Tender Value
₹18.8 Cr
EMD Value
₹37.6 L
Closing Date
14 Oct 2026, 3:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
PU/PRYJ
20 conditions · 8 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender
In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for 1.2: Separate completed works of minimum required values 1.2.1 shall also be considered for fulfillment of technical eligibility criteria for different components.
In such cases, what constitutes a component in a composite work shall 1.2.2 be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.
To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the 1.2.3 offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing.
Defination of Similar Work :- Design, Supply, Erection, Testing, Commissioning / Augmentation of EHV equipment of Electrical Sub Station of voltage level 66kV or above. O R Design, Supply, Erection, Testing, Commissioning of switching station (SSP/SP/FP) of 1 X25kV / 2X25 kV system on Indian railways/DFCC/Metro Rail/Port railway.
Firm shall submit Bid capacity according to GCC-2022 for evaluation of tender as the value of Tender is more than 10 crores. The Bid capacity of the tenderer shall be evaluated as per the GCC-2022 and its latest ACS upto date of closing of tender.
15 conditions · 3 needing a document upload
If the earnest money deposited by the bidder is in shape of Bank Guarantee, it should be supported by proper stamp duty, rate prescribed as per section 13 & 24 of the UP Stamp Act, 2008 and amended from time to time at the time of submission of bank Guarantee.
Please submit bank details of the firm / individual/ JV / partnership etc. i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number and other necessary & relevant documents.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening. IRGCC-2022 (works matter) is for reference only. Any correction issued by competent authority up to date of opening will be applicable. Tenderer should quote accordingly.
The work will be executed under supervision of Railway Engineer in-charge or his authorized representative at site.
The schedule of quantity is only approximate and may vary as per site condition. Any items may be added or deleted as directed by Engineer-in-charge to complete the work in all respect.
Contractor will issue identity cards to all his supervisors/laborers working at site as per Proforma given by Railway.
Supply, Erection, Testing and Commissioning for Providing additional sectioning arrangement in connection with Modification to increase speed to 160/200Kmph in CNB-DDU section over PRYJ Division of North Central Railway.
PRYJPU2627T06~NCR
PRYJPU2627T06
Open
Works - General
12 Months
Prayagraj, Uttar Pradesh
₹0
₹37.6 L
22 Sept 2026
22 Sept 2026
30 Sept 2026
204 items across 8 schedules · ₹10,90,83,927.42 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1(a) Preparation of designs and drawings for overhead equipment and verification of purchaser's pegging plan. (Kilometer = Track kilometer) | Kilometre | 5.00 | 9,344 | 46,720 |
| 2 | 1(b) Preparation of designs and drawings for switching stations (FP/SP/SSP) | Each | 4.00 | 16,051 | 64,204 |
| 3 | 8(b)(iii) Supply without Insulator of material for termination of all aluminum 25KV Feeder/return conductor (Single SPIDER) | Each | 50.00 | 3,043 | 1,52,150 |
| 4 | 8(b)(iii) Erection of material for termination of all aluminum 25KV Feeder/return conductor (Single SPIDER) | Each | 50.00 | 408 | 20,400 |
| 5 | 8(b)(ix) Supply without insulator of materials for termination of copper cross feeder with gantries. | Set | 100.00 | 2,895 | 2,89,500 |
| 6 | 8(b)(ix) Erection of materials for termination of copper cross feeder with gantries. | Set | 100.00 | 408 | 40,800 |
| 7 | 11(a)(i) Supply without Insulator of cut-in (9Tonne) Insulator | Each | 32.00 | 688 | 22,016 |
| 8 | 11(a)(i) Erection cut-in (9Tonne) Insulator | Each | 32.00 | 283 | 9,056 |
| 9 | 11(a)(ii) Supply without Insulator of a suspension (9Tonne) Insulator | Each | 150.00 | 713 | 1,06,950 |
| 10 | 11(a)(ii) Erection a suspension (9Tonne) Insulator | Each | 150.00 | 168 | 25,200 |
| 11 | 11(b) Supply without Insulator of 25 kV Post Insulator | Each | 50.00 | 515 | 25,750 |
| 12 | 11(b) Erection of 25 kV Post Insulator | Each | 50.00 | 112 | 5,600 |
| 13 | 18(b) Supply 25kV Vacuum type Interrupter | Each | 8.00 | 1,73,491 | 13,87,928 |
| 14 | 18(b) Erection of 25kV Vacuum type Interrupter | Each | 8.00 | 1,913 | 15,304 |
| 15 | 19 - Supply of 25kV Potential Transformers Type-I | Each | 178.00 | 44,466 | 79,14,948 |
| 16 | 19 - Erection of 25kV Potential Transformers Type-I | Each | 178.00 | 429 | 76,362 |
| 17 | 20(a) Supply of 42KV Lightning Arrestors (station class) | Each | 47.00 | 15,119 | 7,10,593 |
| 18 | 20(a) Erection of 42KV Lightning Arrestors (station class) | Each | 47.00 | 278 | 13,066 |
| 19 | 22(b) Supply of an Iron clad 230V A.C Fuse Box. | Each | 6.00 | 1,762 | 10,572 |
| 20 | 22(b) Erection of an Iron clad 230 V.A.C Fuse Box. | Each | 6.00 | 47 | 282 |
| 21 | 27(a) Supply of L.T. supply transformers (10kVA) | Each | 6.00 | 27,426 | 1,64,556 |
| 22 | 27(a) Erection, oil- filtration, testing and commissioning of L.T. supply transformers (10 kVA). | Each | 6.00 | 4,572 | 27,432 |
| 23 | 28- Supply without Insulator of 25 kV D.O. fuse switch. | Each | 6.00 | 4,934 | 29,604 |
| 24 | 28-Erection of 25 kV D.O. fuse switch. | Each | 6.00 | 239 | 1,434 |
| 25 | 31(e) Dismantling Feeder/Return Conductor | Each | 3.00 | 2,697 | 8,091 |
| 26 | 31(i)Dismantling of an Isolator | Each | 5.00 | 627 | 3,135 |
| 27 | 31(j) Dismantling a Post/Pedestal Insulator. | Each | 5.00 | 204 | 1,020 |
| 28 | 31(m)(i)Manning Switching stations (SP/SSP) | Each/month | 100.00 | 19,148 | 19,14,800 |
| 29 | 31(m)(ii) Manning of Traction Sub-stations | Each/month | 30.00 | 30,878 | 9,26,340 |
| Schedule total | ₹1,40,13,813 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BrandsofmaterialsintendersofDSR-CPWD.pdf
ATTACHMENT
RB instructions regarding eBG
ATTACHMENT
System of verification of credentials
ATTACHMENT
CorrectionSlip1-10.pdf
ATTACHMENT
2023_09_05RBCE_CE-I-CTSystemofVerificationofTendererCredentials.pdf
ATTACHMENT
PCECircularforFoundationworksnearTrack.pdf
ATTACHMENT
ContractorMBGuidelines.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
2026_06_16Acceptanceofe-BankGuaranteee-BGinWorksContractsandPGMS_PMS_PSSAGC.pdf
ATTACHMENT
GCCACS12.pdf
ATTACHMENT
TenderDocumentT0622.09.26.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .