Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC AT PO KORKORA DIST BHADRAK | L1 | Accepted-AOC Completed | |
| 2 | L1₹13.5 LRejected-Finance | L1 | Rejected-Finance Failed in lottery | |
| 3 | L1₹13.5 LRejected-Finance AT INCHUDI PO INCHUDI DIST BALASORE ODISHA | BALASORE | BALASORE | ODISHA | L1 | Rejected-Finance Failed in lottery | |
| 4 | L1₹13.5 LRejected-Finance AT NUAPADA PO RADHABALLAVPUR DIST BALASORE ODISHA | NUAPADA | BALASORE | ODISHA | L1 | Rejected-Finance Failed in lottery | |
| 5 | L1₹13.5 LRejected-Finance AT INCHUDI PO INCHUDI DIST BALASORE ODISHA | BALASORE | BALASORE | ODISHA | L1 | Rejected-Finance Failed in lottery |
Tender Value
₹15.9 L
EMD Value
₹15,875
Closing Date
5 Sept 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E, L.I DIVISION, BHADRAK
BHADRAK
INSTALLATION AND ENERGIZATION OF ALBEGA-III TW
2023_OLIC_92902_27
01/2023-24 (1442)/OLIC (BDK)/ Dt. 18.08.2023
Open Tender
Civil Works - Lift Irrigation Schemes
Turn-key
90 days
L.I DIVISION
AS PER MENTIONED IN DTCN
3 documents required · 3 mandatory
₹6,000
₹15,875
5 Jan 2024
25 Aug 2023
7 Sept 2023
25 Aug 2023
5 Sept 2023
25 Aug 2023
25 Aug 2023 - 5 Sept 2023
eProcurement System Government of Odisha Created By: NAROTTAMA SWAIN Created Date/Time: 07-Sep-2023 06:25 PM Tender Title: INSTALLATION AND ENERGIZATION OF ALBEGA-III TW Tender ID: 2023_OLIC_92902_27
Tender Inviting Authority: EXECUTIVE ENGINEER , L.I DIVISION, BHADRAK
Name of Work: Execution of Drilling & Civil works for energisation at Albega-III T.W L.I Project under Basudevpur Block in Bhadrak District.
Contract No:01/2023-24 (1442)/ OLIC (BDK) dt. 18.08.2023
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 LAKSHMIMANI GIRI(GSTN-21EDNPB6268P1Z2) 1587518.00 -14.99 1349549.06 Thirteen Lakh Fourty Nine Thousand Five Hundred and Fourty Nine
2.00 MAHASWETA DHADA(GSTN-21FQEPD7100P1Z0) 1587518.00 -6.99 1476550.50 Fourteen Lakh Seventy Six Thousand Five Hundred and Fifty
3.00 SASHINATH BEHERA(GSTN-21BTGPB7443G1Z3) 1587518.00 -14.99 1349549.06 Thirteen Lakh Fourty Nine Thousand Five Hundred and Fourty Nine
4.00 KAPIL JENA(GSTN-21ARMPJ1499D1ZW) 1587518.00 -14.99 1349549.06 Thirteen Lakh Fourty Nine Thousand Five Hundred and Fourty Nine
5.00 SUJATA PUSTI(GSTN-NA) 1587518.00 -14.99 1349549.06 Thirteen Lakh Fourty Nine Thousand Five Hundred and Fourty Nine
6.00 POWERTECH ENGINEERING.TAPAS RANJAN PATI(GSTN-NA) 1587518.00 -14.99 1349549.06 Thirteen Lakh Fourty Nine Thousand Five Hundred and Fourty Nine
Lowest Amount Quoted BY: LAKSHMIMANI GIRI,SASHINATH BEHERA,POWERTECH ENGINEERING.TAPAS RANJAN PATI,KAPIL JENA,SUJATA PUSTI(1349549.06)
BOQ Summary Details Tender Title: INSTALLATION AND ENERGIZATION OF ALBEGA-III TW Tender ID: 2023_OLIC_92902_27
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 LAKSHMIMANI GIRI 1349549.06 L1
2 SASHINATH BEHERA 1349549.06 L1
3 POWERTECH ENGINEERING.TAPAS RANJAN PATI 1349549.06 L1
4 KAPIL JENA 1349549.06 L1
5 SUJATA PUSTI 1349549.06 L1
6 MAHASWETA DHADA 1476550.50 L2
stage.html
html • 0.05 MB
techsummary_453758.pdf
PDF • 0.22 MB
finsummary_453758.pdf
PDF • 0.22 MB
AlbegaIIITW.pdf
PDF • 0.31 MB
finance_453758.pdf
PDF • 0.22 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .