Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
7 Mar 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Leak rectification of DH vaporisor at NP Plant, FACT CD
2026_FACT_899473_1
4096/2025-2026/E33133
Limited
Miscellaneous Works
Item Rate
20 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
Yes
9 Mar 2026
20 Feb 2026
9 Mar 2026
20 Feb 2026
7 Mar 2026
20 Feb 2026
Leak rectification of DH vaporisor at NP Plant, FACT CD
LEAK RECTIFICATION OF DH VAPOURISER IN NP PLANT: Work involves: The required tools, tackles, chain blocks, scaffolding, etc., shall be arranged. Necessary slip plates shall be fabricated and provided after getting process clearance at various locations, as per site conditions, for ensuring safe execution of the work. The inlet and outlet connections of the DH vaporizer shall be disconnected. Before loosening the dish end flange, the DH vaporizer tube sheet shall be securely locked with the shell flange. The dish end of the DH vaporizer shall be dismantled after all bolts and nuts are removed. If required, the tube bundle shall be tightened properly with the shell flange for pressure testing. Assistance will be provided for the arrangement of hydraulic and pneumatic pressure testing. Identified leaky tubes shall be plugged and TIG welded. Any additional tube leaks identified during further testing shall be rectified by plugging and TIG welding until successful completion of the testing. After receiving process clearance, the dish end shall be fixed back with a new gasket. The dish end shall be tightened properly to prevent any flange leaks. The inlet and outlet lines shall be connected with proper gaskets. All slip plates shall be removed, and the flanges shall be tightened with new gaskets. The DH vaporizer shall be returned to service without any leaks.
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_945441.xls
BOQ • 0.23 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.07 MB
Tenderdocuments.pdf
Tender Documents • 1.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .