dia 2.5mtr long G.I. pipe with 8 S.W.G GI earth wire approx length 4mtr. As G.S. and dismantling.
.Do- erection on hire basis 50mm dia 2.5mtr long G.I. pipe with 8 S.W.G GI earth wire approx length 4mtr. As G.S. and dismantling. for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =42 nos x 35 No of Days = 1470 nos)
S & F on hire basis 600mm sweep Air Circulator fan incl. dismantling. (3 Days)
S & F on hire basis 600mm sweep Air Circulator fan incl. dismantling for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =62 nos x 35 No of Days = 2170 nos)
S & F on hire basis 450mm sweep Pedestal fan incl. dismantling. (3 Days)
S & F on hire basis 450mm sweep Pedestal fan incl. dismantling for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =250 point x 35 No of Days = 8750 nos)
S & F on hire basis 1200mm sweep Ceiling fan complete set with down rod site required size & incl. dismantling. (3 Days)
S & F on hire basis 1200mm sweep Ceiling fan complete set with down rod site required size & incl. dismantling for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =850 point x 35 No of Days = 29750 nos)
S & F on hire basis No. 6 SWG GI continuous earth wire without earth clamp. (3 Days)
S & F on hire basis No. 6 SWG GI continuous earth wire without earth clamp for Next 35 Days after 3 Days.(@ 2% of the rate of first 3 days per day.) (Qty =575 Mtr x 35 No of Days = 20125 Mtr)
Deployment of 4 nos. Electrician (Semi skilled) & 6 nos. Helper per shift per day (i.e. Total 12 nos Electrician & 18 nos Helper per day for 24 Hrs) for carrying out all kind of EI maintenance & DG operations including operation of air conditioner etc. Electrician (Semi Skilled) 6 nos per shift for x 03 shifts x 38 days= 684 nos.
Helper (Un-Skilled) 8 nos per shift for x 03 shifts x 38 days= 912 nos
S & Providing on hire basis soundless 125KVA DG single set complete with out diesel and mobil as emergency standby or direction of EIC operation with operator guarding & transportation. (3 set x 38 days)
S & Providing on hire basis LED par light as per direction of EIC, operation with operator guarding & transportation for 3 days.
S & Providing on hire basis LED par light for Next 35 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 65 Nos x 35 No of Days = 2275 Nos)
S & providing on hire basis Tower type/split type AC machine complete with starter control units, refrigerant pipe lines, electrical connections, loading unloading, lifting & transportation charges.(720Tr. X 38 Days)
Supply & Pouring of HSD for the hired DG set incl handling cost (Actual consumption as per load demand) Allowable consumption of HSD per 125 kVA DG set per day 20 Ltrs per Hrs per DG set x 1 hrs 40 mins. per day on an average.
Mobil (as per technical data sheet & maintenance schedule)
ANAMICA ENTERPRISE (BID ID -6249469)
D.C.Eng.Co (BID ID -6297988)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .